Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212A241 + (ML20212A241)
- ML20212A242 + (ML20212A242)
- PNO-V-86-092, on 861212,reported That Quarterly Exposure Limit for Worker Exceeded.Right Hand Received Dose of 511.99 Rem,Left Hand 160 Mrem & Whole Body 114 Mrem.Worker Involved in Oct 1986 Reactor Coolant Pump Seal Overhaul + (ML20212A244)
- IR 05000456/1986033 + (ML20212A245)
- ST-HL-AE-1802, Requests Deletion of Tech Spec Surveillance Requirements for Turbine Overspeed Protection,Per SER (NUREG-0781) Requirement to Implement Inservice Insp Program for Stated Valves.Encls Include Justification & Proposed Tech Specs + (ML20212A246)
- ML20212A247 + (ML20212A247)
- ML20212A251 + (ML20212A251)
- PNO-II-86-045, on 860627,four PORVs Opened,Dropping Primary Sys Pressure from 2,235 Psi to 702 Psi & Temp from 550 F to 450 F in 6 Minutes.Cause Under Investigation.Valves Closed & Safety Injection Initiated + (ML20212A253)
- IR 05000409/1986015 + (ML20212A255)
- ML20212A256 + (ML20212A256)
- IR 05000206/1987001 + (ML20212A257)
- ML20212A258 + (ML20212A258)
- ML20212A259 + (ML20212A259)
- ML20212A261 + (ML20212A261)
- ML20212A262 + (ML20212A262)
- ML20212A263 + (ML20212A263)
- ML20212A266 + (ML20212A266)
- PY-CEI-NRR-0596, Annual Rept to Nrc,Perry Nuclear Power Plant 860318-1231 + (ML20212A267)
- ML20212A268 + (ML20212A268)
- ML20212A270 + (ML20212A270)
- 05000320/LER-1987-001-02, :on 870123,return to Svc Criteria of Procedure 4210-SUR-3811 Not Performed Properly.Caused by Personnel Error.Procedure Revised to Identify Required Actions + (ML20212A271)
- ML20212A274 + (ML20212A274)
- ST-HL-AE-5770, Submits Rev 10A to South Tx Project Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld + (ML20212A277)
- ML20212A278 + (ML20212A278)
- ML20212A279 + (ML20212A279)
- ML20212A281 + (ML20212A281)
- NG-97-1834, Forwards Rev 0 to GE-NE-B1100716-01, Duane Arnold RPV Surveillance Matls Testing & Analysis, IAW 10CFR50,App H. Adjusted Ref Temperture (ART) Was Predicted for Each Beltline Matl,Based on Methods of RG 1.99,rev 2 + (ML20212A282)
- IR 05000443/1986036 + (ML20212A283)
- ML20212A284 + (ML20212A284)
- 05000352/LER-1987-003, :on 870122,control Room Ventilation Sys Isolated & a Train of Control Room Emergency Fresh Air Supply (CREFAS) Sys Initiated.Caused by Design Deficiency. Control Room Ventilation Isolation Reset + (ML20212A285)
- ML20212A288 + (ML20212A288)
- ST-HL-AE-1932, Forwards Annotated Changes to FSAR Section 9.4.4.2.2 & Tables 9.4-1 & 9.4-2.4 Re Turbine Generator Bldg Supplementary HVAC Sys.Changes Based on Deletion of HVAC for Condensate Polishing Control Cabinets + (ML20212A289)
- ML20212A290 + (ML20212A290)
- IR 05000455/1986016 + (ML20212A291)
- ML20212A292 + (ML20212A292)
- IR 05000275/1987007 + (ML20212A293)
- ML20212A294 + (ML20212A294)
- PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement + (ML20212A297)
- IR 05000029/1986005 + (ML20212A298)
- ML20212A300 + (ML20212A300)
- ML20212A301 + (ML20212A301)
- ML20212A302 + (ML20212A302)
- ML20212A303 + (ML20212A303)
- ML20212A305 + (ML20212A305)
- ML20212A307 + (ML20212A307)
- ML20212A308 + (ML20212A308)
- ML20212A310 + (ML20212A310)
- PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs + (ML20212A311)
- ML20212A313 + (ML20212A313)
- ML20212A315 + (ML20212A315)
- ML20212A316 + (ML20212A316)