Category:INSPECTION REPORT
MONTHYEARML20217G4831999-10-14014 October 1999 Insp Rept 70-7002/99-207 Containing Proprietary Info on 990920-23.No Violations Noted.Major Areas Inspected: Selective Exams of Core Procedures & Representative Records, Interviews with Personnel & Observations of Activities ML20217F5551999-10-0808 October 1999 Insp Rept 70-7002/99-12 on 990810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20211Q7851999-09-10010 September 1999 Insp Rept 70-7002/99-205 on 990816-20.No Violations Noted. Major Areas inspected:Y2K Readiness Program ML20211H3121999-08-27027 August 1999 Insp Rept 70-7002/99-09 on 990629-0809.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210P7111999-08-10010 August 1999 Insp Rept 70-7002/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Plant Support.Inspector Concluded That Certificatee Was Effectively Implementing Radioactive Matls Transportation Program ML20209F1061999-07-12012 July 1999 Partially Withheld Insp Rept 70-7002/99-204 Conducted on 990614-17.No Violations Noted.Details Withheld,Per 10CFR2.790 ML20209E9011999-07-0909 July 1999 Insp Rept 70-7002/99-08 on 990614-17.Violation Noted.Major Areas Inspected:Security Program,Including Physical Security,Storage and Control of Classified Matter, Classification & Communications & Computer Security ML20209E8781999-07-0909 July 1999 Insp Rept 70-7002/99-07 on 990517-0629.No Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20209B8001999-07-0101 July 1999 Insp Rept 70-7002/99-203 on 990607-11.No Violations Noted. Major Areas Inspected:Hazard Identification & Assessment, Maintenance & Insp,Compliance Plan Issues,Conduct of Operations in X-705 & Audits & Insps ML20207H5111999-06-11011 June 1999 Insp Rept 70-7002/99-05 on 990406-0514.Violations Noted. Major Areas Inspected:Operators Response to Small UF6 Release in Bldg X-330,which Was Effective & Consistent with Guidance Provided in Alarm Response & off-normal Procedures ML20207A0341999-05-21021 May 1999 Insp Rept 70-7002/99-04 on 990222-0312.Violations Noted. Major Areas Inspected:Corrective Action Program & Implementation of Nuclear Criticality Safety Corrective Action Plan ML20206E4371999-04-29029 April 1999 Insp Rept 70-7002/99-03 on 990222-0406.Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20206B5701999-04-22022 April 1999 Insp Rept 70-7002/99-06 on 990322-26.Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support (Emergency Preparedness) ML20196K4091999-03-19019 March 1999 Partially Withheld Insp Rept 70-7002/99-202 on 990222-26.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20204D8611999-03-17017 March 1999 Insp Rept 70-7002/99-01 on 990112-0222.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203G9041999-02-16016 February 1999 Insp Rept 70-7002/98-19 on 981209-990108.No Violations Noted.Major Areas Inspected:Circumstances Surrounding 981209 Fire Involving Side Purge Cascade,Evaluations of Plant Equipment Performance & Plant Personnel Response to Event ML20202D7631999-01-26026 January 1999 Insp Rept 70-7002/98-18 on 981123-990112.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Engineering ML20199J7361999-01-20020 January 1999 Insp Rept 70-7002/99-201 on 990105-07.No Violations Noted. Major Areas inspected:high-risk Chemical Release Release Possibilities That May Occur as Result of Seismic Initiating Event ML20198F2771998-12-18018 December 1998 Insp Rept 70-7002/98-208 on 981130-1204.Violations Noted. Major Areas Inspected:Status & Adequacy of Nuclear Criticality Safety Corrective Action Plan ML20198B5651998-12-14014 December 1998 Insp Rept 70-7002/98-17 on 981013-1123.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support.Weaknesses Identified with Certificatee Dispositioning of Potentially Nonconforming Conditions ML20195H3021998-11-12012 November 1998 Insp Rept 70-7002/98-16 on 981019-23.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20155H9751998-11-0404 November 1998 Insp Rept 70-7002/98-15 on 980831-1013.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20155B6551998-10-27027 October 1998 Partially Withheld Insp Rept 70-7002/98-207 Conducted on 980928-1002.Rept Details Withheld (Ref 10CFR2.790) ML20155B5381998-10-23023 October 1998 Insp Rept 70-7002/98-14 on 980831-0904.Violation Noted. Major Areas Inspected:Implementation of Compliance Plan Issues & Adequacy of Internal Self Assessment of Closure Status of Compliance Plan Issues ML20153G9281998-09-25025 September 1998 Insp Rept 70-7002/98-13 on 980720-0830.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20237B8991998-08-17017 August 1998 Insp Rept 70-7002/98-12 on 980727-31.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Plant Support ML20236V5671998-07-30030 July 1998 Insp Rept 70-7002/98-11 on 980608-0720.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20236L4371998-07-0202 July 1998 Insp Rept 70-7002/98-07 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20249B0521998-06-16016 June 1998 Insp Rept 70-7002/98-10 on 980601-05.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance & Plant Support ML20249A5811998-06-15015 June 1998 Insp Rept 70-7002/98-09 on 980608-11.No Violations Noted. Major Areas Inspected:Selected Records,Interviews W/Personnel & Direct Observation of Work Activities in Area of Physical Security ML20248L4371998-06-0505 June 1998 Insp Rept 70-7002/98-204 on 980209-18.Violation Noted.Major Areas Inspected:Adequacy of Licensee Actions to Close NCS- Specific Items in DOE/ORO-2027/R4, Plan for Achieving Compliance W/Nrc Regulations at Portsmouth Gaseous .. ML20248H7381998-06-0202 June 1998 Insp Rept 70-7002/98-206 on 980427-0501.Violations Noted. Major Areas Inspected:Highest Risk Activities in High Enriched U Feed Area,Extended Range Product Area & U Recovery Activities in X-705 Building ML20248F5461998-06-0101 June 1998 Partially Withheld Insp Rept 70-7002/98-205 on 980427-0501 (Ref 10CFR2.790).No Violations Noted ML20248E7841998-05-29029 May 1998 Insp Rept 70-7002/98-08 on 980427-0508.