Q;

%.,n W

,~

~.

m:,

=

,..!I

  • s TUCCO NUCLEAR ENGINEERING

' PROCEDURE REVISION ISSUE PACE CPSES Oh CONTROL COPY No, M f TNE-DC-22 2

1 0F 14 10/14/86 REPORTING ATTACHMENT PREPARED BY Obb LOADS AND 14 CATIONS APPROVED BY 8'

//

7

/

$Pd U Ifl

)

1.0 GENERAL ENGINEERING USE ON 1.1 Pe Pe-This procedure defines the requirements for the transmittal of embedded plate attachment loads and locations from all engineering disciplines to the Gibbs

& Hill Structural Embedment Group (SEG).

1.2 SCOPE The scope of this procedure is limited to attachments to strip and sheet plates in Unit I/com=on and Unit II.

The attachments included in this scope (but not limited to) are:

V a.

Pipe Support Engineering Discipline (PSE) 1.

Pipe Supports (large bore, small bore, BOP) 2.

Fire Protection Supports (Seismic) b.

Civil / Structural Discipline 1.

Conduit Supports (Category 1 and C-Train) 2.

Cable Tray Supports 3.

Civil Structural Items 4.

Junction Box Supports c.

Instrumentation and Controls (I&C) 1.

Instrument Supports 2.

Control Box Supports (etc) 3.

Instrument Line Supports d.

Mechanical

1. HVAC Supports Note: Pre-qualified plates are not within the scope of this procedure (e.g.,

plates designed exclusively for stairways, platforms, etc.)

OV

$@4 $$N

^

. m:.. a, -. :y: ~.v: ; ~:

c =

i7.

y-t;. -

TUCCO NUCLEAR ENGINEERING FROCEDURE REVISION ISSUE FACE CPSES REPORTING ATTACHMENT LOADS TNE-DC 22 2

2 0F 14 AND LOCATIONS TO STRUCTURAL 10/14/86 i

l 1.3 DEFINITIONS 1.3.1 WEB (Walls, Embedments, and Beams)

WEB is a computer program, developed by Westinghouse, used to monitor and qualify embedded plates.

1.3.2 CPSL Drawing Comanche Peak Support Location (CPSL) drawings are computer generated and reflect the WEB database for embedded plate geometry, projected attachment size, and attachment location.

j 1.3.3 Embedded Plate Embedded plates are steel plates flush with the concrete surface and anchored to the concrete with Nelson studs.

The purpose of the plates is to provide a weldable O.

surface for future support attachments.

1.3.4 Footprint Loads (FPL's)

FPL's are attachment loads at the face of an embedded plate expressed in the LOCAL COORDINATE SYSTEM (see ).

FPL's for attachmento cust be calculated for two conditions - Design and Faulted.

These conditions are defined as follcws:

,v O

I l

--a

... n.,s ; y, j b, :..'p. g.3.,y.

j:.,.

i EDCN-01 0 TUSCO ENGINEERING FROCEDURE REVISION ISSUE PAGE CPSES REPORTING ATTACERINT LOADS rNE-DC-22 2

10/14/86 3 0F 14 AND LOCATIONS TO STRUCTURAL a.

Seismic DESIGN

=D+L+T+Fo FAULTED = D + L + T + R +goFegs Where:

D = Deadweight Load L = Live Load T = Max operation or Shutdown Thermal Load R = Reactions Due to Water Hammer,' Valve Closure, Water Slug and similar phenomena, Fogo = oBE Load Feqs = SSE Load or ((SSE)2 + (LocA}2) 1/2 Load (where applicable)

Noter For PSE, the two conditions are defined as follows:

O DESIGN

=

Level A or' Level B whichever is higher FAULTED =

Level C or Level D whichever is higher b.

Non-Seismic Each discipline or discipline designee shall apply a seismic factor to the deadweight load as dictated by their governing procedures.

1.3.5 Attachment

" Attachment" is any permanent steel welded to the face of an embedded plate. Threaded Nelson studs used for one support shall be classified as one attachment if the distance from the centerline of one Nelson stud to the next does not exceed 12" (e.g. Junction boxes, conduit straps, etc.)

1.3.6 Field Engineering

" Field Engineering" is the Brown & Root organization responsible for surveying and for performing field walkdowns.

