ML20212B479
| ML20212B479 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/19/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20212B482 | List: |
| References | |
| NUDOCS 8612290260 | |
| Download: ML20212B479 (2) | |
See also: IR 05000456/1986057
Text
,
Docket No. 50-456
DEC 191986
Docket No. 50-457
Commonwealth Edison Company
ATIN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Mr. J. F. Schapker of
this office on October 7 through November 24, 1986, of activities at Braidwood
Station, Units 1 and 2, authorized by NRC Operating License No. NPF-59 and NRC
Construction Permit No. CPPR-133 and to the discussion of our findings with
Mr. G. E. Groth at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice. The inspection
showed that action had been taken to correct the identified violation and
to prevent recurrence. Our understanding of your corrective actions are
described in Paragraph 2.1. of the enclosed inspection report. Consequently,
no reply to the violation is required and we have no further questions
regarding this matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
v,5 5. . - e * , 5 b' J ,' d i I N' D '
8612290260 861219
~
.
g.
" " ' '
-
ADOCK 05000456
.
o
J. J. Harrison, Chief
Engineering Branch
Enclosures:
'
1.
2.
Inspection Reports
No. 50-456/86057(DRS); and
No. 50-457/86047(DRS)
See Attached Distribution
RIII
RIII
JpI
R
,8);tg)
, Q{
chapker/lms
Dan e son
rison
lttle
eil
N /R/M
<Lh
\\&
Qn
1
i t
l
W
Commonwealth Edison Company
2
DEC 191986
,_
Distribution
CC W/ enclosures.
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Earnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, OGC
J. Moore, OGC
G. Berry, OGC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
.
.
^9