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20247L0751998-05-18018 May 1998 Insp Rept 70-7002/98-05 on 980309-0508.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20217H0241998-03-27027 March 1998 Insp Rept 70-7002/98-03 on 980126-0308.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance & Engineering ML20217G6721998-03-27027 March 1998 Insp Rept 70-7002/98-04 on 980302-06.Violations Noted. Major Areas Inspected:Maintenance & Surveillance,Plant Support,Training Program,Transportation Program & self-assessment Program ML20248K6021998-03-12012 March 1998 Partially Withheld Insp Rept 70-7002/98-203 on 980209-13.No Violations Noted.Details Withheld,Per 10CFR2.790 ML20197B0411998-02-27027 February 1998 Insp Rept 70-7002/98-202 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Fire Protection Program Commitments & Safe Plant Operations ML20203F7681998-02-24024 February 1998 Insp Rept 70-7002/97-15 on 971215-980125.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203B7001998-02-17017 February 1998 Insp Rept 70-7002/98-201 on 980105-09.No Violations Noted. Major Areas Inspected:Unannounced Chemical Process Insp of Usec Portsmouth Gaseous Plant at Piketon,Oh.Insp Also Addresses Completion of Compliance Plan Issue 20 ML20202A8271998-02-0606 February 1998 Insp Rept 70-7002/98-02 on 980106-16.Violations Noted.Major Areas Inspected:Maint & Surveillance IP 88025,mgt Organization & Controls IP 88005,operator Training & Retraining IP 88010 & RP IP 83822 ML20202B5511998-02-0101 February 1998 Insp Rept 70-7002/97-13 on 971208-980109.Violations Noted. Major Areas Inspected:Nuclear Criticality Safety Operations & Engineering ML20198R6311998-01-14014 January 1998 Insp Rept 70-7002/97-211 on 971215-19.No Violations Noted. Details Withheld,Per 10CFR2.790 IR 07100103/20120141998-01-0909 January 1998 Insp Rept 70-7002/97-12 on 971103-1214.Violations Noted. Major Areas Inspected:Plant Operations & Engineering ML20202F0281997-12-0505 December 1997 Insp Rept 70-7002/97-11 on 971103-07.Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance & Emergency Preparedness ML20199J5091997-11-24024 November 1997 Insp Rept 70-7002/97-10 on 970922-1102.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20212D0391997-10-29029 October 1997 Partially Withheld Insp Rept 70-7002/97-209 on 970929-1003. Violations Noted.Details Withheld,Per 10CFR2.790 ML20212D8651997-10-28028 October 1997 Insp Rept 70-7002/97-08 on 970811-0921.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20198L2591997-10-20020 October 1997 Insp Rept 70-7002/97-06 on 970902-05.Violations Noted.Major Areas Inspected:Perimeter Security,Storage & Control of Classified Matter,Classification,Communications Security, Computer Security & Physical Security 1999-09-10
[Table view] Category:NRC-GENERATED
MONTHYEARML20217G4831999-10-14014 October 1999 Insp Rept 70-7002/99-207 Containing Proprietary Info on 990920-23.No Violations Noted.Major Areas Inspected: Selective Exams of Core Procedures & Representative Records, Interviews with Personnel & Observations of Activities ML20217F5551999-10-0808 October 1999 Insp Rept 70-7002/99-12 on 990810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20211Q7851999-09-10010 September 1999 Insp Rept 70-7002/99-205 on 990816-20.No Violations Noted. Major Areas inspected:Y2K Readiness Program ML20211H3121999-08-27027 August 1999 Insp Rept 70-7002/99-09 on 990629-0809.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210P7111999-08-10010 August 1999 Insp Rept 70-7002/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Plant Support.Inspector Concluded That Certificatee Was Effectively Implementing Radioactive Matls Transportation Program ML20209F1061999-07-12012 July 1999 Partially Withheld Insp Rept 70-7002/99-204 Conducted on 990614-17.No Violations Noted.Details Withheld,Per 10CFR2.790 ML20209E9011999-07-0909 July 1999 Insp Rept 70-7002/99-08 on 990614-17.Violation Noted.Major Areas Inspected:Security Program,Including Physical Security,Storage and Control of Classified Matter, Classification & Communications & Computer Security ML20209E8781999-07-0909 July 1999 Insp Rept 70-7002/99-07 on 990517-0629.No Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20209B8001999-07-0101 July 1999 Insp Rept 70-7002/99-203 on 990607-11.No Violations Noted. Major Areas Inspected:Hazard Identification & Assessment, Maintenance & Insp,Compliance Plan Issues,Conduct of Operations in X-705 & Audits & Insps ML20207H5111999-06-11011 June 1999 Insp Rept 70-7002/99-05 on 990406-0514.Violations Noted. Major Areas Inspected:Operators Response to Small UF6 Release in Bldg X-330,which Was Effective & Consistent with Guidance Provided in Alarm Response & off-normal Procedures ML20207A0341999-05-21021 May 1999 Insp Rept 70-7002/99-04 on 990222-0312.Violations Noted. Major Areas Inspected:Corrective Action Program & Implementation of Nuclear Criticality Safety Corrective Action Plan ML20206E4371999-04-29029 April 1999 Insp Rept 70-7002/99-03 on 990222-0406.Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20206B5701999-04-22022 April 1999 Insp Rept 70-7002/99-06 on 990322-26.Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support (Emergency Preparedness) ML20196K4091999-03-19019 March 1999 Partially Withheld Insp Rept 70-7002/99-202 on 990222-26.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20204D8611999-03-17017 March 1999 Insp Rept 70-7002/99-01 on 990112-0222.