1.4 RESPONSIBILITIES O

The Director, comanche Peak Engineering (CPE), has l*

I y

h

4 -

,,* o

..t.

v..

EDCN-01 0 TUGC0 ENGINEERING FROCEDURE REVISION ISSUE PAGE CPSES Ad REPORTING ATTACHMENT LOADS 1NE-DC-22 2

10/14/86 4 0F 14 AND LOCATIONS TO STRUCTURAL overall responsibility for the implementation of this procedure.

The Civil Engineering Manager is responsible for assuring that the interfacing non-CPE organizat, ions are informed of their respective responsibilities and have generated the necessary procedures to comply with the requirements specified herein.

The other Comanche Peak Engineering (CPE) Unit Managers ll*

attaching to building structures are responsible for the specific implementation of this procedure.

1.4.1 Structural Embedment Group (SEG)

SEG shall be responsible for the following:

a.

Locating supports from Field Engineering as-built sketches and initiating,FPL transmittals.

b.

Monitoring and' qualifying attachment locations and I

reported loads on the embedded plates.

c.

Monitoring and qualifying spacing violations between loaded Hilti bolts / Richmond inserts to loaded Nelson studs of embedded plates.

d.

Notifying responsible disciplines, according to Procedure TNE-DC-22-1, of acceptance or rejection of support attachment loads and/or location, due to overstressed embedded plates.

e.

Preparing CPSL drawings according to the WEB user's manual.

f.

Dispositioning Nonconformances (NCR's) that affect embedded plates.

1.4.2 Field Engineering

1. 4 '. 2.1 Information Furnished by Field Engineering Field Engineering shall perform field walkdowns of each room utilizing CPSL drawings to identify all building attachments affecting embedded plate qualifications.

Field Engineering as-built sketches shall be prepared in accordance with procedure CCP-9 Field Surveys.

l e

n.-n

M- ',.

M _,

. - - " - - " " ~

f(,

3

.\\

,s 1

TUCCO NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE PAGE CPSES p

REPORTING ATTACHMENT LOADS TNE-DC-22 2-10/14/86 5 0F 14 AND LOCATIONS TO STRUCTURAL 1.4.3 Civil / Structural Civil / Structural shall be responsible for the following:

l Verifying that support identification is accurate a.

for the support location given on an FPL.

b.

Calculating FPL's for each embedded plate attachment.

c.

Transmitting the latest FPL's, weld configurations, and load calculation number and revision to SEG via TNE Engineering Assurance (EA).

d.

Resolving overstress and spacing violations identified by SEG (e.g., by refining loads, relocating or modifying attachment).

O e.

Initiating and transmitting an FPL transmittal,

\\_ /

using design location, when a new attachment is added to an embedded plate.

f.

Notifying SEG when attachments affecting embedded l

plate qualification are deleted.

g.

Transmitting a copy of all design drawings showing spacing violations pertaining to embedded plates to SEG.

1.4.4 Pipe Support' Engineering (PSE) j PSE is responsible for the following:

a.

Verifying that support identification is accurate for the support location given on an FPL.

b.

Calculating FPL's for each embedded plate attachnent.

c.

Transmitting the latest FPL's, weld ccnfigurations i

and load calculation number and revision to SEG via EA.

d.

Resolving overstress and spacing violations g

identified by SEG (e.g., by refining loads, l

relocating or nodifying attachment).

I i

1

7^

'~-*"""W L.

.,.,:c.-

p

. q.

.y. c y. y. j... -. - _,

Q',

4. ).f:.. p.,:

.u I

TUCCO NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE

'PAGE CPSES i

REPORTING ATTACHMENT LOADS TNE-DC-22 2

10/14/86 6 0F 14 j

AND LOCATIONS TO STRUCTURAL Initiating and transmitting an FPL transmittal, e.

using design location, when a new attachment is added to an embedded plate.

I l

f.

Notifying SEG when attachments affecting embedded j

plate qualification are deleted.

g.

Transmitting FPL's for support attachments made by i

I&C to SEG via EA.

i h.

Initiating and transmitting FPL's for support J

attachments made by non-seismic Fire Protection to l

j.

SEG via EA.

