Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R820 + (ML20206R820)
- ML20206R821 + (ML20206R821)
- JPN-87-021, Forwards Results of Test Data to Support & Clarify Info Previously Submitted Re Qualification of Spds.Data Demonstrates That Requirements of Suppl 1 to NUREG-0737 Satisfied.Info Applies to 1E Electrical Breakers + (ML20206R822)
- ML20206R823 + (ML20206R823)
- ML20206R826 + (ML20206R826)
- PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing + (ML20206R827)
- PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release + (ML20206R830)
- ML20206R832 + (ML20206R832)
- ML20206R833 + (ML20206R833)
- PNO-IV-99-025, on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned + (ML20206R834)
- ML20206R835 + (ML20206R835)
- ML20206R836 + (ML20206R836)
- PNO-I-87-032, on 870415,Unit 1 Shut Down After Licensee Unable to Successfully Perform Local Leak Rate Test on Three Containment Isolation Valves in Drywell Purge Exhaust Line. on 870416,Unit 2 Tripped Due to MSIV Closure + (ML20206R837)
- ML20206R838 + (ML20206R838)
- ML20206R839 + (ML20206R839)
- ML20206R840 + (ML20206R840)
- ML20206R841 + (ML20206R841)
- PNO-III-98-012A, on 980127,small Release of UF6 Occurred When Three Workers Loosened Flange During Maint Work in U Conversion Bldg.Workers Involved Were Wearing Respirators & Protective Clothing But Received Minor Skin Irritations + (ML20206R842)
- ML20206R843 + (ML20206R843)
- ML20206R846 + (ML20206R846)
- PNO-III-98-012, on 980127,three Workers Loosened Flange, Resulting in Small Release of UF6.Workers Were Wearing Respirators & Protective Clothing But Received Minor Skin Irritation + (ML20206R847)
- ML20206R848 + (ML20206R848)
- PNO-III-98-011A, on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld + (ML20206R851)
- ML20206R852 + (ML20206R852)
- ML20206R853 + (ML20206R853)
- ML20206R855 + (ML20206R855)
- ML20206R856 + (ML20206R856)
- 05000395/LER-1987-004, :on 870316,source Range Neutron Flux Channels Identified as Inoperable from 870308-0313.Caused by Discrepancy Between Requirements in FSAR & Tech Specs. GTP-702 & Test Frequency for Procedure Revised + (ML20206R857)
- PNO-III-98-011, on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal + (ML20206R859)
- ML20206R860 + (ML20206R860)
- 05000382/LER-1987-009, :on 870317,discovered That Instrument Used to Determine Containment Internal Pressure Not Sufficiently Accurate.Caused by Design Deficiency.Calculational Methodology Substituted + (ML20206R861)
- ML20206R862 + (ML20206R862)
- ML20206R863 + (ML20206R863)
- ML20206R865 + (ML20206R865)
- PNO-III-98-010, on 980123,Maimi Valley Hosp Received Package Containing 60 Mci Ir-192 in Form of 66 Seeds.Excessive Radiation Level Found on Top of Package.Caused by Shifting from Stored Position + (ML20206R866)
- ML20206R867 + (ML20206R867)
- ML20206R869 + (ML20206R869)
- PNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill + (ML20206R870)
- ML20206R872 + (ML20206R872)
- ML20206R873 + (ML20206R873)
- ML20206R874 + (ML20206R874)
- ML20206R875 + (ML20206R875)
- ML20206R877 + (ML20206R877)
- ML20206R878 + (ML20206R878)
- ML20206R879 + (ML20206R879)
- ML20206R880 + (ML20206R880)
- W3P87-1010, Forwards Response to Violation 8628-01 Noted in Insp Rept 50-382/86-28.Corrective Actions:Procedure ME-7-002 Revised to Require Removal of Any Shorting Blocks That Could Have Been Previously Installed + (ML20206R881)
- ML20206R883 + (ML20206R883)
- ST-HL-AE-2082, Forwards Requested Addl Info & Justification for Proof & Review Tech Spec Sections 3.4.3/3/4 4-9,3.5.1/3/4 5-1 & 3.4.9.2/3/4 4-35 Re Fracture Toughness & Stress Analysis for Pressurizer to Delineate Basis for Accumulator Vol Range + (ML20206R884)
- ML20206R885 + (ML20206R885)
- ML20206R887 + (ML20206R887)