ML20209D586

From kanterella
Jump to navigation Jump to search
Forwards for Comment & Concurrence,Draft Fes.Responses Requested by 841214.W/o Encl
ML20209D586
Person / Time
Site: Satsop
Issue date: 11/23/1984
From: Novak T
Office of Nuclear Reactor Regulation
To: Johnston W, Muller D, Treby S
Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
References
CON-WNP-1356 NUDOCS 8412050537
Download: ML20209D586 (1)


Text

-

-  ?,

NOV 0 31981 ltEMORANDUM FOR: W. Johnston, Assistant Director for Materials Chemical &

Environmental Technology, DE D. Muller, Assistant Director for Radiation Protection, DSI S. Treby, Deputy Assistant Chief, Hearing Counsel, OELD FROM: T. Novak, Assistant Director for Licensing, DL

SUBJECT:

MANAGEMENT REVIEW 0F THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 3 (WNP-3) FES REVIEW Enclosed for your comment and/or concurrence is a draft of the WNP-3 FES. This document includes the comments received on the Draft Environmental Statement (DES) and the staff's response to these comments.

At the time we were notified of the WNP-3 extended construction delay by the applicant, we had issued the DES for comments. Since the FES is the DES with the comments incorporated, we decided, for the small effort involved, to issue the FES once we had received all comments on the DES.

Your responses are requested by December 14, 1984.

T. Novak, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated DISTRIBUTION N

Concur with attached comments. PRC System LB#3 Reading JLee BKSingh cc: R. Ballard A. Toalston VNerses B. Samworth E. Fields SBlack C. Hickey L. Hulman Attorney, OELD G. LaRoche W. Pasedag F. Miraglia M. Fliegal P. Easley R. Gonzales W. Gammill W. Regan J. Spickler D. Cleary J. Levine M. Kaltman F. Congel L. Soffer J. Nehemias A. Brauner E. Branagan

  • Previous concurre by*, [

DL:LB#3

  • DL:LB#3* D j.343 DL L BKSingh/ch VNerses GWWfighton TNNovak 11/ 9 /84 11/9/84 ll/q /84 11/[j/84 g.12;gggjfdu g 9