1.4.5 Instrument & Controls (I&C) i i

I&C shall be responsible for initiating FPL transmittals l

and providing PSE with support type and location (from Field Engineering as-built sketches) for any attachments to embedded plates, via FPL transmittal.

They shall

'dded or i

also notify PSE when supports.are modified, a

i deleted.

1.4.6 Non-seismic Fire Protection k

Non-seismic Fire Protection shall be respcnsible for l

1 providing PSE with fire protection support types and

(

locations for any attachments to embedded plates.

They shall also notify PSE when supports are modified, added or deleted.

1.4.7 Mechanical (HVAC)

Mechanical shall be responsible for the following:

a.

Initiating FPL's for all applicable attachments I

affecting embedded plate qualification.

I b.

Transmitting the latest attachment size, locations, l

FPL's, weld configuration and calculation number i

and revision to SEG via EA.

c.

Resolving of overstress and spacing violations identified by SEG (e.g. refining loads, as-built j

location or attachment modification).

4 l

~

="

=-

-f -

] ~-

~-

3 c 7,-

... %.s; 1

~J...

': l s

CPSES PROCEDURE REVISION ISSUES FAGE TUGCO NUCLEAR ENGINEGING 3

4 bq REPORTING ATTACHMENT LOADS TNE.DC-22 2

10/14/86 7 0F 14 AND LOCAT;ONS TO STRUCTURAL 1

1-d.

I.71tiating and transmitting an FPL transmittal,

/

ising dusign location, when a new attachment is a

e added to an embedded plate.

Notifying SEG Vaan attachments aftehting. embedded l'

e.

plate quali'fication are deleted.

f.

Transmititing a copy of all Design Drawingi' showing I

spacing violations pertaining to embedded plates to SEG..

l 1.4.8 Gang Supports s

It shall be the respon.11bility of the Engineering discipline attaching to the embedded plate tg account for loads from all secendary supports.

These 1,oads will then be combined with the primary support load'tc give a*

total FPL at the face of the embed.

2.0 COMPLETION AND TRANSMITTAL OF FPL FORMS BY DISCIPIINES' Zach respons'ible engineering discipline shall provide footprintricads for each attacament to embedded plates.

Infor:iataan regarding location and si:e of the i

attachment shul be provided in lines I thtbugh 5.

Information regarding footprint loads shall"se.provided in linss 6 through 9.

The following is a line-by-line instruction on c npleting'and transmitting the Tootprint Load Transaittal form (figure 1):

2.1 Transmittal No.,

Rev_. and Page

'l

+

The discipline, initiating the FP;. shall obtain a sequential. number from TNE Engineering Support for each attachment, not for each support, since a support may' have more than one attachmsa.nt to an et.ceddeG plate (see i

instruction on Support No'.' and Support AttAcht.4% No.

below).

.The first issue of an FPL form shall be rev. d.

\\

The FPL form shall be page.1 of nI (Nhere n is The total number of p' ages) sketenac appended thereto shall be labeled with the FPL # and numbered page 2 of n,

n (n shall be entered !,p'all pages by the discUline etc.

V tranamItting the FPL to EA) 4 O

P si s

s g'

  • e

-A

,u

....e

,.-.-s

. 3, 4

j e,

, r. t...

s s

r s

(

s TUCCO NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE FACE CPSES V

REPORTINC ATTACHMENT. LOADS TNE-DC-22 2

10/14/86 8 0F 14 AND LOCATIONS TO STRUCTURAL r.

4 t

2.2 Support No. and Support Attachment No.

Enter the support number.

When the support number is not available, a unique number shall be temporarily i

assigned by SEG.

Temporary " support numbers" shall be replaced by the responsible discipline with a unique 4

identification number traceable to the load calculation 1

number.

The support number shall contain no more than s

j seventeen (17) characters (i.e., numbers, letters, j

hyphens and blanks).

If the support number exceeds 17 l

characters, the discipline must abbreviate it.

Each attachment shall be assigned a letter, beginning vith "A".

For example, if a support has five attachments, only three of which attach to embeds, then the first attach =ent to an embed is A of 3, the second B of 3, and the third C of 3.

For this example, 3 FPL 4

forms are required, one for each attachment to an embed..

