Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209E851 + (ML20209E851)
- ML20209E852 + (ML20209E852)
- ML20209E853 + (ML20209E853)
- ML20209E855 + (ML20209E855)
- ML20209E858 + (ML20209E858)
- ML20209E860 + (ML20209E860)
- ML20209E861 + (ML20209E861)
- ML20209E862 + (ML20209E862)
- 05000370/LER-1985-014-02, :on 850517,reactor Critical W/Bank C Control Rods Below Min Tech Spec Insertion Limits.Caused by Incorrect Coefficients in Xenon Predict Computer Program. Control Rods Reinserted.Procedures Modified + (ML20209E864)
- ML20209E865 + (ML20209E865)
- IR 05000701/2010015 + (ML20209E866)
- ML20209E867 + (ML20209E867)
- ML20209E868 + (ML20209E868)
- ML20209E869 + (ML20209E869)
- ML20209E870 + (ML20209E870)
- ML20209E871 + (ML20209E871)
- ML20209E872 + (ML20209E872)
- 05000369/LER-1985-019-01, :on 850530,cable Transits Penetrating Units 1 & 2 Reactor Bldg Walls Discovered to Be Fire Barriers.Caused by Oversight During Development of Fire Barrier Insp Procedure.Procedures Revised + (ML20209E874)
- ML20209E875 + (ML20209E875)
- ML20209E877 + (ML20209E877)
- ML20209E878 + (ML20209E878)
- ML20209E880 + (ML20209E880)
- ML20209E881 + (ML20209E881)
- ML20209E882 + (ML20209E882)
- ML20209E883 + (ML20209E883)
- ML20209E884 + (ML20209E884)
- ML20209E885 + (ML20209E885)
- ML20209E886 + (ML20209E886)
- ML20209E887 + (ML20209E887)
- ML20209E889 + (ML20209E889)
- ML20209E890 + (ML20209E890)
- ML20209E892 + (ML20209E892)
- ML20209E893 + (ML20209E893)
- 05000382/LER-1986-016, :on 860804 & 21,boron Concentration for Safety Injection Tanks Fell Below Tech Spec Limit.Caused by Insufficient Procedural Requirements.Procedure Change Will Be Made to Prevent Recurrence + (ML20209E895)
- ML20209E896 + (ML20209E896)
- ML20209E897 + (ML20209E897)
- ML20209E899 + (ML20209E899)
- ML20209E901 + (ML20209E901)
- ML20209E902 + (ML20209E902)
- ML20209E905 + (ML20209E905)
- ML20209E907 + (ML20209E907)
- ML20209E908 + (ML20209E908)
- ML20209E909 + (ML20209E909)
- PNO-III-87-017, on 870130,facility Received Full Power Ol. Licensee Expects to Go Beyond 5% Power in Early Feb.State of Il Notified + (ML20209E910)
- ML20209E912 + (ML20209E912)
- ML20209E913 + (ML20209E913)
- ML20209E914 + (ML20209E914)
- IR 05000334/1985010 + (ML20209E917)
- ML20209E918 + (ML20209E918)
- ML20209E922 + (ML20209E922)
- ML20209E923 + (ML20209E923)