MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] |
Text
\
i Qh 46 gd APR 16 @
MEMORANDUM FOR: Jesse L. Funches, Director, Planning and Program Analysis Staff, NRR FROM: Charles E. Norelius, Director, Division of Reactor Projects, RIII
SUBJECT:
NT0L PLANT LICENSING STATUS - REGION III Enclosed is the updated plant licensing status for Braidwood 1. This information is current as of April 15, 1987. The Commission was briefed by the Staff on April 10, 1987, regarding the Clinton Power Station. At the conclusion of the briefing the Commission voted 5 to 0 to authorize issuance of a full power license. Therefore, updating information on Clinton is not
.being submitted as agreed to in discussion between S. Black of your staff and R. F. Warnick of my staff on April 15, 1987. Should you or your staff have any further questions, please contact R. C. Knop for Clinton and W. S. Little for Braidwood.
ORIGINAL SIGNED BY C. E. NORELIUS Charles E. Norelius, Director Division of Reactor Projects
Enclosure:
Updated Plant Licensing Status cc w/ enclosure:
A. B. Davis, RIII J. A. Hind, RIII C. J. Paperiello, RIII N. J. Chrissotimos, RIII SRI, Clinton i SRI, Braidwood J. Strasma kh P
k h l RIII RI f
RIII M N)
RIII Kn$jp op/ Li tle\ Warnick 'us ,
y&ffy qbG/S7 CC *N
! N
I q
k .
k a LICENSING STATUS OF BRAIDWOOD 1 i-
- A license authorizing fuel loading and precritical testing for Braidwood Unit I was issued on October 17, 1986. Fuel loading began on October 25, 1986, and was completed on November 3, 1986. The FES was issued in June 1984. The SER was issued in November 1983, and SSERs 1 and 2 were issued in September and October, 1986, respectively. The letter from the ACRS supporting issuance of an OL was issued on February 11, 1985. The ASLB hearings cemenced on October 29, 1985, and were completed on November 26, 1986. The hearing record was closed on December 17, 1986. A final ASLB decision is not expected until April 1987.
FSAR Review The application for the Byron and Braidwood Stations was submitted and accepted for review under the Commission's standardization policy statement of March 5, 1973. This application was for two duplicate units at each of two sites; therefore, the staff's review of the duplicate design portions of these four units was conducted simultaneously and documented in the Byron SER. The
- staff's review of.the Braidwood site-specific portion of the Byron /Braidwood FSAR is essentially complete. There are three outstanding and four confirmatory items still under review.
Hearings
. The Braidwood application is contested; the OL evidentiary hearing was i completed on November 26, 1986. The hearing was closed on December 17, 1986.
Initial hearings on the emergency preparedness contention were conducted on 1 October 29, 1985; hearings were completed for this contention on March 12, i
1986. The parties have submitted proposed findings on this contention and the matter is pending before the Licensing Board for its decision. In its June 21, j 1985 Order, the ASLB admitted a complex contention alleging inadequate QA/QC during the construction of Braidwood Station. Directed certification to the Appeal Board of this Order was requested by the applicant and supported by the NRC staff in its July 23, 1985 filing. On September 6, 1985, the Appeal Board denied the grant of directed certification by a 2 to 1 majority. The applicant filed a request to waive the regulations prohibiting an appeal to the Commission of the Appeal Board denial of the grant of directed certification. This request was supported by the staff and opposed by the intervenor. On
, April 23,1986, the Commission dismissed the quality assurance contention. An additional contention was accepted by the ASLB on July 23, 1985 concerning harassment, intimidation, retaliation and other discrimination. The hearing on this contention has been completed and spanned 97 hearing days between May 6, 1986 and November 26, 1986.
1 On August 18, 1986, the applicant filed a request pursuant to 10 CFR 50.57(c) j for authorization of fuel load and precritical testing. The staff submitted a response supporting the request; the intervenors opposed the request. On i September 18, 1986, the ASLB issued an Order granting the applicant's motion.