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203G9041999-02-16016 February 1999 Insp Rept 70-7002/98-19 on 981209-990108.No Violations Noted.Major Areas Inspected:Circumstances Surrounding 981209 Fire Involving Side Purge Cascade,Evaluations of Plant Equipment Performance & Plant Personnel Response to Event ML20202D7631999-01-26026 January 1999 Insp Rept 70-7002/98-18 on 981123-990112.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Engineering ML20199J7361999-01-20020 January 1999 Insp Rept 70-7002/99-201 on 990105-07.No Violations Noted. Major Areas inspected:high-risk Chemical Release Release Possibilities That May Occur as Result of Seismic Initiating Event ML20198F2771998-12-18018 December 1998 Insp Rept 70-7002/98-208 on 981130-1204.Violations Noted. Major Areas Inspected:Status & Adequacy of Nuclear Criticality Safety Corrective Action Plan ML20198B5651998-12-14014 December 1998 Insp Rept 70-7002/98-17 on 981013-1123.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support.Weaknesses Identified with Certificatee Dispositioning of Potentially Nonconforming Conditions ML20195H3021998-11-12012 November 1998 Insp Rept 70-7002/98-16 on 981019-23.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20155H9751998-11-0404 November 1998 Insp Rept 70-7002/98-15 on 980831-1013.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20155B6551998-10-27027 October 1998 Partially Withheld Insp Rept 70-7002/98-207 Conducted on 980928-1002.Rept Details Withheld (Ref 10CFR2.790) ML20155B5381998-10-23023 October 1998 Insp Rept 70-7002/98-14 on 980831-0904.Violation Noted. Major Areas Inspected:Implementation of Compliance Plan Issues & Adequacy of Internal Self Assessment of Closure Status of Compliance Plan Issues ML20153G9281998-09-25025 September 1998 Insp Rept 70-7002/98-13 on 980720-0830.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20237B8991998-08-17017 August 1998 Insp Rept 70-7002/98-12 on 980727-31.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Plant Support ML20236V5671998-07-30030 July 1998 Insp Rept 70-7002/98-11 on 980608-0720.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20236L4371998-07-0202 July 1998 Insp Rept 70-7002/98-07 on 980420-0608.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20249B0521998-06-16016 June 1998 Insp Rept 70-7002/98-10 on 980601-05.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance & Plant Support ML20249A5811998-06-15015 June 1998 Insp Rept 70-7002/98-09 on 980608-11.No Violations Noted. Major Areas Inspected:Selected Records,Interviews W/Personnel & Direct Observation of Work Activities in Area of Physical Security ML20248L4371998-06-0505 June 1998 Insp Rept 70-7002/98-204 on 980209-18.Violation Noted.Major Areas Inspected:Adequacy of Licensee Actions to Close NCS- Specific Items in DOE/ORO-2027/R4, Plan for Achieving Compliance W/Nrc Regulations at Portsmouth Gaseous .. ML20248H7381998-06-0202 June 1998 Insp Rept 70-7002/98-206 on 980427-0501.Violations Noted. Major Areas Inspected:Highest Risk Activities in High Enriched U Feed Area,Extended Range Product Area & U Recovery Activities in X-705 Building ML20248F5461998-06-0101 June 1998 Partially Withheld Insp Rept 70-7002/98-205 on 980427-0501 (Ref 10CFR2.790).No Violations Noted ML20248E7841998-05-29029 May 1998 Insp Rept 70-7002/98-08 on 980427-0508.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20247L0751998-05-18018 May 1998 Insp Rept 70-7002/98-05 on 980309-0508.Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20217H0241998-03-27027 March 1998 Insp Rept 70-7002/98-03 on 980126-0308.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance & Engineering ML20217G6721998-03-27027 March 1998 Insp Rept 70-7002/98-04 on 980302-06.Violations Noted. Major Areas Inspected:Maintenance & Surveillance,Plant Support,Training Program,Transportation Program & self-assessment Program ML20248K6021998-03-12012 March 1998 Partially Withheld Insp Rept 70-7002/98-203 on 980209-13.No Violations Noted.Details Withheld,Per 10CFR2.790 ML20197B0411998-02-27027 February 1998 Insp Rept 70-7002/98-202 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Fire Protection Program Commitments & Safe Plant Operations ML20203F7681998-02-24024 February 1998 Insp Rept 70-7002/97-15 on 971215-980125.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203B7001998-02-17017 February 1998 Insp Rept 70-7002/98-201 on 980105-09.No Violations Noted. Major Areas Inspected:Unannounced Chemical Process Insp of Usec Portsmouth Gaseous Plant at Piketon,Oh.Insp Also Addresses Completion of Compliance Plan Issue 20 ML20202A8271998-02-0606 February 1998 Insp Rept 70-7002/98-02 on 980106-16.Violations Noted.Major Areas Inspected:Maint & Surveillance IP 88025,mgt Organization & Controls IP 88005,operator Training & Retraining IP 88010 & RP IP 83822 ML20202B5511998-02-0101 February 1998 Insp Rept 70-7002/97-13 on 971208-980109.Violations Noted. Major Areas Inspected:Nuclear Criticality Safety Operations & Engineering ML20198R6311998-01-14014 January 1998 Insp Rept 70-7002/97-211 on 971215-19.No Violations Noted. Details Withheld,Per 10CFR2.790 IR 07100103/20120141998-01-0909 January 1998 Insp Rept 70-7002/97-12 on 971103-1214.Violations Noted. Major Areas Inspected:Plant Operations & Engineering ML20202F0281997-12-0505 December 1997 Insp Rept 70-7002/97-11 on 971103-07.Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance & Emergency Preparedness ML20199J5091997-11-24024 November 1997 Insp Rept 70-7002/97-10 on 970922-1102.Violations Noted. Major Areas Inspected:Plant Operations,Maint & Engineering ML20212D0391997-10-29029 October 1997 Partially Withheld Insp Rept 70-7002/97-209 on 970929-1003. Violations Noted.Details Withheld,Per 10CFR2.790 ML20212D8651997-10-28028 October 1997 Insp Rept 70-7002/97-08 on 970811-0921.