Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205K834 + (ML20205K834)
- ML20205K837 + (ML20205K837)
- ML20205K841 + (ML20205K841)
- ML20205K842 + (ML20205K842)
- ML20205K844 + (ML20205K844)
- ML20205K846 + (ML20205K846)
- ML20205K847 + (ML20205K847)
- ML20205K850 + (ML20205K850)
- ML20205K851 + (ML20205K851)
- ML20205K852 + (ML20205K852)
- ML20205K853 + (ML20205K853)
- ML20205K856 + (ML20205K856)
- BSEP-99-0050, Informs NRC That Certain Category C,D & E Piping Welds in Units 1 & 2 Have Not Been Inspected in Accordance with Frequencies Provided by NRC GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, + (ML20205K857)
- ML20205K862 + (ML20205K862)
- ML20205K863 + (ML20205K863)
- IR 05000327/1988039 + (ML20205K864)
- ML20205K868 + (ML20205K868)
- ML20205K869 + (ML20205K869)
- ML20205K875 + (ML20205K875)
- ML20205K878 + (ML20205K878)
- ML20205K879 + (ML20205K879)
- ML20205K880 + (ML20205K880)
- ML20205K881 + (ML20205K881)
- ML20205K884 + (ML20205K884)
- ML20205K885 + (ML20205K885)
- ML20205K889 + (ML20205K889)
- ML20205K890 + (ML20205K890)
- ML20205K896 + (ML20205K896)
- ML20205K901 + (ML20205K901)
- ML20205K902 + (ML20205K902)
- ML20205K907 + (ML20205K907)
- ML20205K909 + (ML20205K909)
- ML20205K910 + (ML20205K910)
- 05000424/LER-1987-079, :on 880928,discovered Missed Surveillance of 870526 Sampling of Waste Gas Decay Tank.Caused by Component Failure & Lack of Sample Flow to Sampling Hood.Program Initiated to Set Torque Values for Clutches + (ML20205K911)
- ML20205K913 + (ML20205K913)
- ML20205K916 + (ML20205K916)
- ML20205K918 + (ML20205K918)
- ML20205K919 + (ML20205K919)
- ML20205K921 + (ML20205K921)
- ML20205K925 + (ML20205K925)
- ML20205K928 + (ML20205K928)
- ML20205K929 + (ML20205K929)
- ML20205K932 + (ML20205K932)
- 05000457/LER-1988-026, :on 880923,when Second Phase of Data Collection Attached,Turbine & Reactor Trip Occurred.Caused by New Type of Configuration & Lack of Proper Communications Between Personnel.Test Equipment Removed + (ML20205K934)
- ML20205K935 + (ML20205K935)
- ML20205K936 + (ML20205K936)
- ML20205K938 + (ML20205K938)
- 0CAN038707, Responds to NRC Re Suppl Info for Insp Repts 50-313/86-18 & 50-368/86-19 on 860725.Concerns Re Deficiencies Found in Procedures Discussed W/Staff & Improvements to Procedural Requirements Program Underway + (ML20205K940)
- RC-99-0075, 1998 Annual Effluent & Waste Disposal Rept for VC Summer Nuclear Station. with + (ML20205K941)
- L-88-050, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-348/88-26 & 50-364/88-26.Corrective Actions:Valve Closed, Sys Valve Alignment Check Performed,Lube Oil Strainer Inspected & Cleaned & Pump Restored to Operable Status + (ML20205K942)
- ML20205K948 + (ML20205K948)