Construction Appraisal Team (CAT) Inspection A CAT Inspection was conducted by the Office of Inspection and Enforcement during December 10-20, 1984 and January 7-18, 1985. The Inspection Report i
I 1
_ . _ . _ . _ _ _ _ . _ _ . - _ ~ __ _ _ . . _
4 4
o LICENSING STATUS OF BRAIDWOOD (50-456/84-44;50-457/84-40) was issued February 20, 1985. Although construc-tion was generally found to be in accordance with requirements, the team identified a number of hardware deficiencies and program weaknesses as potential enforcement action items. These included vendor tanks and heat exchangers with deficient welds, vendor radiographs not meeting required weld or film quality requirements, failure to identify the required weld sizes for pipe supports and restraints, installation of unqualified switchboard wire and bolts of indeterminate material, failure to identify deficient seismic pipe support and restraint installations, and failure to provide adequate electrical separation criteria in quality control procedures. The potential enforcement actions were issued as violations by the Region in April 1985.
Seven of the nine violations have been closed by the Region.
Independent Design Review (IDR)
On April 24, 1985, the applicant submitted its plans for ensuring that all applicable corrective actions resulting from the Byron 1 IDI and IDR, and the Clinton 1 IDR are incorporated into the Braidwood design. The NRC review of this information has been completed; an NRC inspection was conducted on November 18-22, 1985 to verify the proper implementation of these corrective actions. The inspection report was issued on April 2, 1986. All open items have been closed by the Region.
Region III Inspections 4 There are approximately 24 and 25 matters which require resolution by the applicant prior to initial criticality and 5% power, respectively. These include open items, violations, 10 CFR 50.55(e) reportable deficiencies, LERs, allegations, unresolved items, generic letters, IE Circulars, IE Bulletins, and 10 CFR 21 reports. There are also a number of normal inspection modules that remain to be completed in the following areas (percent completion for each area is included):
Operations QA Program (74%)
Safety Committee Inspection (50%)
Fire Protection (75%)
Radiation Protection (95%)
Radwaste (30%)
SER Review and Followup (75%)
Radiological and Chemical Confirmatory Measurements (90%)
Emergency Preparedness (95%)
Startup Test Procedure Review (50%)
Startup Test Results (0%)
Startup Test Witnessing (0%)
Overall Startup Test Program (80%)
Low Power Test Procedure Review (0%)
Power Ascension Test Procedure Review (0%)
Precritical Data Review (0%)
Initial Criticality Witnessing (0%)
+
- LICENSING STATUS OF BRAIDWOOD Security and Safeguards The licensee has satisfied the minimum requirements of their security plans required for licensing.
Radiation Protection and Radwaste The most recent inspection was conducted October 6-8, 1986. There are presently
, four open items.
Operator Licensing Confirmation that the senior reactor operators have obtained the requisite
-experience on shift is required. The first group of operator examinations was completed in April 1986. Sixteen of seventeen Senior Reactor Operators, and i six of six Reactor Operators passed. The second group of operation examinations l was completed in August 1986. Twelve of seventeen Senior Reactor Operators and seven of eight Reactor Operators passed. The third group of operator examina-tions were conducted during the weeks of November 10 and November 17, 1986.
- Fifteen of seventeen Senior Reactor Operators and six of seven Reactor Operators i
passed.
Allegations There are seven open allegation files which require Region III action.
OI Investigations The Office of Investigations has four (three applicant plus one vendor) open investigation files.
Fire Protection l.
l The NRR Site Audit and the Region III Appendix R Team inspection were conducted
, the week of August 18, 1986, which resulted in several items of concern being i
raised. During subsequent discussions between the licensee and NRR, all NRR ,
concerns were addressed adequately and are planned to be documented in Supplemental Safety Evaluation Report No. 3. Followup of the Region III l concerns was performed by NRC contractors (EG8G) during an onsite inspection conducted February 23-March 6,1987. The majority of Region III concerns i were satisfactorily resolved during this inspection. Closure of the Region
! III concerns are planned to be documented in Inspection Report (456/87007; 457/87006). The remaining open items are scheduled to be followed by regional i
personnel.