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20198L2591997-10-20020 October 1997 Insp Rept 70-7002/97-06 on 970902-05.Violations Noted.Major Areas Inspected:Perimeter Security,Storage & Control of Classified Matter,Classification,Communications Security, Computer Security & Physical Security 1999-09-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20217G4831999-10-14014 October 1999 Insp Rept 70-7002/99-207 Containing Proprietary Info on 990920-23.No Violations Noted.Major Areas Inspected: Selective Exams of Core Procedures & Representative Records, Interviews with Personnel & Observations of Activities ML20217F5551999-10-0808 October 1999 Insp Rept 70-7002/99-12 on 990810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-III-99-042, on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted1999-09-21021 September 1999 PNO-III-99-042:on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted ML20211Q7851999-09-10010 September 1999 Insp Rept 70-7002/99-205 on 990816-20.No Violations Noted. Major Areas inspected:Y2K Readiness Program ML20211H2841999-08-27027 August 1999 Notice of Violations from Insp on 990629-0809.Violations Noted:Plant Mgt Did Not Correct Condition Adverse to Quality as Soon as Practical ML20211H3121999-08-27027 August 1999 Insp Rept 70-7002/99-09 on 990629-0809.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210P7111999-08-10010 August 1999 Insp Rept 70-7002/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Plant Support.Inspector Concluded That Certificatee Was Effectively Implementing Radioactive Matls Transportation Program ML20209F1061999-07-12012 July 1999 Partially Withheld Insp Rept 70-7002/99-204 Conducted on 990614-17.No Violations Noted.Details Withheld,Per 10CFR2.790 ML20209E9011999-07-0909 July 1999 Insp Rept 70-7002/99-08 on 990614-17.Violation Noted.Major Areas Inspected:Security Program,Including Physical Security,Storage and Control of Classified Matter, Classification & Communications & Computer Security ML20209E8851999-07-0909 July 1999 Notice of Violation from Insp on 990614-17.Violation Noted: Plant Employee Used Memory Typewriter Approved for Classified Use,With Removable Ribbon That Was Not Marked to Reflect Highest Clasification Level ML20209E8781999-07-0909 July 1999 Insp Rept 70-7002/99-07 on 990517-0629.No Violations Noted. Major Areas Inspected:Operations,Maint & Surveillance, Engineering & Plant Support ML20209E8671999-07-0909 July 1999 Notice of Violation from Insp on 990517-0629.Violation Noted:Between 990609 & 22,certificate Batched G-17 Valves with Hidden Vols Greater than 1 Gallon in Staging Outside Bldg X-744H Was Obtained PNO-III-99-034A, on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations1999-07-0606 July 1999 PNO-III-99-034A:on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations PNO-III-99-034, on 990702,all Criticality Accident Alarms Adminstratively Declared Inoperable.Certficatee Issued Press Release.Certificatee Remains in Alert Pending Resolution of Operability Issue.Senior Inspector Responded to Site1999-07-0202 July 1999 PNO-III-99-034:on 990702,all Criticality Accident Alarms Adminstratively Declared Inoperable.Certficatee Issued Press Release.Certificatee Remains in Alert Pending Resolution of Operability Issue.Senior Inspector Responded to Site ML20209B8001999-07-0101 July 1999 Insp Rept 70-7002/99-203 on 990607-11.No Violations Noted. Major Areas Inspected:Hazard Identification & Assessment, Maintenance & Insp,Compliance Plan Issues,Conduct of Operations in X-705 & Audits & Insps ML20196H8551999-06-29029 June 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Corp Failed to Classify as Alert,Emergency Situation Which Could Have Led to Release of Radioactive Matl or Have Direct Effect on Personnel ML20211C4271999-06-24024 June 1999 EN-99-025:on 990629,NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity III Violation Involving Failure to Classify,As Alert,Emergency Situation at Usec Portsmouth Plant ML20207H5051999-06-11011 June 1999 Notice of Violation from Insp on 990406-0514.Violation Noted:Chemical Safety,Operations,Radiation Protection & Equipment Control Activities Were Not Performed IAW Procedures ML20207H5111999-06-11011 June 1999 Insp Rept 70-7002/99-05 on 990406-0514.Violations Noted. Major Areas Inspected:Operators Response to Small UF6 Release in Bldg X-330,which Was Effective & Consistent with Guidance Provided in Alarm Response & off-normal Procedures ML20207A0341999-05-21021 May 1999 Insp Rept 70-7002/99-04 on 990222-0312.Violations Noted. Major Areas Inspected:Corrective Action Program & Implementation of Nuclear Criticality Safety Corrective Action Plan ML20207A0271999-05-21021 May 1999 Notice of Violations from Insp on 990222-0312.Violations Noted:Certificatee Failed to Determine All Credible Process Upsets,Develop Controls Necessary to Meet Double Contingency Principle & Identify All Assumptions & Equipment Needed ML20206E4371999-04-29029 April 1999 Insp Rept 70-7002/99-03 on 990222-0406.Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20206E4321999-04-29029 April 1999 Notice of Violation from Insp on 990222-0406.Violation Noted:On 990325,attendee Failed to Implement Requirements of Confined Space Entry,Permit Number 99-330-04,which Was Required by Procedure XP2-Sh-1H1032 ML20206B5701999-04-22022 April 1999 Insp Rept 70-7002/99-06 on 990322-26.Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering & Plant Support (Emergency Preparedness) ML20206B5651999-04-22022 April 1999 Notice of Violation from Insp on 990322-26.Violation Noted: on 981209,Building X-326 Operator Did Not Stop Cell Motors from Fastest Location Upon Unexplained Rises in Motor Amp Load Which Lead to Excessive Overload in Stage 2 PNO-III-99-018, on 990408,failure of Transfer at Portsmouth Gaseous Diffusion Plant Caused 9,500 Gallons of Oil to Leak Into Onsite Drainage Pond.Pond Is Designed to Prevent Matl from Entering Offsite Waterways.Nrc Notified of Event1999-04-0808 April 1999 PNO-III-99-018:on 990408,failure of Transfer at Portsmouth Gaseous Diffusion Plant Caused 9,500 Gallons of Oil to Leak Into Onsite Drainage Pond.Pond Is Designed to Prevent Matl from Entering Offsite Waterways.Nrc Notified of Event ML20196K4051999-03-19019 March 1999 Notice of Violation from Insp on 990222-26.Violation Noted: Certificate Holder Failed to Establish Document & Maintain Program That Investigates shipper-receiver 235 U Differences on Total Shipment Basis ML20196K4091999-03-19019 March 1999 Partially Withheld Insp Rept 70-7002/99-202 on 990222-26.No Violations Noted.Details Withheld,Per 10CFR2.790(d) ML20204D8451999-03-17017 March 1999 Notice of Violation from Insp on 990112-0222.Violation Noted:On 990112,certificatee Returned Autoclave 1 to Svc Following Steam Shutdown,Due to False Sys Actuation of Safety Sys Component,Without Initiating Problem Rept ML20204D8611999-03-17017 March 1999 Insp Rept 70-7002/99-01 on 990112-0222.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203G9041999-02-16016 February 1999 Insp Rept 70-7002/98-19 on 981209-990108.No Violations Noted.Major Areas Inspected:Circumstances Surrounding 981209 Fire Involving Side Purge Cascade,Evaluations of Plant Equipment Performance & Plant Personnel Response to Event ML20202D7571999-01-26026 January 1999 Notice of Violation from Insp on 981123-990112.Violation Noted:On 981213,motor Load Monitor Setpoints for Stages of Cell 31-5-7 & Adjacent Cell Stages in Area Control Room 2 Not Adjusted to 10% Above & Below Nominal Motor Load ML20202D7631999-01-26026 January 1999 Insp Rept 70-7002/98-18 on 981123-990112.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Engineering ML20199J7361999-01-20020 January 1999 Insp Rept 70-7002/99-201 on 990105-07.No Violations Noted. Major Areas inspected:high-risk Chemical Release Release Possibilities That May Occur as Result of Seismic Initiating Event PNO-III-99-058B, second Update on 981209 Fire in Process Bldg.Exit Meeting on 990205 Rescheduled from 990108 Due to Severe Weather.Cause of Fire Still Being Investigated by Usec.Some Release of Hex in Process Bldg Occurred1999-01-13013 January 1999 PNO-III-99-058B:second Update on 981209 Fire in Process Bldg.Exit Meeting on 990205 Rescheduled from 990108 Due to Severe Weather.Cause of Fire Still Being Investigated by Usec.Some Release of Hex in Process Bldg Occurred ML20198F2771998-12-18018 December 1998 Insp Rept 70-7002/98-208 on 981130-1204.Violations Noted. Major Areas Inspected:Status & Adequacy of Nuclear Criticality Safety Corrective Action Plan PNO-III-98-058A, on 981214,update of Fire in Process Made. Insp Exit Meeting,Open to Public,Will Be Scheduled in Early Jan.Certificate Holder,Us Enrichment Corp,Continuing Its Investigation of Fire,Including Determination of Causes1998-12-15015 December 1998 PNO-III-98-058A:on 981214,update of Fire in Process Made. Insp Exit Meeting,Open to Public,Will Be Scheduled in Early Jan.Certificate Holder,Us Enrichment Corp,Continuing Its Investigation of Fire,Including Determination of Causes ML20198B5651998-12-14014 December 1998 Insp Rept 70-7002/98-17 on 981013-1123.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support.Weaknesses Identified with Certificatee Dispositioning of Potentially Nonconforming Conditions PNO-III-98-058, on 981209,fire Started in Process Bldg 326. Plant Onsite Fire Brigade Responded & Extinguished Fire About 2 H Later.Certificatee Does Not Know Cause of Fire at Present Time.Treated Four Plant Workers for Minor Injuries1998-12-0909 December 1998 PNO-III-98-058:on 981209,fire Started in Process Bldg 326. Plant Onsite Fire Brigade Responded & Extinguished Fire About 2 H Later.Certificatee Does Not Know Cause of Fire at Present Time.Treated Four Plant Workers for Minor Injuries ML20195H2901998-11-12012 November 1998 Notice of Violation from Insp on 981019-23.Violation Noted: from 970303 Through 981021,Corporation Did Not Establish Measures to Ensure That Instruments & Other Measuring Testing Devices Were of Proper Type,Range & Accuracy ML20195H3021998-11-12012 November 1998 Insp Rept 70-7002/98-16 on 981019-23.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20155H9751998-11-0404 November 1998 Insp Rept 70-7002/98-15 on 980831-1013.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations,Maint, Engineering & Plant Support ML20155B6551998-10-27027 October 1998 Partially Withheld Insp Rept 70-7002/98-207 Conducted on 980928-1002.Rept Details Withheld (Ref 10CFR2.790) ML20155B5381998-10-23023 October 1998 Insp Rept 70-7002/98-14 on 980831-0904.Violation Noted. Major Areas Inspected:Implementation of Compliance Plan Issues & Adequacy of Internal Self Assessment of Closure Status of Compliance Plan Issues ML20155B5291998-10-23023 October 1998 Notice of Violation from Insp on 980831-0904.Violation Noted:Certificatee Failed to Conduct Operations in Accordance with Statements & Representations Contained in Compliance Plan as Listed ML20153G9281998-09-25025 September 1998 Insp Rept 70-7002/98-13 on 980720-0830.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20153G9191998-09-25025 September 1998 Notice of Violation from Insp on 980720-0830.Violation Noted:On 980825,certificatee Did Not Take Prompt Action to Correct Significant CAQ ML20237B8991998-08-17017 August 1998 Insp Rept 70-7002/98-12 on 980727-31.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Plant Support ML20236V5641998-07-30030 July 1998 Notice of Violations from Insp on 980608-0720.Violations Noted:Action Not Taken to Prevent Spurious Containment Isolation of Autoclave 3 in X-344 Bldg on 980630 ML20236V5671998-07-30030 July 1998 Insp Rept 70-7002/98-11 on 980608-0720.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support 1999-09-21
[Table view] |
Text
l .
l'.* .
