Informs of Intent to Comply W/Section 4.2.4.3 of SER for Facility Re Routine Visual Insp of Representative Fuel by Using GE post-irradiation Surveillance Program
ML20206R846
Person / Time
Site: Limerick Constellation icon.png
Issue date: 09/12/1986
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Bernaro R, Bernero R
Office of Nuclear Reactor Regulation
Shared Package
ML20204G693 List:
References
CON-#486-826 OL, NUDOCS 8609190219
Download: ML20206R846 (3)


Text

.

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 September 12, 1986 u.s. coon v eu c,,"c O o"uc"..".*.S*."a= = a r Docket No. 50-352 Mr. Robert Bernero, Director Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

Limerick Generating Station Unit 1 Fuel Surveillance Program

References:

1)

J. S. Charnley (GE) to C. H. Berlinger (NRC), " Post-Irraidation Fuel Surveillance Program", November 23, 1983.

2)

J.

S. Charnley (GE) to L. S. Rubenstein (NRC), " Fuel Surveillance Program",

February 29, 1984.

3)

J. S. Charnley (GE) to L. S. Rubenstein (NRC), " Additional Details Regarding Fuel Surveillance Program", May 25, 1984.

4)

L. S. Rubenstein (NRC) to R.

L. Gridley (GE), " Acceptance of GE Proposed Fuel Surveillance Program", June 27, 1984.

Dear Mr. Bernero:

Section 4.2.4.3 of the NRC's Safety Evaluation Report (SER) for Limerick Station states that routine visual inspection of representative (usually discharged) fuel will be performed in connection with each refueling outage.

We wish to advise your on our intent to comply with section 4.2.4.3, by using the General Electric (GE) Post-Irradiation Surveillance Program.

As you are aware, GE has accepted responsibility for post-irradiation surveillance of GE designed and manufactured fuel assemblies and has provided the NRC with a full description and evaluation of its surveillance program in References 1, 2 and 3.

The GE program has been found Ao \\

8609190219 860912 I

)

PDR ADOCK 05000352 l

G PDR

Mr. Robert Barnero S2ptembsr 12, 1986 Page 2 acceptable by the NRC as stated in the letter. dated June 27, 1984 from L. S. Rubenstein (NRC) to R. L. Gridley (GE) (reference 4).

Since only fuel designed and' manufactured by GE is used in Limerick Unit 1, it is our intent to participate in the GE Fuel Surveillance Program and,to utilize this program to comply with SER Section 4.2.4.3.

If you have any questions or require further information, please do not hesitate to contact us.

Ver truly.yours, Attachments cc:

T. E. Murley, Administrator, USNRC, Region #1 E. M. Kelly, Senior Resident Site Inspector See Attached Service List I

cc:

Troy B. Conner,.Jr., Esq.

Benjamin H. Vogler, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony

.Ms. Maureen Mulligan Charles W. Elliott, Esq.

Barry M. Hartman, Esq.

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.

David Wersan, Esq.'

Robert J. Sugarman, Esq.

Kathryn S. Lewis, Esq.

Spence W. Perry, Esq.

Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)

E. M.

Kelly Timothy R. S. Campbell July 21, 1986

' -'. ATTACHMENT r~~

~ -

.

==.1

= = < <

. Page 1 of.4 MFN-218-83 JSC-072-83 GENERAL $ ELECTRIC NUCLEAR POWER SYSTEMS DMSION GENERAL ELECTRIC COMPANY e 175 CURTNER AVENUE

  • SAN JOSE, CAUFORNIA 95195 MC 682, (408) 925-3697 November 23, 1983 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 Attention:

C. H. Berlinger, Chief Core Performance Branch Gentlemen:

SUDJECT:

POST-IRRADIATION FUEL SURVEILLANCE PROGRAM i

Reference:

Letter, J. S. Charnley (GE) to F. J. Miraglia (NRC),

" Proposed Revision to GE Licensing Topical Report NEDE-24011-P-A", February 25, 1983 The NRC has recently required that newly licensed plants adopt a post-irradiation fuel surveillance program that consists essentially of routine visual inspection of discharged fuel at each refueling outage.

The purpose of this letter is to propose the use of the fuel surveillance program described in the attachment, in place of the program required by i

the NRC at newly licensed plants.

General Electric believes that its l

program meets the intent of Section II, Part D, of Standard Review Plan (SRP) 4.2 (NUREG-0800), regarding fuel surveillance.

Because of the number of plants coming on-line in the near future that will be affected by this issue, GE requests that the NRC expedite consideration of this matter.

General Electric Fuel Performance Verification Program The General Electric fuel performance verification program is described in the proprietary attachment to this letter.