Braidwood Construction Assessment Program (BCAP) l For background information on this issue, please refer to the November 15, 1985 l report. The final presentation to the NRC concerning BCAP was conducted on j October 15, 1985; the final BCAP report was issued on November 14, 1985, by i
I
_ - . , . _ _ _ _ _ , _ . _ _ _ _ . - _ , _ - . _._,,,._ _ _ _ _ _ _ _ .- _ --- _ .-,,_- ~ _ ._._- -
n LICENSING STATUS OF BRAIDWOOD 1 Canmonwealth Edison Company for NRC review. The NRC review of the final BCAP report is documented in Inspection Report Nos. 456/86003; 457/86003 dated 2 June 9, 1986. The staff presented testimony regarding its evaluation of BCAP at the November 20, 21, and 26, 1986 hearing sessions.
Emergency Preparedness All onsite and offsite emergency preparedness licensing requirements have been i completed satisfactorily.
By letter dated August 22, 1986, the applicant requested an exemption from the requirement to conduct an emergency preparedness exercise, involving the full scale participation of the State of Illinois and all three counties within the 10-mile EPZ, within one year of exceeding 5% power. The applicant has been informed that the 1987 exercise must also involve participation by the State of Indiana to satisfy the requirements of 10 CFR 50, Appendix E, IV.F.1.
FEMA has determined that the State of Indiana's involvement in the 1985 exercise was minimal, and inadequate to satisfy FEMA's exercise evaluation criteria associated with the aforementioned Appendix E requirement. The State of Indiana
! successfully participated in the March 1987 exercise which satisfies the regula-I tory requirements. The applicant's first exercise was conducted in November 1985, and the last exercise was conducted in mid-March 1987. This exemption request is currently under review.
As part of FEMA's 44 CFR 350 approval process for offsite emergency planning a public meeting has been scheduled for May 20, 1987. The meeting will take
- place in the town of Braidwood. It will be hosted by the State of Illinois, and will include presentations by regional FEMA and NRC representatives on the offsite and licensee emergency preparedness programs for the Braidwood Station, respectively.
1 f
i i
1
_ .. . ~ ___., --- _ -_ ,_ _ _ ._._-_. _ ._.-- _,___
. .?
Plcnt: Unit 1 -
PM: BraidwoodStation}02)
J. A. Stevens (x 27 Technical Specifications:
Proof and Review: Completed Final (Appendix A Version): Completed FSAR SSER Schedule OPEN ISSUES Responsible Org. Category Input Issued Comments
- 1. Control room human factors EICSB 3 Applicant's Summary Report review of the DCRDR dated December 1, 1986, is under review.
- 2. Safety parameter display EICSB Applicant will submit V/V system Report & correct identification of the wide-and narrow-range displays prior to startup fol-lowing the first refueling outage.
- 3. Fire Protection Program PSB 3 Applicant's submittal under review.
- 2
, - Plant: Braidwood Station, Unit 1 PM: J. A. Stevens (x 27702)
- ! Technical Specifications
j Proof and Review: Completed l Final (Appendix A Version): Completed i
FSAR SSER Schedule I Confirmatory Issues Responsible Org. Category Input Issued Comments 1 1. Inservice testing pumps RSB 3 Submittal dated 8/20/86 and valves under review.
4 2. TMI Action Plan Item II.D.1 Applicant's submittal i
under review.
I
- 3. Anticipated transients without ATWS implementation scram (ATWS) design under review.
- 4. Steam generator tube failure Applicant to submit all plant-specific information i at least 6 months prior to the first refueling outage.
i 4
l l
m-_
. 6' Plant: Braidwood Station, Unit 1 PM: J. A. Stevens (x 27702)
Technical Specifications:
Proof and Review: Completed Final (Appendix A Version): Completed FSAR SSER Schedule License Conditions Responsible Org. Category Input Issued Comments
- 1. Inservice inspection program EB 3 Applicant will submit ISI program 12 months prior to 1st refueling outage.
- 2. TMI Item II.F.1: Iodine /Particu- PSB 3 Applicant has installed late Sampling an NRR approved modifi-cation. A review of installation and testing data will be conducted during a future Region III inspection.
- 3. Fire Protection Program PSB 3 Standard L. C.
- 4. Emergency diesel engine auxiliary Applicant will resolve support systems this matter prior to startup following the first refueling outage.