U.S. NUCLEAR REGULATORY COMMISSION l REGIONlli AND THE DIVISION OF FACILITIES AND SECURITY
, 1 l
i
- Docket No
- 70-7002 ,
Certificate No: GDP-2
! Report No: 70-7002/99008(DNMS)
Facility Operator: United States Enrichment Corporation i Facility Name: Portsmouth Gaseous Diffusion Plant ;
1 l
Location: 3939 U.S. Rt. 23 Piketon, OH 45661 1
l Date: June 14-17,1999 i
l Inspectors: J. R. Kniceley, Physical Security inspector J. K. Everly, Senior Facilities Security Specialist L. M. Numkin, Senior Computer Security Specialist l
Approved By: Patrick L. Hiland, Chief Fuel Cycle Branch l Division of Nuclear Materials Safety l
A. Lynn Silvious, Chief Information Security Branch l
Division of Facilities and Security
- Office of Administration l
l 9907150175 990709 PDR ADOCK 07007002 C PDR u
EXECUTIVE
SUMMARY
United States Enrichment Corporation Portsmouth Gaseous Diffusion Plant NRC Inspection Report 70-7002/99008(DNMS)
- NRC performed a security inspection of the Portsmouth Gaseous Diffusion Plant located in Piketon, Ohio, on June 14-17,1999. The main objective of this inspection was to ensure compliance with the certificate holder's Protection of Classified Matter Plan and Physical >
Security P'an. The inspection team, with the assistance of the NRC Resident inspector, reviewed five core areas of the Portsmouth security program. Those areas were physical 3 security, storage and control of classified matter, classification, communications security, and computer security.
One violation involving a classified electronic typewriter was identified. The violation was
- corrected during the course of the inspection and appropriate corrective actions were i implemented.
This inspection was conducted through a review of selected records, interviews v.ith personnel, and direct observation of work activities.
Except for the protection of one classified typewriter ribbon, implementation of the Classified Matter Plan and the Physical Security Plan, and associated implementing procedures was in compliance with NRC criteria. l Security event reports were adequately reviewed and reported to the NRC. 1 Security plan revisions, which did not decrease the effectiveness of the security plan, were adequately implemented and submitted to the NRC.
Security personnel were knowledgeable of their duties and responsibilities.
2
Report Details 3
- 01. Inspection j Areas examined during the security inspection covered the commitments contained in the Protection of Classified Matter Plan (CMP) and the Physical Security Plan. The inspection centered on detailed reviews of five core areas of the security plans:
Physical Security (e.g., protective personnel, physical barriers, site security procedures, and personnelidentification and control); Classification (e.g., proper marking of and accounting for classified material); Telecommunications of Classified Information (e.g.,
accounting for Secure Telephone Units (STU-liis) and other equipment used to facilitate secure communications of classified information); and Computer Security.
- 02. Physical Security
- a. Inspection Scope The inspectors examined Portsmouth's physical security and access control practices to .
ensure compliance with the requirements of the Portsmouth Physical Security P!an and I Protection of CMP. The inspection included a review of the physical barriers, alarms, locks and keys, and personnel access controls and badges.
The inspectors also reviewed Portsmouth's Badge issuing Procec'ure XP4-SS-SE1060.
- b. Observations and Findinas A review of the site physical security posture consisted of interviews with plant personnel and individual guards, observations of activities, tests, and reviews of procedures.
Gates, vehicle barriers, and guard portals were observed to be intact and adequately manned. Plant personnel and visitors were properly identified, registered, badged, and escorted as required. Personnel security clearances and the need for access to the Controlled Access Area (CAA) of the plant were t;eing verified and packages / briefcases were visually inspected by security officers at the entrance to the CAA as required by the Physical Security Plan and the CMP.
The inspectors observed two alarm tests performed by the plant Protective Force Security Manager. The first alarm tested was the Central Files Vault in the X-100 Building. The other alarm was located at the X-100 Building emergency exit gate. I Both alarms tested positive according to the plant's Central Alarm Station operator and were verified by the inspectors through the use of the Protective Force Security Manager's hand held radio.
l The types, design, fabrication, and destruction of security identification badges were found to be consistent with the approved secunty plan commitments. Procedures for lost badges were reviewed and found accurate. Use of proper forms, retention periods for records and inventory of badging materials were also confirmed. The badge computer database was reviewed and found to be consistent with Procedure XP4-SS-SE1060, " Security Badging . Requirements."
f To determine if adequate protection was being afforded to the low enriched uranium (LEU) onsite, the inspectors toured the CAA and observed the Integrity of the fence, 3
gates, and vehicle barriers. The fences, gates, and vehicle barriers were intact and adequately maintained.
i All officers were armed with a handgun and equipped with a radio. The inspectors witnessed radio tests and concluded that there was appropriate communication capability within the CAA.
The inspectors also interviewed officers posted and on patrol, and found them to be knowledgeable of their duties and responsibilities. Security procedures were reviewed 1 ar:d updated as required, located in the appropriate locations, and determined to provide l adequate guidance for security officer duties.
As a result of the tour of the CAA, the inspectors determined that all LEU was either stored or used within the CAA.
While reviewing the CAA fence line, the inspectors noticed that the vegetation around the fence was extremely high (approximately 2-3 feet). Patrolling security officers must be able to observe and assess the entire fence to det 9rmine if anyone is hiding or has breached the fence by tunneling under or cutting through it. The tall grass and weeds can make assessments difficult for officers and could potentially conceal small animals that could cause harm to officers physically checking the fence. The certificate holder began mowing the vegetation during the inspection, agreed with the inspectors assessment, and agreed to keep the vegetation at an appropriate level.
- c. Conclusions The inspectors verified that no violations or deviations of commitments existed with respect to the Portsmouth CMP and the physical security plan in the area of physical security.
Through observations, interviews, independerit verification and records review, the inspectors verified that the protection being afforded the LEU at Portsmouth was in compliance with physical security plan commitments.
- 03. Storaae and Control of Classified Matter
- a. Insoection Scooe (81820)
The inspectors examined Portsmouth's storage and control of classified matter practices to ensure adequate protection for classified matter being used, processed, stored, reproduced, transmitted, or handled in connection with the gaseous diffusion process.
