ML20211E839

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1986
ML20211E839
Person / Time
Site: Farley 
Issue date: 05/31/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8606160280
Download: ML20211E839 (5)


Text

_

..~- -

j 7

)

I i

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 j

NARRATIVE SIM4ARY OF OPERATIONS i

May, 1986

)

i The Cycle IV - V refueling outage continued into the month of May.

I l

During start-up on May 13, before the generator was tied on line, the reactor tripped due to low-low steam generator level which resulted from

)

loss of hydraulic fluid pressure to the 2A steam generator feed pump.

The reactor was restarted and the generator was tied on line on May 13, 1936.

l The generator was taken off line on May 14 to perform the turbine overspeed trip test and additional post-outage maintenance.

The unit 4

returned to operation on May 22, but was taken off line briefly on May 23

{

to perform a turbine-generator balance move.

A significant power reduction occurred on May 28.

Power was reduced due to oscillation of a j

steam generator feed pump governor valve. This was caused by a failure i

of a controller card in the control circuit, i

The following major safety-related maintenance was performed in the month of May:

I 1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

l 2.

Corrected problem with alignment of 2C reactor coolant pump j

motor lower bearing during shutdown following overspeed test.

i i

1 i

\\

I.

f l

J 1

i 8606160280 860604 PDR ADOCK 05000364 R

PDR pa

\\\\ s 1

OPERATING DATA REPORT DOCKET NO.

50-364 DATE 6/4/86 COMPLETED BY J.D. Woodard TELEPHONE (205)899-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit 2 Notes

2. Reporting Period: May, 1986
1) Cumulative data since 2652 7-30-81, date of commerciai
3. Licensed Thermal Power (MWt):

Peration

4. Nameplate Rating (Gross MWe):

860 829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

872.2 829.2

7. Maximum Dependable Capacity (Net MWe):

~. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) S*nce Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. lf Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A O

This Month Yr..to Date Cumulative

11. Hours In Reporting Period 744 1.621 42.408
12. Number Of Hours Reactor Was Critical 306.9 2,532.9 41,339.5 0.0 0.0 138.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 244.4 2,462.8 35,855.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 396,193 6,134,286 90,368,836
17. Gross Electrical Energy Generated (MWH) 122,562 2,037,386 29,760,074
18. Net Electrical Energy Generated (MWH) 100,358 1,919,110 28,208,350
19. Unit Service Factor 32.8 68.0 84.5
20. Unit Availability Factor 32.8 68.0 84.5 16.3 63.9 81.9
21. Unit Capacity Factor (Using MDC Net) 16.3 63.9 80.2
22. Unit Capedty Factor (Using DER Net) 2.6 1.8 4.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status t Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 (9/77 )

DOCKET NO.

50-364 2

g g.g.

DATE June 4, 1986 J.D. Woodard C05fPLETED BY (205) 899-5156 17.LEPHONE 310NTil May i

DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net)

(31We-Net)

O g7 0

2 n

Ig 0

~~ ~ ^ g -

--......... _.. g,..

o 3

l 4'

0 4

0 0

5 0

21 6

0 22 28 7

0 23 99 g

n

4 185 9

0 25' 229 10 0

26 448 0

618 11 27 i

12 0

23 492 13 51 23 768 14 n

30 825 s

15 0

33 sig i

16 n

RLTTRUCDONS On this form:t. list the aver:ge daily umt power levelin MWe Net for esch d:y in the reporting month. Campute to

, the nesre:t whole me;swatt.

O

~

(9@7)

O O

O UNIT SilU1 DOWNS AND POWER REDUC 110NS DOCKET NO.

50-364 UNIT NAblE 3 M.

Farlev-Unit 2 DATE June 4 1986 HEPORT hlONT)3 May COnlPLETED BY 3.D. Woodard i

TELEPilONE (205) 899-5156 Q

5 3 "g

Liteinsee

[g

1, Cause & Cussective No.

Daic g

3g n

, s se Event g?

e-1 Aceh>4 to y$

Ug Repost #

Psqvent Hecussence F

44 O U

d 002 860501 S

300.6 C

1 N/A N/A N/A The Cycle IV - V refueling outage continued from 4-04-86.

003 860514 S

192.4 B

1 N/A N/A N/A Unit shut down for turbine overspeed trip test and additional post-outage -

maintenance.

004 860523 F

6.6 B

1 N/A N/A N/A Unit taken off line to perform turbine-generator balance move.

005 860526 F

0.0 H

4 N/A SJ SC Power was reduced due to oscillation 4

of a steam generator feed pump governor valve. This w'as caused by the failure of a controller card in the control circuit. The card was replaced.

1 i

I 2

3 4

F: Fosced Reason:

nieehoJ:

Exhibit G -Innesuctions S: Stheduled A Equipment Failuse(Explain) 1 -klanual for Prepasation of Data ll klaintenance ad Test 2Wnual Scram.

Entsy Sheets fos 1.icensee C llefueling 3 Autunutic Sesam.

Event Repius (I.ER) File (NUREG-D llegulatiny Resiniction 4-Othes (Explain) 0161)

E Opesator Tsaining a license Examinatino F Administsative 5

G Opesational Essus (lixplain) l'shibia I - Same Sousee (9/77) 11 Olhei (Explain)

e'.

M;iHng Addr2ee Alabama Power Company 600 North 18th Street Post Off ce Box 2641 Dirmingham, Alabama 35291 Telephone 205 783-6090 -

R. P. Mcdonald Senior Vice President Fhntridge Building AlabamaPower "w s.: rvr mect s ste, June 10,~1986 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very trul,

i

?

/

R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy).

9