ML20206R840

From kanterella
Jump to navigation Jump to search
Informs That Review of 860502 Revs to Emergency Plan Completed.Revs Do Not Downgrade Plan Effectiveness.Any Changes Must Be Made Per 10CFR50.54 & App E Requirements
ML20206R840
Person / Time
Site: Point Beach  
Issue date: 06/27/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8607070235
Download: ML20206R840 (1)


Text

. _ _ _.

L.

JUN 271986 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company f

ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

We have completed our review of the May 2, 1986 revisions to the Point Beach Nuclear Plant Emergency Plan. Our review indicated that your plan changes do not downgrade the effectiveness of your emergency plan.

Please be reminded that 10 CFR Part 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.

However, if your safety review indicates no decrease in emergency preparedness, then changes can be made without NRC approval.

In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR Part 50.54(q). Also, any changes to the Emergency Plan i

Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).

Should you have any questions regarding this letter, please contact Mr. James Foster of my staff at (312) 790-5655.

Sincerely,

/5/

W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch 1

cc:

J. J. Zach, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson p

Wisconsin Public Service 8607070235 O g g n

Commission PDR ADOCK O U

PDR F

W. Weaver, FEMA, Region V D. Matthews, EPB 0

RIII -

RIII RI rih

/

er/mm 1

J p

g6j l

06/26/86 s

w v