Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-97-204, Forwards Response to Violations Noted in Insp Repts 50-254/97-11 & 50-265/97-11.Corrective Actions:Personnel Reponsible for Preparation & Review of Qcos 1000-26 Have Been Counseled on Procedural Deficiency + (ML20211F260)
- ML20211F262 + (ML20211F262)
- ML20211F263 + (ML20211F263)
- ML20211F264 + (ML20211F264)
- SVP-97-203, Forwards Response to Violations Noted in Insp Repts 50-254/97-11 & 50-265/97-11.Corrective Actions:On 970613, Operations Predefine Coordinator Began Tracking Limitation of 18 Breaker Discharges for Merlin Gerin Breakers + (ML20211F265)
- ML20211F268 + (ML20211F268)
- ML20211F269 + (ML20211F269)
- ML20211F271 + (ML20211F271)
- ML20211F272 + (ML20211F272)
- ML20211F275 + (ML20211F275)
- ML20211F276 + (ML20211F276)
- ML20211F278 + (ML20211F278)
- ML20211F279 + (ML20211F279)
- ML20211F280 + (ML20211F280)
- ML20211F282 + (ML20211F282)
- ML20211F284 + (ML20211F284)
- ML20211F285 + (ML20211F285)
- ML20211F288 + (ML20211F288)
- ML20211F289 + (ML20211F289)
- ML20211F290 + (ML20211F290)
- 05000327/LER-1986-044, :on 860925,determined That Surveillance Instructions Did Not Adequately Verify ECCS Flow.Caused by Procedural Inadequacy.Procedure Changed to Ensure Injection Flow Path + (ML20211F294)
- ML20211F296 + (ML20211F296)
- ML20211F297 + (ML20211F297)
- ML20211F300 + (ML20211F300)
- ML20211F303 + (ML20211F303)
- ML20211F307 + (ML20211F307)
- ML20211F308 + (ML20211F308)
- ML20211F309 + (ML20211F309)
- ML20211F316 + (ML20211F316)
- 05000220/LER-1999-004-01, :on 990723,reactor Scram Was Noted.Caused by Mechanical Pressure Regulator Suppressor Valve Failure. Cleaned Pressure Suppressor Valve & Provided Guidance for Valve Disassembly & Insp.With + (ML20211F319)
- 05000445/LER-1997-007, :on 970820,post-work Testing for Containment Isolation Valve Was Not Performed After Maint.Caused by Incorrect Belief That Work Did Not Involve Replacement. Tested Valve IAW TS Requirements + (ML20211F320)
- ML20211F321 + (ML20211F321)
- ML20211F326 + (ML20211F326)
- ML20211F329 + (ML20211F329)
- 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 + (ML20211F331)
- ML20211F332 + (ML20211F332)
- ML20211F335 + (ML20211F335)
- ML20211F337 + (ML20211F337)
- ML20211F342 + (ML20211F342)
- ML20211F343 + (ML20211F343)
- ML20211F344 + (ML20211F344)
- ML20211F345 + (ML20211F345)
- ML20211F348 + (ML20211F348)
- SVP-97-197, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-11 & 50-265/97-11.Corrective actions:1B RHR Gate Was Continually Attended Until Reactor Bldg Basement Was Released from LHRA Status + (ML20211F350)
- 05000424/LER-1997-006-02, :on 970830,H Monitoring Sys Train Was Rendered Inoperable.Caused by Personnel Error.Reviewed Tests Conducted During Period of Time Involved + (ML20211F355)
- ML20211F356 + (ML20211F356)
- ML20211F358 + (ML20211F358)
- ML20211F359 + (ML20211F359)
- IR 05000309/1986020 + (ML20211F360)
- ML20211F363 + (ML20211F363)
- ML20211F365 + (ML20211F365)