Forwards Insp Repts 50-313/86-12 & 50-368/86-12 on 860331-0404.No Violations or Deviations Noted.Deficiencies Listed in Rept Require Response within 30 Days of Ltr Receipt
ML20206R843
Person / Time
Site: Arkansas Nuclear  
Issue date: 06/30/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20206R849 List:
References
NUDOCS 8607070236
Download: ML20206R843 (2)


See also: IR 05000313/1986012

Text

-

,

.

.-

.. -

._

_

_

-

-

.

-

..

'

JUN 301M

'

In Reply Refer To:

-

Dockets:

50-313/86-12

'

50-368/86-12

!

Arkansas ' Power & Light Company

i

ATTN: Mr. Gene Campbell

Vice President, Nuclear

,

Operations'

'

-

P. O. Box 551

Little Rock, Arkansas 72203

j

Gentlemen:

'

,

,

i

i

Thisrefers.totheinsp'ectionconductedbyMessrs.C.A. Hackney'and

J. B. Baird'of this office and other accompanying personnel during the period

March 31 through April 4, 1986,'of activities authorized by NRC Operating

1

l

Licenses OPR-51 and NPF-6, for Arkansas Nuclear One, Units 1 & 2 and to the

discussions of;our findings with Mr. J. M. Levine and other members of your

,

staff at the conclusion of the inspection.

-

~

Areas examined during the inspection included the iraplementation of the

2

emergency plan and. procedures during the annual exercise. Within these areas,

i

the inspection consisted of selective examination of procedures and

i

representative records,. interviews with personnel, and observations by the

j

inspectors.

These findin'gs are documented in the enclosed inspection report.

The enclosed report identified five deficiencies in your emergency preparedness

program.

It is requested that you provide this office with a schedule for

7

correcting these deficiencies within 30 days after receipt of this letter.

Within the scope of the inspection, no violations or deviations were

identifled.

l

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

i

Should you have any questions concerning this inspection, we will be pleased to

.,

'

discuss them with you.

Sincerely,

8607070236 860630

f*

hinal Signed b "

Y

PDR

ADOCK 05000313

ti

G

PDR

f:

J. E. Gagliardo, Chief

i

Reactor Projects Branch

Enclosure: (see next page)

,

RIV:EP&SPS% EP&$)ljd

C:EP&SP

D:

Ek

C:

C:RPB

$

CAHackney/tw

JBBaird

LAYande

R a Odrt

03 Hunter

JEGagl

rdo

L /O/86

i //1/86

w/ \\G/86

/f/86

$1486

6/Vi 8

'

/y

-

-

- -

- - -

- -

='

,,

Arkansas Power & Light Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-313/86-12

50-368/86-12

cc w/ enclosure:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE-35)

bec distrib. by RIV:

  • RPB
  • Resident Inspector

R. D. Martin, RA

  • R&SPB
  • Section Chief (RPB/B)
  • C. A. Hackney
  • MIS SYSTEM
  • RSTS Operator
  • L. A. Yandell

RIV File

DRSP

R. L. Bangart

R58

  • J. B. Baird

D. Weiss, LFMB (AR-2015)

  • w/766