The inspection included a review of the Portsmouth Security Education Program; the Foreign Ownership, Control or influence Program (FOCl); physical checks of classified containers / vaults / cages; classified lock combinations; and reports to the NRC (i.e.,
30-day logable security event notifications).
The inspectors also reviewed Procedures XP2-SS-SS1039, " Handling and Control of Classifieki Documents," and XP2-SS-SS1036, " Security / Classification Orientation and Education." ~
l I
4
- b. Observations and Findinas A review of the process by which classified material was used, processed, stored, reproduced, transmitted, and handled consisted of interviews with plant staff, observations of activities, and reviews of procedures. While review %g various classified security containers / vaults / cages in Buildings X-300, X-333, X-705, and X-1020, the inspectors were able to confirm that Standard Form 702's, " Security Container Check Sheets," were being utilized in accordance with the commitments contained in the approved CMP. The inspectors also noted that all Standard Form 700's, " Security l Container Information," reviewed indicated that the combinations to these classified i storage facilities were in compliance with the CMP commitments in that no combinations were overdue to be changed.
The inspectors reviewed the Portsmouth Security Education Program, to include plant Procedure XP2-SS-SS1036, " Security / Classification Orientation and Education," and found that the plant was in compliance with the commitments contained in the CMP.
However, there was one finding during the course of the inspection where it appears a plant employee was not provided a " site specific" security briefing which led to a violation of plant Procedure XP2-SS-SS1039, " Handling and Control of Classified Documents." Details of this incident are noted in the " Computer Section" of this report.
The FOCl program was also reviewed and found to adequately meet the commitments contained in the CMP. The inspectors also noted that the plant has adequately conformed to the NRC assuming from Department of Energy the cognizant security authority for all FOCl actions associated with the Portsmouth and Paducah Gaseous Diffusion Plants.
Security Event Reports The certificate holder provided the following security-related logable events for the period May 1-31,1999. The inspectors reviewed any immediate security concems at the time of the initial receipt of the events. There were no significant issues or compromises of classified information identified from these reviews. The root cause for these events was determined to be personnel error and appropriate corrective actions have been taken or were in the process of being taken.
Number Qata Ii1[g
- 99-02758 05/18/99 Classified print cabinet left unattended when moved to X-1020.
99-02761 05/18/99 Computer diskette contained unclassified files that if merged could have classified information.
99-02826 05/19/99 X-300 Cascade Controller Qualification Standard discovered to contain classified information.
- 99-03011 05/27/99 Classified information on database and engineering drawing.
- Denotes events that are considered closed.
5
.F l
- c. Conclusions The inspectors verified that no violationc or deviations of commitments existed with respect to the Portsmouth CMP in the area of storage and control of classified matter, except as ncted in the Computer Security section of this report.
- 05. Classification
- a. Insoection Scope l
l The inspectors examined Portsmouth's policies and procedures for the classification of information to ensure compliance with the commitments in the approved CMP and appropriate Executive Order (E.O.). The inspectors reviewed the procedures for classifying information, classification guidance, and classification marking. In addition, the inspectors reviewed Portsmouth's Authorized Derivative Classifiers (ADCs) Training Program and the procedures conceming E.O.12958, " Classified National Security Information."
- b. Observations and Findinas A review of the Portsmouth classification program consisted of an interview with the Site Classificaton Officer, reviews of procedures, and reviews of classified documents. The inspectors were abic to confirm thet the Site Classification Officer was knowledgeable of the requirements of E.O.12958, the new marking requirements of 10 CFR Part 95.37, and appropriate classification guidance. it was also verified that the Portsmouth plant was equipped with the proper stamps for marking classified documents in accoruance with E.O.12958. A review of the Portsmouth ADC Training Program showed that the program adequately covered the requirements of E.O.12958, appropriate classification guidance, and the commitments contained in the Portsmouth CMP.
- c. Conclusions The inspectors verified that no violations or deviations of commitments existed with respect to the Portsmouth CMP in the area of classification.
- 06. Telecommunications of Classified Information
- a. Inspection Scooe
)
The inspectors examined Portsmouth's telecommunications requirements and equipment to ensure classified matter was adequately protected while t:eng telecommunicated. The inspectors reviewed Portsmouth's Communication Security (COMSEC) Program including sighting of COMSEC equipment and physical security controls.
- b. Observations and Findinas .
A review of Portsmouth's Telecommunication of Classified Information Program consisted of an interview with the Portsmouth COMSEC Custodian, reviews of procedures, and observations of COMSEC holdings. The inspectors examined a random number of STU-ills and confirmed that the units were handled and operated in 6
accordance with the commitments contained in the approved CMP. It was also ,
confirmed that the encrypted keys used in connection with the STU-llis were being secured in classified storage containers when not in use, as required. In addition, the inspectors informed the Portsmouth COMSEC Custodian that all STU-ills were scheduled to be phased out in the near future and replaced with the new " Secure Terminal Equipment (STE)." The inspectors noted that if the Portsmouth plant plans to continue telecommunicating classified information, all plant STU-ills will eventually have to be replaced with the STE.
- c. Conclusions The inspectors verified that no violations or deviations of commitments existed with respect to the Portsmouth CMP in the area of telecommunication of classified information.
- 07. Computer Security
- a. Inspection Scope The inspectors reviewed Portsmouth's methods for processing classified data on mainframe computer systems, local area networks, and designated stand-alone personal computers to ensure that classified data being processed was adequately protected.
- b. Observations and Findinas The inspectors reviewed Portsmouth's Computing and Telecommunication Security Program to ensure that there were measures in place to control access and protect the classified systems in operation at the Portsmouth Gaseous Diffusion Plant. At the time of the inspection Portsmouth had five classified mainframe computer systems, one classified local area network, ten classified stand-alone microcomputer systems, and one mag-card typewriter in operation. Each system was operating under an approved computer security plan which formally documented the measures used to control access and protect the classified systems and the information. These plans were accredited at 3-year intervals to ensure that the systems continue to be in compliance with the requirements contained in the " Master Security Plan for Classified Microcomputer Systems Portsmouth Gaseous Diffusion Plant" and that the protectivo features and assurances continued to be effective. All systems' plans reviewed were found to be !
current.
