ML20212B505

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-373/97-15 & 50-374/97-15 on 970908-12 & Nov.Violation Involved Technical Inoperability of All Required ECCS Equipment & Subsequent Inability of Operating Staff to Comply W/Ts Required Actions
ML20212B505
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/10/1997
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20212B511 List:
References
50-373-97-15, 50-374-97-15, NUDOCS 9710280105
Download: ML20212B505 (4)


See also: IR 05000373/1997015

Text

- - _ _ _ _ - - _ _ _ - _ _ - -

.

.

,

p **4g

UNITED STATES

( g,N

s

g

. .,g

NUCLEAR REGULATORY COMMISSION

I)$

%-

REGION til

.

E'~h

!j

801 WARRENVILLE F.OAD

8

USLE. ILUNOIS M232 051

....+

October 10, 1997

Mr. W. T. Subalusky, Jr.

Site Vice President

LaSalle County Station

Commonwealth Edison Company

2601 North 21st Road

Marseilles,IL 61341

.

SUBJECT:

NRC INSPECTION REPORT NO. 50-373/97015(DRP); 50-374/97015(DRP) AND

NOTICE OF VIOLATION

Dear Mr. Subalusky:

On September 12,1997, the NRC completed a specialinspection at the LaSalle facility. The

purpose of the inspection was to review the circtimstances related to the September 4,1997,

.

event involving the inoperability of required emergency core cooling systems during outage

maintenance activities on Unit 1. The inspectors examined the plant equipment and personnel

response to the event. During the event, no operational safety limits were approached or

exceeded.

The inspectors determined that the event's immediate safety consequence was minimal since

redundant sptems were available for decay hr.at removal and core coverage. However, the

team concluded that the matter was of regulatory significance since the focus on shutdown risk

appeared to come at the expense of a sharp focus on compliance with the Technical

Specification requirements.

Based on the results of this inspection, the NRC dettemined that a violation of NRC requirements

occurred. The violation is cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding it are described in detailla the inspection report. The violation is of

concem because it involved the technicalinoperability of all required emergency core cooling

system equipment and the subsequent inabirity of the operating staff to comply with the

Technical Specification required actions.

You are required to respond to this letter and should follow the nstructions specified in the

enciosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether furter enforcement action is necessary to ensure compliance with regulatory

f

requirements. When you respond to this letter, the NRC requests that you include the results of

your root cause investigation documenting the reasons that contnbuted to the occurrence of this

situation,

t\\

<4

n a *a m'

9710280105 971010

PDR

ADOCK 05000373

G

PDR

l

~

--

- -

. _ _ _ _ __

_ _ _ _ _ _ _

_______- - - -

,

.

W. T. Subalusky, Jr.

-2-

I

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room (PDR).

Sincercly,

w

/

Melvyn N. Leach, Chlef

Operator Uconsing Branch

Division of Reactor Safety

Docket Nos.: 50-373; 50 ?74

'

License Nos.: NPF 11; NPF-18

Enclosures:

1.

Notice of Violation

2.

Inspection Report

50-373/97015(DRP); 50-374/97015(DRP)

cc w/encls:

R. J. Manning, Executive

Vice President, Generation

M. Wallace, Senior Vice

President, Corporate Services

E. Kraft, Vice President

DWR Operations

Liaison Officer, NOC BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

1. Johnson, Licensing

Operations Manager

Document Control Desk Licensing

F. Dacimo, Plant General Manager

P. Bames, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

Commission

1

_

_ - _ _ _ - _ _ _ _ _ _ - - - - - - - - - - - -

-

"

- _ _ _ _ _ _ _ - _ _ _ _ _ - _

__--

.

,

W. T. Subalusky, Jr.

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter, its

enclosi;res, and your response will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/Melvyn N. Leach

Melvyn N. Leach, Chief

Operator Licensing B anch

Division of Reactor Safety

Docket Nos.: 50-373;50-374

License Nos.: NPF-11; NPF-18

Enclosures:

1.

Notice of Violation

-

2.

Inspection Report

50-373/97015(DRP); 50 374/97015(DRP)

cc w/encis:

R. J. Manning, Executive

Vice President, Generation

M. Wallace, Senior Vice

President, Corporate Services

E. Kraft, Vice President

BWR Operations

Liaison Officer, NOC-BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

I. Johnson, Licensing

Operations Manager

Document Control Desk-Licens:ng

F. Dacimo, Plant General Manager

P. Bames, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Offico of the Attomey General

State L!alson Officer

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: R:\\lNSPRPTS\\ POWERS \\LASA\\LASA97015.DRP

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E"

= Copy with attach /enci "N" = No copy

OFFICE

Rlli

C-

Rlli

NAME

Vegellco

Leach

&#2. .

,DATE

10/ 7 /97

10/ /o /97

OFFICIAL RECORD COPY

l

_ _ _ - _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _

_ - _ _ _

_ - - - _ _ - -

.- . _ _ _ .

.

.

W. T. Subalusky, Jr.

-3-

i

Distribution:

Docket File w/encls

DRP w/encls

OC/LFDCB w/6ncis

TSS w/encls

PUBLIC IE-01 w/encls

DRS (2) w/encls

A. Beach w/encis

Rlli PRR w/encls

Deputy RA w/encls

RAC1 '(E Mall)

Rlli Enf. Coord, w/encls

CAA1 (E-Mail)

SRI LaSalle w/encls

DOCDESK (E-Mail)

Project Mgr., NRR w/encls

______- ___ ________--___-_____-_______-__ ________ ___ -________-_____-

_ -- _ _ _ -