Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-24562, Monthly Operating Rept for Sept 1986 + (ML20211C862)
- 05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info + (ML20211C865)
- ML20211C866 + (ML20211C866)
- ML20211C870 + (ML20211C870)
- ML20211C871 + (ML20211C871)
- ML20211C872 + (ML20211C872)
- ML20211C873 + (ML20211C873)
- 05000412/LER-1999-009, :on 990817,shutdown Was Initiated IAW TS 3.8.1.1 Due to Degraded Flow in Edg.Caused by Ineffective Programs to Keep Live Zebra Mussels from Entering Sws.Plant Zebra Mussel Control Plan Will Be Reviewed & Revised + (ML20211C874)
- ML20211C875 + (ML20211C875)
- ML20211C878 + (ML20211C878)
- 2CAN099701, Application for Amend to License NPF-6,reducing Min Required Reactor Coolant Sys Flow Rate Requirements Listed in 3.2.5 Until ANO-2 SGs Are Replaced + (ML20211C880)
- ML20211C881 + (ML20211C881)
- ML20211C882 + (ML20211C882)
- ML20211C883 + (ML20211C883)
- ML20211C885 + (ML20211C885)
- ML20211C888 + (ML20211C888)
- PY-CEI-NRR-0457, Forwards Executed Amend 1 to Indemnity Agreement B-98 for License NPF-45.Two Corrections Noted Changing License SNM-1929 to SNM-1928 & Duquesne Co to Duquesne Light Co + (ML20211C889)
- ML20211C890 + (ML20211C890)
- ML20211C891 + (ML20211C891)
- ML20211C892 + (ML20211C892)
- TXX-6260, Interim Deficiency Rept CP-86-04 Re Placement of Inserts in Proximity of Loaded Embedded Plates & Design/Const Requirements for Min Separation of Welded Attachments to Embedded Strip Plates.Next Rept Expected by 870429 + (ML20211C893)
- ML20211C894 + (ML20211C894)
- ML20211C895 + (ML20211C895)
- ML20211C896 + (ML20211C896)
- ML20211C897 + (ML20211C897)
- ML20211C899 + (ML20211C899)
- ML20211C900 + (ML20211C900)
- ML20211C902 + (ML20211C902)
- ML20211C903 + (ML20211C903)
- ML20211C904 + (ML20211C904)
- ML20211C905 + (ML20211C905)
- ML20211C906 + (ML20211C906)
- ML20211C907 + (ML20211C907)
- ML20211C909 + (ML20211C909)
- ML20211C910 + (ML20211C910)
- ML20211C911 + (ML20211C911)
- ML20211C912 + (ML20211C912)
- ML20211C913 + (ML20211C913)
- ML20211C914 + (ML20211C914)
- ML20211C916 + (ML20211C916)
- ML20211C917 + (ML20211C917)
- 05000483/LER-1986-033, :on 860920,control Room Ventilation Isolation Occurred.Caused by Blown Fuse on Control Room Radiation Monitor.Fuse Replaced.Monitor Restored.Downscale ESF Actuation Feature to Be Removed from Monitors + (ML20211C918)
- ML20211C920 + (ML20211C920)
- ML20211C921 + (ML20211C921)
- TXX-6042, Interim Deficiency Rept CP-86-72 Re Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860606.Issue Divided to Segregate Small Bore Piping & Supports from Large Bore.Next Rept Expected by 861201 + (ML20211C922)
- ML20211C924 + (ML20211C924)
- ML20211C925 + (ML20211C925)
- ML20211C926 + (ML20211C926)
- ML20211C928 + (ML20211C928)
- ML20211C929 + (ML20211C929)
- TXX-6261, Final Deficiency Rept CP-86-44 Re Design/Const Requirements for Min Separation of Welded Attachments to Embedded Strip Plates.Initially Reported on 860605.Scope of Sdar CP-86-04 Expanded to Include Deficiency Identified in Sdar CP-86-44 + (ML20211C930)