Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P701 + (ML20211P701)
- ML20211P702 + (ML20211P702)
- ML20211P703 + (ML20211P703)
- ML20211P705 + (ML20211P705)
- ML20211P706 + (ML20211P706)
- ML20211P707 + (ML20211P707)
- ML20211P708 + (ML20211P708)
- ML20211P709 + (ML20211P709)
- ML20211P711 + (ML20211P711)
- ML20211P712 + (ML20211P712)
- ML20211P713 + (ML20211P713)
- 05000374/LER-1986-012-06, :on 860620,electrical Termination at Inboard & Outboard MSIV Limit Switches Not Installed in Environ Qualification Tested Configuration.Caused by Deficient Installation Procedures.Procedures Revised + (ML20211P716)
- 05000416/LER-1997-004-03, :on 970911,failure to Declare Valve Inoperable During Work Having ISI Required Stroke Time Retest Occurred. Caused by Failure to Follow Work Control Process.Appropriate Personnel in Depts Involved Being Trained + (ML20211P717)
- IR 05000400/1986090 + (ML20211P718)
- ML20211P719 + (ML20211P719)
- ML20211P720 + (ML20211P720)
- ML20211P721 + (ML20211P721)
- ML20211P722 + (ML20211P722)
- ML20211P725 + (ML20211P725)
- ML20211P726 + (ML20211P726)
- ML20211P731 + (ML20211P731)
- 05000423/LER-1997-049, :on 970910,water Was Inadvertently Added to RCS While Entered Into LCO Action Statement.Caused by Inadequate Verification & Validation of Sys Configuration Prior to Conducting Pump Test.Counseled Operations Shift Personnel + (ML20211P732)
- ML20211P734 + (ML20211P734)
- ML20211P735 + (ML20211P735)
- ML20211P737 + (ML20211P737)
- ML20211P738 + (ML20211P738)
- NPL-97-0644, Submits Addl Response to Violations Noted in Insp Repts 50-266/96-18 & 50-301/96-18.Corrective Actions:Agrees W/Interpretation That Nf Boundary Extends to Bldg Surface + (ML20211P742)
- ML20211P743 + (ML20211P743)
- 05000334/LER-1997-031, :on 970919,identified That Routine Testing of Surveillance Procedures for ESF Were Inadequate.Caused by Inadequate Development of Procedures.Will Develop Addl Routine Surveillance Testing + (ML20211P746)
- ML20211P747 + (ML20211P747)
- ML20211P751 + (ML20211P751)
- ML20211P752 + (ML20211P752)
- ML20211P753 + (ML20211P753)
- ML20211P754 + (ML20211P754)
- ML20211P755 + (ML20211P755)
- IR 05000395/1987001 + (ML20211P756)
- ML20211P757 + (ML20211P757)
- ML20211P759 + (ML20211P759)
- ML20211P760 + (ML20211P760)
- ML20211P763 + (ML20211P763)
- ML20211P764 + (ML20211P764)
- ML20211P765 + (ML20211P765)
- ML20211P767 + (ML20211P767)
- ML20211P768 + (ML20211P768)
- ML20211P770 + (ML20211P770)
- ML20211P771 + (ML20211P771)
- ML20211P772 + (ML20211P772)
- ML20211P773 + (ML20211P773)
- ML20211P775 + (ML20211P775)
- ML20211P777 + (ML20211P777)
- 05000409/LER-1986-035, :on 861118,failure of Low turbine-condenser Vacuum Relay SK25/1 Caused Reactor Scram W/Excessively Fast Cooldown.Caused by Failure of Allied Control,Model MHYO-12A 115-volt Ac Relay + (ML20211P780)