ML20211F288

From kanterella
Jump to navigation Jump to search
Accepts DOE long-term Surveillance Plan,Rev 2.0,for Maybell, Co,Umtra Project Site,Dtd July 1999.All Further Nrc/Doe Interaction on long-term Care for Maybell Site Will Be Conducted with DOE Grand Junction Project Ofc
ML20211F288
Person / Time
Issue date: 08/26/1999
From: Surmeier J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
References
REF-WM-69 NUDOCS 9908300294
Download: ML20211F288 (3)


Text

,, .-e f@ REG .

p" " UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 0001 o ,

Y+9

          • August 26, 1999 Mr. George Rael, Director U.S. Department of Energy Environmental Restoration Division Albuquerque Operations Office ERD /UMTRA P.O. Box 5400 Albuquerque, NM 87185-5400

SUBJECT:

ACCEPTANCE OF THE LONG-TERM SURVEILLANCE PLAN FOR THE MAYBELL, COLORADO, URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITE

Dear Mr. Rael:

The U.S. Nuclear Regulatory Commission (NRC) staff hereby accepts the U.S. Department of Energy's (DOE's) Long-Term Surveillance Plan (LTSP) Revision 2.0, dated July,1999, for the Maybell, Colorado, Uranium Mill Tailings Remedial ktion Project site. This action establishes the Maybell site under the general license in 10 CFR ;' art 40.27.

The staff made a determination that all of the pre,iouey identified open issues raised in NRC's transmittal dated June 22,1998, have been ad iquatel> addressed in the July,1999 version of the LTSP for the Maybell site. This version of t'ie LTSn'(Revision 2.0) incorporated page changes submitted in DOE's letter of August 24,1999, irh Rewsion 1.0 of the LTSP dated February,1999.

The LTSP satisfies the requirement set forth in the Uranium Mill Tailing Radiation Control Act of 1978 for the long-term surveillance of a disposal site, and all requirements in 10 CFR Part 40.27 for an LTSP. In accordance with DOE's guidance document for long-term surveillance, all further NRC/ DOE interaction on the long-term care for the Maybell site will be conducted with DOE's Grand Junction Project Office.

{t tamawganggy9 #*

300061 o 9908300294 990826 PDR WASTE '

Wd-69 PDR

^

G. Rael 2 if you have any questions concerning this letter, please contact the NRC Project Manager for the Maybell site, Robert Carlson, (301) 415-8165.

Sincerely, i I

H.

l l John J. Surmeier, Chief Uranium Recovery and ' Low Level Waste Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards cc: W. Woodworth, DOE Alb F. Bosiljevac, DOE Alb S. Hamp, DOE Alb ,

E. Artiglia, TAC Alb l l R. Edge, DOE GRJ R. Cornish, DOE Alb J. Deckler, CDPHE l

DISTRIBUTION w/ Encl,: File Center PUBLIC NMSS r/f URLL r/f

CNWRA RCarlson DRom TJohnson l JLusher RJohnson WFord ACNW JHolonich CAbrams WvonTill DOCUMENT NAME
S:\DWM\URL'.\ PAS \NATURCR.WPD OFC URLL [,, UQ,/J C URlks ,

NAME Rvon Till: DG JSu DATE 8/ O /99 8/llo /99 N 8tle /99 OFFICIAL RECORD COPY l This docum he4 Meet be made available to the PUBLIC &/ M Initials) (Date) i

E[i,,

G. Rael : -4

=

2 1

If you have any questions concerning this letter, please contact the NRC Project Manager for the Maybell site, Robert Carlson, (301) 415-8165.

Sincerely, l

~

Original Signed By Dan Gillen for John J. Surmeier, Chief Uranium Recovery and Low-Level Waste ' Branch )

Division of Waste Management )

Office of Nuclear Material Safety 1 and Safeguards f x

cc: W. Woodworth, DOE Alb F. Bosiljevac, DOE Alb .

S. Hamp, DOE Alb

. E.' Artiglia, TAC Alb R. Edge, DOE GRJ R. Cornish, DOE Alb J. Deckler, CDPHE

,