While reviewing classified storage containers that house removable hard drives, the inspectors noted several Standard Form 702's (forms that accompany classified containers) were missing the " Month /Yeer" in the "FROM" column which is required in plant Procedure XP2-SS-SS1039, " Handling and Control of Classified Documents." The inspectors reviewed the subject procedure and met with Portsmouth security staff who were able to demonstrate that corrective actions were being taken (e.g., a laminated neon red card was attached to a security cantainer by plant security staff whenever a classified container was found to not be in compliance with plant procedures.) The card requires the custodian of the container to report to the Portsmouth Security Office for a security refresher briefing. Also, in each instance where the inspectors found an I
t.
7 i
I
.~
incomplete Form 702, immediate action was taken by the Portsmouth staff to correct the form.
Throughout the inspection, the inspectors noted instances in mainframe, personal computer, and terminal use areas where equipment employed for classified processing was potentially too close to unclassified telecommunication lines / jacks / instruments. The Master ADP Security Plan requires that telephone wires, unclassified data communication lines, or unclassified transmission lines of any type are not to be placed within 1 foot of a classified microcomputer system. In each instance where the inspectors noted a possible abridgement, immediate actions were taken by plant staff to correct item.
While reviewing classified systems in the Nuclear Materials Accounting Section, the inspectors noted an electronic typewriter which was labeled CONFIDENTIAL-Restricted Data (CRD). It was identified that the employee responsible for the typewriter had not ,
been properly briefed by the section supervisor regarding the distinction and care of the I classified typewriter. Plant Procedure XP2-SS-SS1036 required that each employee assigned to an organization receive a job specific security / classification briefing within ;
2 weeks of change in assignment by organization /esction management. Also, the l Inspector identified that a typewriter ribbon cartridge was not properly labeled CRD as j required by the Master ADP Security Plan and was not being properly stored in a classified security container, Plant Procedure XP2-55-551039 required that ribbons used in classified typewriters be placed in classified storage when unattended. Failure to properly mark and store the typewriter ribbon, and the failure to properly brief an employee on job specific security requirements are considered a violation of plant procedures and the Portsmouth CMP. (VIO 070-7002/99008-01)
Following the inspector's identification of the above violation, the Portsmouth Security Group performed an in-depth review of the incident and determined that there was no classified information contained on the typewriter ribbon; however, they did confirm that the ribbon was not properly marked CRD and was not being stored in a classified repository as required by Procedure XP2-SS-SS1039. The group's review also determined that there was no indication of a compromise or potential compromise of classified information. They also found that the plant employee had not received the appropriate security classification / security briefing by section management as required by Procedure XP2-SS-SS1036.
The following corrective actions were taken:
A Fast Track Communication Message was immediately sent to all plant employees through Portsmouth's E-mail system advising of the typewriter incident.
=
A briefing was given conceming typewriters used for generating classified information at the Plant Managers daily moming meeting with Organization Managers. Each Organization Manager was directed to review their operations for typewriters being used for classified purposes.
A classification review was conducted by the Site Classification Officer regarding ,
the information that is presently being prepared on the classified typewriter in question.
l 8
4 , ,
Notices were to be published in the plant's daily publication "Open Line" advising l l
that typewriter ribbons utilized for typing classified information must be protected at the same classification level as a paper document.
The use of typewriters for preparing classified documents will be part of the annual security refresher training.
- A security plan for the typewriter was prepared and the typewriter ribbon was labeled CRD.
A problem report was written.
The employees involved were given additional training on the proper handling and control of classified matter.
- c. Conclusions The inspectors concluded that the overall implementation of the computer security program was adequate. When concems were identified, corrective actions were immediately taken. Plant staff were knowledgeable of requirements and procedures, I and generally performed duties well. The corredive actions taken for the identified )
violation appeared adequate and should prevent recurrence. This item will be reviewed I during future inspections.
08 Exit Meeting Summary ;
The inspectors presented the preliminary inspection results to members of the plant's management at the conclusion of the inspection on June 17,1999. Although classified information was reviewed during this inspection, no classified information was removed from the plant site.
l l
9
PARTIAL LIST OF PERSONS CONTACTED T. Bonner, Portsmouth Site Classification Officer, USEC
'J. Brown, Portsmouth General Manager, USEC l
' J. Cox, Manager, Portsmouth Site and Facility Support, USEC A. Grace, Manager, Paducah Security Section, USEC D. Hupp, Manager, Portsmouth Security Department, USEC M. Kelly, Portsmouth Security Section, USEC .
M. Lombard, Nuclear Regulatory Affairs, USEC/HQS i T. Sensue, Portsmouth Nuclear Regulatory Affairs, USEC E. Smith, Manager, Portsmouth Security Section, USEC J. Snodgrass, Manager, Portsmouth Protective Force, USEC D. Stadler, Paducah Nuclear Regulatory Affairs, USEC C. Stollings, Portsmouth Computer Security Section, USEC i
l N
I l
10
..< > l l
j INSPECTION PROCEDURES USED l
IP 81820: Physical Protection Facility Approval and Safeguarding of National Security Information and Restricted Data.
IP 81431: Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance.
IP 81402: Reports of Safeguards Events. '
IP 81401: Plans, Procedures, and Reviews.
ITEMS OPENED, CLOSED AND DISCUSSED ]
Open 7002/99008-01 VIO Failure to mark typewriter ribbon used on classified machine and failure to provide security brief to plant personnel.
Closed None Discussed l None !
LIST OF ACRONYMS USED ADC Authorized Derivative Classifier CAA Controlled Access Area ' ]
CFR Code of Federal Regulations CMP Classified Matter Plan
~CRD Confidential Restricted Data COMSEC Communication Security DNMS Division of Nuclear Materials Safety E.O. Executive Order FOCl. Foreign Ownership, Control or influence LEU- Low Enriched Uranium i NRC Nuclear Regulatory Commission STE Secure Terminal Equipment STU Secure Telephone Units I
11
{