Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5482, Requests Schedule for Response to 970620 NRC Rai,Re Incorporation of Generic Implementation Procedure Into FSAR, Be Extended to 980130 + (ML20211E772)
- ML20211E773 + (ML20211E773)
- ML20211E774 + (ML20211E774)
- ML20211E776 + (ML20211E776)
- ML20211E777 + (ML20211E777)
- ML20211E778 + (ML20211E778)
- ML20211E779 + (ML20211E779)
- ML20211E782 + (ML20211E782)
- ML20211E783 + (ML20211E783)
- ML20211E784 + (ML20211E784)
- ML20211E785 + (ML20211E785)
- ML20211E788 + (ML20211E788)
- ML20211E790 + (ML20211E790)
- ML20211E791 + (ML20211E791)
- ML20211E793 + (ML20211E793)
- ML20211E795 + (ML20211E795)
- ML20211E798 + (ML20211E798)
- 05000409/LER-1986-016, :on 860510 & 13,static Inverter 1A Failed & Transferred Bus 1A to Alternate Source.Caused by Diode Short in Static Inverter 1A Power Supply.Inverters Replaced + (ML20211E800)
- ML20211E801 + (ML20211E801)
- ML20211E802 + (ML20211E802)
- 05000280/LER-1986-016, :on 860510,lift Settings for Five Safety Valves on Main Steam Line B Found 3% Greater than Lift Setpoints. Caused by Setpoints Set Too High During 841223 Calibr Due to Unreliable Indication + (ML20211E803)
- ML20211E804 + (ML20211E804)
- ML20211E805 + (ML20211E805)
- ML20211E806 + (ML20211E806)
- ML20211E809 + (ML20211E809)
- IR 05000498/1987001 + (ML20211E812)
- ML20211E813 + (ML20211E813)
- IR 05000213/1999002 + (ML20211E814)
- ML20211E815 + (ML20211E815)
- ML20211E816 + (ML20211E816)
- ML20211E817 + (ML20211E817)
- ML20211E818 + (ML20211E818)
- IR 05000461/1986023 + (ML20211E819)
- ML20211E820 + (ML20211E820)
- ML20211E822 + (ML20211E822)
- ML20211E823 + (ML20211E823)
- ML20211E824 + (ML20211E824)
- ML20211E828 + (ML20211E828)
- IR 05000353/1986021 + (ML20211E829)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided + (ML20211E833)
- 05000263/LER-1986-012, :on 860508 Five Penetrations of Transversing in-core Probe Sys Omitted from double-gasket Seal Testing Procedure.Procedure Revised.Penetrations Tested & Drawings Reviewed + (ML20211E835)
- ML20211E837 + (ML20211E837)
- ML20211E839 + (ML20211E839)
- ML20211E841 + (ML20211E841)
- BECO-86-162, Forwards Corrected Table 4.1.1, Reactor Protection Sys (Scram) Instrumentation Functional Tests Min Functional Test Frequencies for Safety Instrumentation & Control Circuits, for 860227 Proposed Tech Spec Change Re Analog Trip Sys + (ML20211E842)
- ML20211E843 + (ML20211E843)
- ML20211E848 + (ML20211E848)
- ML20211E850 + (ML20211E850)
- 05000245/LER-1997-035-01, :on 970826,ECCS Actuation LCO Was Not Met. Caused by Human Error (Technical Oversight) When Interlock Was Added to Ts.Performed Review to Determine Whether Containment Spray Interlock Should Be Controlled in TS + (ML20211E851)
- ML20211E852 + (ML20211E852)
- 3F1086-13, Supplemental Application for Amend to License DPR-72, Incorporating Rev 3 to Change Request 103,to Revise Tech Specs Re Administrative Controls + (ML20211E853)