Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209B898 + (ML20209B898)
- ML20209B899 + (ML20209B899)
- ML20209B900 + (ML20209B900)
- 05000298/LER-1999-005, :on 990601,condition Prohibited by TSs Was Noted.Caused by Failure to Adequately Perform Logic Sys Functional Testing.Entered TS SR 3.0.3 & Temporarily Revised Affected Surveillance Procedures + (ML20209B902)
- ML20209B903 + (ML20209B903)
- ML20209B904 + (ML20209B904)
- ML20209B906 + (ML20209B906)
- 05000293/LER-1999-004, :on 990529,setpoint of Target Rock Relief Valves Were Found Out of Tolerance During Testing.Caused by Setpoint Drift.Replaced Pilot Assemblies with Certified Spare Pilot Assemblies.With + (ML20209B911)
- ML20209B912 + (ML20209B912)
- ML20209B914 + (ML20209B914)
- ST-HL-AE-2093, Forwards Revised FSAR Section 3.12, Conformance W/Nrc Reg Guides. Section Updated to Reflect Util Position on All Applicable Reg Guides + (ML20209B916)
- ML20209B917 + (ML20209B917)
- ML20209B918 + (ML20209B918)
- ML20209B920 + (ML20209B920)
- ML20209B921 + (ML20209B921)
- ML20209B923 + (ML20209B923)
- ML20209B925 + (ML20209B925)
- ML20209B926 + (ML20209B926)
- ML20209B929 + (ML20209B929)
- ML20209B930 + (ML20209B930)
- LD-99-039, Part 21 Rept Re Defect of ABB 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified + (ML20209B931)
- ML20209B932 + (ML20209B932)
- ML20209B933 + (ML20209B933)
- ML20209B934 + (ML20209B934)
- PNO-I-99-030, on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released + (ML20209B937)
- ML20209B939 + (ML20209B939)
- ML20209B941 + (ML20209B941)
- ML20209B943 + (ML20209B943)
- ML20209B944 + (ML20209B944)
- ML20209B945 + (ML20209B945)
- ML20209B946 + (ML20209B946)
- PNO-III-99-034A, on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations + (ML20209B947)
- PNO-III-86-087, on 860827,plant Shut Down Due to Equipment Problems Resulting in Inoperable HPCI Sys & Train B of Core Spray Sys.Addl Problems Identified During Shutdown.Repairs Underway + (ML20209B948)
- ML20209B949 + (ML20209B949)
- ML20209B952 + (ML20209B952)
- ML20209B953 + (ML20209B953)
- 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys + (ML20209B954)
- ML20209B956 + (ML20209B956)
- ML20209B958 + (ML20209B958)
- ML20209B960 + (ML20209B960)
- ML20209B961 + (ML20209B961)
- ML20209B962 + (ML20209B962)
- ML20209B963 + (ML20209B963)
- ML20209B964 + (ML20209B964)
- ML20209B966 + (ML20209B966)
- ML20209B967 + (ML20209B967)
- ML20209B968 + (ML20209B968)
- ML20209B969 + (ML20209B969)
- ML20209B970 + (ML20209B970)
- ML20209B971 + (ML20209B971)
- 05000352/LER-1999-004-01, :on 990606,ADS Was Inoperable During Planned Maint & Applicable TS Was Not Met.Caused by Inadequate Review Operability Requirements.Clearance Was Removed from Backup ADS Gas Bottles & Sys Was Returned to Service + (ML20209B972)