The attachment is considered proprietary because it contains information which GE customarily maintains l,

in confidence and, withholds from public disclosure.

This information has r

been handled and classified as proprietary as indicated in the affidavit l

- provided in the reference letter.

We hereby request that this information i

be withheld from public disclosure in accordance with the provisions of 10CFR2.790.

y l

l.

. - - ~ - - --- - ---- - - - - - - - - - - - - -

~'~~~~~~~

" ATT.^~CIDIENT 1^"

"~

~

~

Pege 2 of 4 USNRC Page 2 GE Program and SRP 4.2 Regarding post-irradiation fuel surveillance, SRP 4.2 states that a program "should.be described for each plant to detect anomalias or confirm expected fuel performance...For a fuel design like that in other operating plants, a minimum acceptable program should include a qualita-tive visual examination of some discharged fuel assemblies from each refueling."

GE defines expected fuel performance as "the fuel will not fail".

Failure criteria used in the design process contain conservatisms that adequately bound conditions that may e~.ist at any plant, and provide margin to actual fuel failure limits.

Additionally, operating limits are established such that sufficient margins are maintained to the design limits during normal operation and transients (in accident analyses, all fuel is conservatively assumed to fail).

Erpected fuel performance as defined above is confirmed on a generic basis for ~a fuel design through the inspection of LTA's, and on a plant-specific basis through offgas surveillance.

The LTA program detects anomalies that may arise, with the added advantage of accomplishing this prior to the time that the anomaly might appear in production fuel.

As

.11scussed earlier, a visual examination of some of the discharged fuel from two early applications of a new fuel design will also be performed, in order to confirm the expected performance of that fuel design.

Discussion of GE Program GE believes that the program it proposes meets or exceeds the intent of SRP 4.2 and is also more cost effective.

The numerous benefits of the GE program are presented below.

Inspection of LTA's of new designs provides timely, detailed, and useful information that can be fed back into fuel design, analysis, and manufacture.

LTA's of new designs are usually placed in operation at least a year before in-reactor introduction of production fuel.

Prior to irradiation, these LTA's may undergo detailed visual, nondestructive, and dimensional characterization.

Key measurements may be taken of specific bundle features and additional detailed examinations may be performed on specific fuel rods.

Interim examinations may be performed at the end of each operating cycle.

Upon discharge, a final inspection is performed on the previously characterized fuel rods and final measurements may be taken of key bundle features.

As required, more extensive evaluations may be performed, including destructive testing.

This detailed surveillance of LTA's for new designs provides:

(1) early identification of potential fuel performance concerns; (2) continuour knowledge of overall fuel a

ATTACHMENT 1

Page'3 of 4 T

GENER AL $, ELECTRIC USNRC Page 3 performance; and (3) systematic ecquisition of detailed behavioral data allowing a comparison of predicted versus observed performance character-l 1stics, thus providing feedback into the design process from fuel operated in a commercial reactor.

As discussed previously, the detection of fuel failures results in an investigation into the cause, and corrective actions where appropriate.

A general visual inspection of the exterior surfaces of a statistically significant number of fuel bundles (24 total - twelve at each of two plants) to confirm the absence of any anomalous behavior at end-of-life discharge for a new fuel design represents ample additional confirmation of the design.

Because fewer bundles are examined in greater depth (LTAs) than in the program required by the NRC of newly licensed plants, and because the visual inspections are limited to 24 bundles at end-of-life for a new design rather than at the end of every cycle in perpetuity, the GE program leads to a significant reduction in the total costs to utilities, while simultaneously providing more valuable data.

If a utility were to contract for the type of visual examination the NRC is proposing the cost to the utility would be on the order of $60,000 per reload (as'suming 12 bundles are inspected at each ou'tage), in addition to personnel and i

dechanneling costs.

If the utility were to perform the visual inspection i

itself, the cost in terms of tra.ining personnel, procuring proper equipment, performing the inspection, and expcsing workers to radiation, would also be substantial.

The proposed GE program will allow the NRC to maximize the utilization of

-its resources by eliminating routine, repetitive review.

Legitimate concerns will be easily recognized under the program proposed by GE.

Summary GE proposes a fuel performance verification program consisting of inspec-tion of LTA's, offgas surveillance and visual examination of'a limited but statistically significant number of fuel bundles of two early commercial applications of new fuel designs.

GE believes that this program meets or exceeds the intent of SRP 4.2 regarding fuel surveillance, and in addition is cost-effective for GE and the utilities as well as the NRC, while providing timely, detailed, and useful information that will be of benefit in enhancing fuel performance.

e

v e

w-4A' ATTACHMENT f Page 4 of 4 GENER AL & ELECTRIC V.'

usunc Page 4 Please contact W. A. Zarbis (408-925-5070) or myself if you have any questions.

