Notice of Violation from Insp on 880806-0912.Violations Noted:Licensee Personnel Failed to Follow SI-82.2 in Proper Sequence While Performing Work on Radiation Monitor 2-RM-90-106 on 880831
ML20205K853
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/20/1988
From: Mccoy F
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20205K723 List:
References
50-327-88-39, 50-328-88-39, NUDOCS 8811010374
Download: ML20205K853 (4)


Text

_ _ _ _ _ _

s ENCLOSURE 1 NOTICE OF VIOLATION Tennessee Valley Authority Docket Nos. 50-327, 50-328 Sequoyah License Nos. DPR-77, OPR-79 During the Nuclear Regulatory Commission (NRC) inspection conducted August 6 through September 12, 1988, violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions " 10 CFR Part 2, Appendix C (1988), the violations are listed belw:

A.

Technical Specification 6.8.1 requires that written orocedures shall be established, implemented and maintained covering the activities listed in Appendix A of Regulatory Guide 1.33 Revision 2, including surveillance and test activities of safety related equipment.

Contrary to the above, licensee personnel failed to follow SI-82.2 in the proper sequence while performing work on radiation monitor 2-RM-90-106 on August 31, 1988.

As a result, Unit 2 experienced a Containment Ventilation Isolation when a test signal was injected into the monitor.

Contrary to the above, licensee personnel f ailed to follow SI-83 on Septerrber 3, 1988, while performing work on 0-RB-90-101. As a result, an Auxilitry Building Isolation occurred.

l This is a Severity Level IV Violation (Supplement 1).

B.

Technical Specification 3.3.1 requires the reactor instrumentation listed j

in table 3.3-1 to be operable and that table notation 6 be entered as the Action Statement when less than 4 channels of Overpower Golta T Trip or less than 4 channels of Overtemperature Delta T Trip are.,cRABLE.

Table i

notation 6 requires the inoperable channel be placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in order for power operation to continue.

[

Technical Specification 3.3.2 requires the Engineered Safety features Actuation System (ESFAS) instrumentation channels shown in Table 3.3-3 to be OPERABLE aad that table notation 16 be entered as the Action Statement when less than 4 channels are OPERABLE.

Table notation 16 requires the inoperable channel to be placed in the tripped condition within I hour in order for power operatior, to continue.

(

Contrary to the above, reactor trip channels for Overpower Delta T i

channel 4 and Overte perature Delta T channel 4 were not placed in the tripped condition for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> while they were in an inoperable condition, and Steam Flow in Two Stean Lines Hign channel 4 was not placed in the

[

tripped condition for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> and 20 minutes while in an inoperable l

t o

1 l

Tennessee Valley Authority 2

Docket Nos. 50-327, 50-328 Sequoyah License Nos. DPR-77, DPR-79 condition. These chani.els became inoperable when the T Average channel associated with the*e trip and ESFAS channels was placed in an inoperable status.

This is a Severity Level IV Violation (Supplement I).

C.

Technical Specification 6.8.1 requires that procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, be established, implemented, and maintained.

This includes maintenance procedures.

Contrary to the above, Work Plan 7152-01 was inadequate and not properly implemented in that perfornance of the Work Plan on August 4, 1988 resulted in a load shed of IB-B 6.9 kv shutdown board and a loss of the board for approximately 20 mit.utes.

This is a Severity Lovel IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Tennessee Valley Authority is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Director, Of fice of Special Projects, and a copy to the NRC Resident Inspector, Sequoyah, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly markeo as a "Reply to a Notice of Violation" and should include (for each violation): (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the I

corrective steps which have been tsken and the results achieved, (4) the I

corrective steps which will be taku to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

l FOR THE NUCLEAR REGULATORY COMMISSION l

1 Fran R McCoy, Assistant Director for TVA Inspection Programs Division of TVA Projects Office of Special Projects Dated at Atlanta this pr4 day of k;trbg1933 o c. roes ne, l

9 ENCLOSURE 1 N0f!CE OF VIOLATION Tennessee Valley Authority Docket Nos. 50-327, 50-328 Sequoyah License Nos. OPR-77, OPR-79 Ouring the Nuclear Regulatory Commission (NRC) inspection conducted August 6

~

through September 12, 19S8, violations of NRC requirements were icentified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violations are listed below:

t A.

Technical Specification 6.8.1 requires that written procedures shall be established, implemented and maintained covering the activities listed in i

Appendix A of Regulatory Guide 1.33. Revision 2, including surveillance I

and test activities of safety related equipment.

Contrary to the above, licensee personnel failed to follow SI-82.2 in the 1

2 proper sequence while performing work on radiation monitor 2-RM-90-106 on August 31, 1988.

As a result. Unit 2 experienced a Containment Ventilation Isolation when a test signal was injected into the monitor.

Contrary to the above, licensee personnel f ailed to follow SI-83 on i

September 3, 1983, while performing work on 0-RB-90-101. As a result, an Auxiliary Butiding Isolation occurred.

This is a Severity Level IV Violation (Supplement 1).

l B.

Technical Specification 3.3.1 requires the reactor instrumertation listed l

in table 3.3-1 to be operable and that table notation 6 be atered as the Action Statement when less than 4 channels of Overpower f elta T Trip or It.ss than 4 channels of Overtemperature Delta T Trip are 'fERABLE.

Table notation 6 requires the inoperable channel be placed in the tripped

[

condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in order for power operation te continue, i

Technical Specification 3.3.2 requires the Engineered Safety Features I

Actuation System (ESFAS) instrumentation channels shown in Table 3.3-3 to be OPERABLE and that table notation 16 be enterad as the Action Stat & t when less than 4 channels are OPERABLE. Table notation 16 requiras the inoperable channet to be placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in order for power operation to continue.

Contrary to the above, reactor trip channels for Overpower Delta T l

channel 4. and Overtemoerature Celta i channel 4 were not placed to the i

tripped condition for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> while they were in an inoperrble co',dition, l

and Steam Flow in Two Steam Lines High channel 4 was nat placed in the I

tripped condition for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> and 20 minutes while in an inoperable l

t 4

Tennessee Valley Authority 2

Docket Nos. 50-327, 50-328 Sequoyah License Nos. OPR-77 DPR-79 condition. These channels became inoperable when the T Average channel associated with these trip and ESFAS channels was placed in an inoperable status.

This is a Severity Level IV Violation (Supplement I).

C.

Technical $pecification 6.8.1 requires that procedures recommended in

/ppendix A of Regulatory Guide 1.33, Revision 2, be established, i

implemented, and maintained.

This includes maintenance procedures.

Contrary to the above, Work Plan 7152-01 was inadequate and not properly I

implemented in that performance of the Work Plan on August 4, 1988 l

resulted in a load shed of 1B-B 6.9 kv shutdown board and a loss of the l

board for approximately 20 minutes.

This is a Severity Lovel IV Violation (Supplement !).

Pursuant to the provisions of 10 CFR 2.201, Tennessee Valley Authority is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Director, Office of Soecial Projects, and a copy to the NRC l

Resident Inspector, Sequoyah, within 30 days of the date of the letter I

transmitting this Notice. This reply should be clearly marked as a "Reply to a Notice of Violation" and should include (for each violation): (1) admission or dental of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION g

Fran R McCoy, Assistant Director for TVA Inspectie'. Programs Division of TVA Prejects Office of Special Projects Dated at Atlanta g9 this prA day of E : trN 193 o c.roesm