!O c

j Q For attachments located in Unit I and common, lines 1 i

through 5 shall be omitted.

Line 1:

CPSL Drawing # - Fill in the CPSL sketch number and its latest revision number, obtained from the title block of the CPSL drawing.

l Fill in the number of the embedded plate to Embed #

which the attachment is connected, obtained from the l

CPSL sketch.

Room # - Enter the appropriate room number.

Line 2:

Fill in the attachment length and width.

"X" is the dimension of the attachment along the width of the embed; "Z"

is the dimension of the attachment along the lenath of the embed.

J Line 3 tsing either "left end" or "bettom end" (as defined in l

' ) as a reference point, fill in the distan=a in feet from that reference point to the center of the attachment.

i k

\\'

s-N j f l

^ l.:,.

y].,

4 M.1 Jq

,. ~..,.. '.

+

TUGCO NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE PAGE C?SES

. f3

/

REPORTING ATTACHMENT LOADS TNE-DC-22 2

10/14/86 9 0F 14 AND LOCATIONS TO STRUCTURAL Line 4:

Enter the offset distance in feet from the Z-axis of the embed (as defined in Attachment 2) to the center of the attachment.

Note:

The FPL originator shall attach a sketch of the attachment to the embedded plate.

Line 5:

The preparer and checker of all the information in lines 1 through 4 shall sign their names.

Checker shall enter the date that checking is complete.

Line 6:

Enter the calculation number and revision.

b v/

Line 7:

Using the LOCAL COORDINATE SYSTEM (Reference figure 1),

fill in the footprint forces and moments at the C.G.

of the attachment weld on the face of the embed.

Note that I

forces are in KIPS, and moments in FCOT-KIPS.

If one of the two load conditions does not apply, so indicate, by lining thrr. the appropriate box.

Otherwise, both load conditions must be filled in.

For loads and moments, three significant figures will suffice.

Note:

The responsible engineering discipline shall provide a sketch of the design drawing showing the weld configuration.

Line 8:

Check the appropriate line indicating whether the loads are " conservative" or " refined".

Line 9:

The precarer and checker of the infor=ation given on lines 6'through a shall sign their names.

Checker shall enter the date that checking'is complete.

O m

=

.-f -

_z ys.,:. ~; :.v.;,.] yer p (..* :

n m,-

~~.

8.'.'

r A

TUGC0 NUCLEAR ENGINEERING PROCEDURE REVISION ISSU1 PAGE CPSES O.

REPORTING ATTAC10ENT LOADS TNE-DC-22 2

10/1.4/86 10 0F 14 AND LOCATIONS TO STRUCTURAL I

Line 10:

Indicate any additional distribution required other than standard distribution by TNE Engineering Support to

[

SEG.

Line 11:

The discipline representative shall sign, enter the discipline, and transmit the original FPL form to TNE Engineering Assurance (EA) for review and processing according to Procedure TNE-AD-4.

2.2 REVISIONS To revise previously transmitted information, the same 4

FPL number (with the sequential revision number) shall be used and a.new FPL form shall be prepared and O

processsd in accordance with the requirements specified

' O.

in Section 2.

2.3 VOIDING OF FPL FORMS To void a previously submitted foot-print load transmittal for=, a copy of the FPL shall be submitted to EA stating on the form that the FPL is void and the reason it was voided (e.g.,

Voided support, duplicate FPL, etc.).

3.0 PLATE ANALYSIS SEG shall analyze embedded plates according to Procedure TNE-DC-22-1,.

2 4

.,m,m--

~n e

4 r -,, -


c

- u -- __. _ __

.g.

.s TUGC0 NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE PACE CPSES l'

(

REPORTING ATTACHMENT LOADS TNE-DC-22 2

10/14/86 11 0F 14 AND I4 CATIONS TO STRUCTURAL 3.1 NOTIFICATION OF ANALYSIS RESULTS 3.1.1 Acceptable Attachments SEG will notify the respective disciplines of approved attachments in accordance with procedure TNE-DC-22-1.

3.1.2 Steps for Resolving Unacceptable Attachments SEG will, notify any discipline (s) responsible for an unacceptable attachment in accordance with procedure TNE-DC-22-1.

SEG will make recommendations to the responsible engineering disciplines to resolve any overstressing condition.

