ML20211C890
| ML20211C890 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/17/1984 |
| From: | Dupont S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Lynch M Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20211C861 | List: |
| References | |
| FOIA-86-370, FOIA-86-A-147 NUDOCS 8610220048 | |
| Download: ML20211C890 (1) | |
Text
.i January 17, 1984 MEMORANDUM TO: ~ M. D. Lynch, Project Manager, Division of Licensing, NRR THRU:
J. Streeter, Chief, Engineering Branch No.1, RIII 4 4. Ages.,cideb Tat PS% heh m,ft.in FROM:
S. G. DuPont, Reactor Inspector, Test Program section, RIII
SUBJECT:
USE OF BN-TOP-1 FOR THE FERMI-2 PREOPERATIONAL CONTAINMENT LEAKAGE TESTING PER APPENDIX J.
As discussed with you on January 16, 1984, the Region III staff is taking exception with the Fermi-2 facility's adoption of a minimum test duration of eight hours for a Type A containment integrated leak rate test to be performed as a preoperational test in accordance with the Bechtel Topical Report, BN-TOP-1, " Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Plants", Revision 1.
The Region's staff position of requiring a complete collection of test data from a minimum test duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for preoperational testing has been established with the Type A tests performed at LaSalle-1 and 2, and Callaway facilities, and is in agreement with the Region II staf f position.
Our position differs from your office's position, as described in the j
l December 12, 1983, letter to Mr. Harry Tauber from Mr. B. J. Youngblood, only in requiring an initial or preoperational test. duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to establish a wide collection base to be used by future Type A tests k
using the BN-TOP-1 report.
by 46 5
1 We would appreciate any further comments from your staff on this matter. t 8610220048 861009 PDR FOIA PUNTE86-A-147 PDR M g.
$ ; 6 5 t),c.
Stevie G. DuPont Reactor Inspect
[
Test Program Section
/{,)
Region III