RBG-24562, Monthly Operating Rept for Sept 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1986
ML20211C862
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/30/1986
From: Booker J, Martin R
GULF STATES UTILITIES CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
RBG-24562, NUDOCS 8610220042
Download: ML20211C862 (5)


Text

o DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-86-009 DATE October 3, 1986 COMPLETED BY R.

H. Martin TITLE Sr. Systems Eng.

TELEPHONE 635-6094 X2672 MONTH SEPTEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)

(MWe-Net) 1.

0 17.

931 2.

120 18.

923 3.

55 19.

915 4.

837 20.

926 5.

927 21.

925 6.

910 22.

873 7.

924 23.

932 8.

931 24.

917 9.

811 25.

886 10.

908 26.

929 11.

903 27.

913 12.

910 28.

930 13.

911 29.

923 14.

934 30.

925 15.

892 31.

N/A 16.

903 0610220042 060930 hI gDR ADOCK 03000400 V

I I PDH l1

e DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-86-009 DATE OCTOBER 3, 1986 COMPLETED BY R.

H. Martin TITLE Sr. Systems Eng.

TELEPHONE 635-6094 X2672 PAGE 1

OF 2

OPERATING STATUS 1.

REPORTING PERIOD: SEPTEMBER 1986 GROSS !!OURS IN REPORTING PERIOD:

720 2.

CURRENTLY AUTi!ORIZED POWER LEVEL (Mwt) :

2894 MAX. DEPEND CAPACITY (MWe-Ne t) :

N/A DESIGN ELECTRICAL RATING (Mwo-Net) :

936 3.

POWER LEVEL TO WilICll RESTRICTED (IF ANY) (MWe-Net) :

N/A 4.

REASONS FOR RESTRICTION (IF ANY):N/A TilIS YR TO CUMU-MONTl!

DATE LATIVE 5.

NUMBER OF !!OUllS REACTOR WAS CRITICAL...

670.95 4421.45 5591.85 6.

REACTOR RESERVE SilUTDOWN !!OURS.........

0 0

0 7.

IlOURS GENERATOR ON LINE...............

662.05 3806.2 3961.3 8.

UNIT RESERVE SilUTDOWN !!OURS...........

0 0

0 9.

GROSS TilERMAL ENERGY GENERATED (MWil)..

1,850,256 8,060,130*

8,190,058 l10.

GROSS ELECTRICAL ENERGY GENERATED (MWil) 631,402.03 2,675,162.7 2,694,522.7 11.

NET ELECTitICAL ENERGY GENERATED (MWII).

593,479.2 2,463,576.4 2,481,076.4

  • Thio number has been reduced by a f actor of 24,992 MWif(Til) because of a math arror in numming the totals was introduced in the June report.

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-86-009 DATE OCTOBER 3, 1986 COMPLETED BY R.

H.

Martin TITLE Sr. Systems Eng.

TELEPHONE 635-6094 X2672 PAGE 2

OF 2

OPERATING STATUS THIS YR TO CUMU-MONTH DATE LATIVE 12.

REACTOR SERVICE FACTOR...........

93.2 76.8 76.8 13.

REACTOR AVAILABILITY FACTOR......

93.2 76.8 76.8 14.

UNIT SERVICE FACTOR..............

92.0 69.2 69.2 15.

UNIT AVAILABILITY FACTOR.........

92.0 69.2 69.2 016.

UNIT CAPACITY FACTOR (Using MDC)

N/A N/A N/A 17 UNIT CAPACITY FACTOR (Using 88.1 64.0 64.0 Design MWe) 18.

UNIT FORCED OUTAGE RATE..........

8.1 24.6 24.6 19.

SHUTDOWNS SCllEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Local Leak Rate testing October 4, 1986 - 4 weeks 20.

IF S!!UTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACilIEVED INITIAL CRITICALITY N/A 10-31-85 0037 INITIAL ELECTRICITY N/A 12-03-85 0344

  • COMMERCIAL OPERATION N/A 6-16-86
  • Completion of S/U testing and proposed date for declaration of in-service bafore the Public Utility Commission of Texas,

,i 1

I l

I UNIT SHUTDOWNS AND POWER REDUCTIONS I

i i

l l

l 1

l 1

I I

i 11 i TIME TIME I

l l

l H

l START H RECOVER H l

l I

L

?

OF l

FROM DURATION TYPE REASON l METHOD l CORRECTIVE ACTIONS / COMMENTS l

NO DATE OCCURANCE OCCURANCE fHOURS)

NOTE f il NOTE (2)lNOTE f31 1

l 1

860901 0000 0609 g

g q

g g 30.15 F

A 3

l1.

Resultedfromfaultedtransformers,failedrelay,l l

l l

860902 l H

See LER #86-055 l

l l

l l

H l2 l860902 I

l 860903

! 27.80 l

l 2.

Resulted from trapped air in reference leg.

l 1258 1646 F

H 3

g l

l l

l l

l l

See LER #86-056 l

l 1

l l

4 l

l l

1 l

I I

l i

I l

I l

l l

1 l

I l

l 1

l l

I l

SUMMARY

1 i

I i

I I

I I

ll i

L NOTE (1) TYPE OF OCCURANCE:

ENTER CODE I l DOCKET NO. 50/458 i

F:

FORCED l

RIVER BEND STATION UNIT 1 l

l St SCHEDULED l

,I l

ll REPORT NO.

R-86-009 l NOTE (2) REASON FOR OCCURANCE:

ENTER CODE ll l

l l

A:

EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) ll REPORT MONTH September 1986 l

l B: MAINTENANCE OR TEST

~

ll l

l C: REFUELINC ll l

D:

REGULATORY RESTRICTION l

11 l

E: OPERATOR TRAINING AND LICENSE EXAMINATION ll DATE October 2, 1986 l

1 F: ADMINISTRATIVE 11 I

l G

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) hl R. H. Martin I

i H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

I COMPLETED BY ( PRINT l

l NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER:

ENTER CODE I

/

$ $dfa-l 1: MANUAL ll SICNATURE I

l 2: MANUAL SCRAM ll l

H 3: AUTOMATIC SCRAM 11 Sr. Systems Eneineer i

I 4: OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS) ll TlTLE l

I ll l

ll TELEPIIONE 504-635-6094 Ext. 2672 l

FORM-SOM-024 REV. O

B.Bg GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFFICE BOX 220 ST FRANCISVILLE. LOUIS!ANA 7077S ARE A CODE 504 635 6094 346 8651 October 13, 1986 RBG-24562 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.

Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Scroggins:

River Bend Station - Unit 1 Docket No. 50-458 Enclosed is Gulf States Utilities Company's Monthly Operating Report for September 1986 for River Bend Station (RBS) - Unit 1.

This report is submitted in accordance with RBS Technical Specification 6.9.1.6.

Sincerely, 4

J.

E.

Booker Manager-River Bend Oversight River Bend Nuclear Group S 'S6h JEB/ER /DAS/je Enclosure cc:

Regional Administrator U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 U.S. NRC Document Control Desk

-i en.

/

l

, -..