Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205A842 + (ML20205A842)
- TXX-4466, Forwards Draft Rev 2 to Program Plan & Issue-Specific Action Plans. Draft Covers Historical Perspective & Response Team Charter.Action Plans Are for Electrical, Testing & Civil/Structural Disciplines + (ML20205A845)
- ML20205A846 + (ML20205A846)
- ML20205A850 + (ML20205A850)
- ML20205A854 + (ML20205A854)
- ML20205A856 + (ML20205A856)
- ML20205A857 + (ML20205A857)
- ML20205A858 + (ML20205A858)
- ML20205A861 + (ML20205A861)
- ML20205A863 + (ML20205A863)
- ML20205A864 + (ML20205A864)
- ML20205A867 + (ML20205A867)
- ML20205A871 + (ML20205A871)
- IR 05000259/1986003 + (ML20205A872)
- ML20205A875 + (ML20205A875)
- ML20205A876 + (ML20205A876)
- ML20205A880 + (ML20205A880)
- ML20205A883 + (ML20205A883)
- ML20205A884 + (ML20205A884)
- 05000382/LER-1999-002, Forwards LER 99-002-00 Re Leaks Discovered on Instrument Nozzles in Rcs.Event Being Reported Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(i)(B) + (ML20205A885)
- ML20205A886 + (ML20205A886)
- B17716, Informs That NNECO Has Reviewed Millstone Unit 2 ICAVP Final Rept Supplement Summary Dtd 990319,which Was Issued by Parsons Power.Nneco Has No Further Comment on Rept & Requests That ICAVP Order for Unit 2 Be Closed + (ML20205A892)
- ML20205A893 + (ML20205A893)
- ML20205A894 + (ML20205A894)
- ML20205A897 + (ML20205A897)
- ML20205A899 + (ML20205A899)
- ML20205A900 + (ML20205A900)
- 05000382/LER-1999-002-03, :on 990225,discovered RCS Pressure Boundary Leakage on Two Inconel 600 Instrument Nozzles.Caused by Axial Cracks Near HAZ of Nozzle Partial Penetration Welds Resulting from Pwscc.Leaking Nozzles Have Been Repaired + (ML20205A905)
- ML20205A906 + (ML20205A906)
- ML20205A909 + (ML20205A909)
- ML20205A912 + (ML20205A912)
- ML20205A915 + (ML20205A915)
- ML20205A917 + (ML20205A917)
- ML20205A920 + (ML20205A920)
- ML20205A922 + (ML20205A922)
- ML20205A923 + (ML20205A923)
- ML20205A924 + (ML20205A924)
- IR 05000254/1987005 + (ML20205A925)
- ML20205A926 + (ML20205A926)
- ML20205A928 + (ML20205A928)
- ML20205A931 + (ML20205A931)
- ML20205A932 + (ML20205A932)
- ML20205A934 + (ML20205A934)
- L-99-046, Forwards Response to NRC 990114 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs + (ML20205A935)
- ML20205A936 + (ML20205A936)
- ML20205A937 + (ML20205A937)
- 1CAN108405, Responds to IE Bulletin 84-03 Re Refueling Cavity Water Seal.Encl Drawing Illustrates Heights of Reactor Cavity Transfer Canal & Spent Fuel Pool.Seal Not Used.Aperture Card Available in PDR + (ML20205A939)
- ML20205A940 + (ML20205A940)
- ML20205A941 + (ML20205A941)
- ML20205A943 + (ML20205A943)
- ML20205A944 + (ML20205A944)