Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209D515 + (ML20209D515)
- 05000336/LER-1987-015, :on 861114,util Informed That GE Model 12 Cfd Relays Installed Above 30-ft Elevation Not Seismically Qualified for Class 1E Svc.Caused by Design Error.Relay Replaced + (ML20209D516)
- ML20209D518 + (ML20209D518)
- ML20209D519 + (ML20209D519)
- ML20209D521 + (ML20209D521)
- ML20209D522 + (ML20209D522)
- 05000354/LER-1986-055, :on 860805,during Cold Shutdown,Channel a Primary Containment Isolation Occurred.Caused by Procedural Deficiency.Instrumentation & Control Procedures Revised to Include Logic Status Verification + (ML20209D523)
- NRC-87-0038, Informs That Util Developed Nuclear Operations Improvement Plan to Effect Improvements in Operations,Engineering,Maint, Security & Regulatory Performance Per 860129 Commitments + (ML20209D526)
- ML20209D527 + (ML20209D527)
- ML20209D530 + (ML20209D530)
- ML20209D531 + (ML20209D531)
- 05000336/LER-1986-009, :on 860929 & 1010,ESF Actuations Resulting in Containment Purge Isolations Occurred.Caused by Personnel Error & Failure of Detector Due to Water Intrusion.Breaker Reset.Detector Repaired & Returned to Svc + (ML20209D532)
- ML20209D534 + (ML20209D534)
- ML20209D535 + (ML20209D535)
- ML20209D536 + (ML20209D536)
- ML20209D537 + (ML20209D537)
- ML20209D539 + (ML20209D539)
- ML20209D541 + (ML20209D541)
- RBG-25799, Responds to NRC Re Deficiency Noted in Insp Rept 50-458/86-35.Corrective Actions:Alternate Method for Making Hotline Notifications Under Investigation + (ML20209D542)
- ML20209D544 + (ML20209D544)
- ML20209D545 + (ML20209D545)
- ML20209D547 + (ML20209D547)
- ST-HL-AE-2104, Forwards Preoperational Radiological Environ Monitoring Rept.W/O Encl + (ML20209D550)
- ML20209D551 + (ML20209D551)
- ML20209D552 + (ML20209D552)
- ML20209D553 + (ML20209D553)
- ML20209D556 + (ML20209D556)
- ML20209D560 + (ML20209D560)
- 05000245/LER-1987-007, :on 870322,reactor Scram & Group I Isolation Occurred.Caused by Operator Error.Operating Procedures Clarified & Operator Training Increased + (ML20209D561)
- ML20209D563 + (ML20209D563)
- ML20209D564 + (ML20209D564)
- ML20209D566 + (ML20209D566)
- ML20209D568 + (ML20209D568)
- ML20209D569 + (ML20209D569)
- PNO-I-87-034, on 870423,plant Shutdown Commenced After Investigation Determined Cause for Failure of Electromatic Relief Valve Acoustic Monitor Was Inside Drywell.Cause Will Be Determined When Drywell Accessible + (ML20209D571)
- ML20209D573 + (ML20209D573)
- IA-84-856, Confirms Agreement,In Response to 841119 Request,To Extend Until 850101 Time Allowed for Requesting Hearing Concerning 841026 Order Modifying Nuclear Pharmacy,Inc Licenses + (ML20209D574)
- ML20209D574 + (ML20209D574)
- ML20209D575 + (ML20209D575)
- ML20209D576 + (ML20209D576)
- ML20209D578 + (ML20209D578)
- ML20209D580 + (ML20209D580)
- IR 05000461/1999012 + (ML20209D581)
- ML20209D586 + (ML20209D586)
- ML20209D587 + (ML20209D587)
- 05000312/LER-1986-015, :on 850921,two Trace Solder Pads Dislodged from Component Side of Printed Circuit Board.Dislodged Solder Pads Caused Nonconforming Rept to Be Written.Guidance Will Be Prepared for Technicians + (ML20209D589)
- ML20209D593 + (ML20209D593)
- ML20209D594 + (ML20209D594)
- ML20209D601 + (ML20209D601)
- AECM-87-0021, Forwards Info Provided to Bank for Electronic Transfer of Supplemental Payment of 10CFR170 Fees for Contractual Costs Re 850812 Application.Payment Made on 870113 in Response to Corrected Invoice F0305 + (ML20209D602)
- ML20209D604 + (ML20209D604)