Step one.

The originating engineering discipline shall provide more refined loads, if not already provided.

~.

SEG shall then reanalyze the embedded plate.

4

' Sten two.

SEG, will perform a more refined analysis.

Sten three. The engineering discipline shall redesign and/or modify the entedded plate attachments.

O

~A,-

- - _ _. ~ ~.

j-

. -.:._ w.,. v.;

..f..

.p

~

TUCCO NUCLEAR ENGINEERING PROCEDURE REVIS' ION ISSUE PAGE CPSES REPORTING ATTACHMENT LOADS TNE.DC-22 2

10/14/86 12 0F 14 AND LOCATIONS TO STRUCTURAL ATTACHMENT 1 EMBEDDED PLATE LOCAL COORDINATE SYSTEM 1

h e

I i

i l

i E

1 u.I w

-[

I

/

g -.

/ 00TioM j

,/

1

/

L__

.,g o

e : ; :.: = : ~,

.;i'.

7;..

3,,,

~

- ~ _

TUCCO NUCLEAR ENGINEERING PROCELURE REVISION ISSUE.

PACE CPSES REPORTING ATTACHMENT LOADS TNE.DC.22 2

10/14/86 13 0F 14 AND LOCATIONS TO STRUCTURAL ATTACHMENT 2 ORIENTATION ANGLE 5*

5*

\\

_L I

qf ' ~;

' 6.r FOR -85* < 0 < +85* USE LEFT I

FOR +85* :!E O :!; +95* USE BOTTOM i

+\\'

l

  • //

~

z s\\

l c/

mu r.

c.

m'W Os

  • sl.

r, clw r*\\

xw 1

7 l

4 4 e

  1. l (D y'

$1e QOTT0f.

\\ &~W.

i e.

s c.

LEFT.

ru a

el I

/

w u.

>o l

L.._.._.._

WIDTH

+

., HORIZONTAL AXIS

,e",

LEFT 0F CPSL SKETCH

/

s L E: T' S'c,3 l

s_

I I,

.4 s

cl 1

l:

[

CPSL

' SKETCH x

i+

TITLE BOTTOM BLOCK i

\\

O

.O

__ y

,-l

.y Q...j.y.

' f'..

.v.

<s

-~;. u;.: e i. q c :

3,-

.- +<

.2 4

j

.s i

TUCCO NUCLEAR ENGINEERING PROCEDURE REVISION ISSUE PACE CPSES 1

5.

REPORTING ATTACHMENT LOADS TNE-DC-22 2

10/14/86 14 0F 14 AND LOCATIONS TO STRUCTURAL 7

FIGURE 1 1

(TYPICAL) 1 1

f Page of

{

700TFR1NT LDAD TRANSMITTAL TRANSMITTAL NO. FFL-Rev.

I Support No.

A Support Attachment of i

TO TNE EA t

14 CAL COOCINATE SYST!.W.

I The following information on size. location, and footprini loads is transmitted for processing in accordance with TNE AD-..

1. CPSL Sket:h a

/0F-Embeds t-Roos *

2. Attachment size:

X-in..

Z=

in.

3. Distance from left or bottom end to centet of ettachment -

ft.

6. Off set fres Z - centerline of embed to Center of attachment ft.

(up or left = +: down or right - -)

S. Size & location prepared by Checked by Date i

6. Calculation =

Rev.

7 Footprint loads at C.G. of ettachment weld and in plate local coordinates i

F = (KIPS,

I 4 - (FXT-KIPS',

f f

fM I

W C

S M

j esi e i

i i

i l

}

I Fa.'ted i ' cads are-Conservative or refined o toads prepared by Chec' red by Cate 10 Special Instructions: Distribute coe-r to Civil /SIO 11 Flease acks vledre receipt of the origina of this transnistal.by signing dating and returnin5 a copy to the discip ine representative Trans=itted by:

Discipline xxxxxxxxxxxx-----

-x-

---xxxx--


xxxxxxxxxx Received and reviewed for procedural compliance.

Date

.:.s v.

l Date.

re:etred oy

...........e e. n s 3.,_,.. _

1 i

i FORM: TNE-DC-22.1 Sept. 1986

- -.-., -_.