Very truly yours, J.M. Charnley Fuel Licensing Manager Nuclear Safety and Licensing Operation JSC:csc/IO9091*

cc:

L. S. Gifford (GE-Beth)

L. S. Rubenstein (NRC)

G. G. Sherwood (GE) e*

s l

ame l

t 1

=== =. a==:-

~-

.= = = = =-

= = = =,

ATTACllMENT 2 1.of 2 GENERAL $ ELECTRIC 3,

NUCLEAR POWER $YSTEMS DMSION GENER/1 ELECTRIC COMPANY e 175 CURTNER AVENUE e SAN JOSE, CAUFORNIA 95195 MCg,8208 b408) 925-3697 February 29, 1984 g

4 JSC-10-84 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Attention:

L. S. Rubenstein, Assistant Director Core and Plant Systems Gentlemen:

SUBJECT:

FUEL SURVEILLANCE PROGRAM

References:

1)

L. S. Rubenstein (NRC) to R. L. Gridley (GE),

" Post-Irradiation Fuel Surveillance,"

January 18, 1984 2)

NEDE-24343-P, " Experience with BWR Fuel Through January 1981," May 1981 3)

J. S. Charnley (GE) to C. H. Berlinger (NRC),

" Post-Irradiation Fuel Surveillance Program,"

November 23, 1984 This letter provides additional details requested by the NRC on GE's fuel surveillance program, and replaces our letter of January 27 on this subject.

The fuel surveillance program presented in your letter of January 28 (Reference 1) assures adequate verification of safe fuel performance while still maintaining efficient use of industry resources, and is acceptable to General Electric. ~We would like to take this opportunity to provide additional information in order to address the points raised in your letter.

Reference 1 states that the fuel surveillance program described in NEDE-24343 (Reference 2) could be considered eouivalent to that described in the Standard Review Plan if GE would:

"(1) verify that this program includes post-irradiation visual inspection of standard design fuel bundles which have not been identified as leakers by sipping or other methods, and (2) that.the current GE fuel surveillance program for standard fuel designs will continue at its present level of effort."

The first item is specifically considered in the GE program.

However, inspection of non-leakers is not performed on a routine basis but only in cases when information of special interest can be obtained.

In these cases, a total visual examination is parformed.

For instance, if GE 1

desired technical information on a particular subject such as end plug bkb i

l l

l

L, a., - - --.=::-

1^-

-l.L L. =

- ^ ^ ',l-

~~

~ J I--

~L-1 ATTACHMENT'2 Page 2 of 2 GENERAL $ ELECTRIC L. S.-Rubenstein Page 2 wear or model verification data, then the inspections described in the first item would be performed.

These inspections are performed at a variety of plants and include plants in which no fuel problems are expected.

Regarding the second item above, the GE fuel surveillanca program is currently planned to continue at approximately its present level of effort.

The number and type of inspections will vary from year to year, of course, depending on offgas measurements and the degree of technical interest.as explained in the previous paragraph.

The next point raised in Reference 1 concerns the conditional aspect of GE's lead test assembly (LTA) program described in Reference 3.

Detailed measurements of LTA's are not performed prior to irradiation in all cases..When the LTA's represent significant design changes, though, such as the advanced LTA's in Browns Ferry 3 and Peach Bottom 3, detailed measurements are performed prior to irradiation. 'In addition, detailed examinations are performed at the end of each operating cycle on specific LTA's and upon discharge of most LTA's, depending on the subsequent interest in implementing the design change demonstrated in the'LTA.

The final point raised in Reference 1 addresses the threshold of offgas activity that would result in non-routine inspection of standard fuel designs.

The offgas activity threshold would (a) vary from plant to plant, (b) be contingent on the amount of fuel failures predicted from the increase in offgas, and (c) depend on whether the cause of the failures could be identified without performing an examination.

Inspec-tions would generally be performed if the number of failures predicted is on the order of ten bundles, but this number could be more or less depending on the surrounding circumstances.

For example, if offgas activity approaches technical specification limits and a cause cannot be assessed, fuel inspections could be performed even if the number of fuel bundles with failures is judged to be fewer than ten.

On the other hand, if the cause is assessed - for instance, control blades 'were withdrawn at power - an inspection would not be performed even if the number of fuel bundle failures were greater than ten.

We hope that this response provides the clarification required to arrive at a mutually acceptable surveillance program.

Very truly yours, i

/

dM

, S. Charnley, Fuel L sing Manager Nuclear Safety and Licensing Operation JSC:jg/bO1231 i