Forwards Specs for Parking Arrangements & Util Svcs for Region II Mobile Lab.Requests Svcs Be Made Available at Two Separate Locations
ML20205A909
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/25/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8608110476
Download: ML20205A909 (3)


Text

=

O W I C i&L) r

.- 3 jut 25 IIII Caro M Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

UTILITY SERVICES AND PARKING ARRANGEMENTS FOR NRC REGION II M LABORATORY AT SHEAR 0N HARRIS NUCLEAR POWER PLANT During a telephone conversation on July 22, 1986, specifications for parking arrangements and utility services for the Region II mobile laboratory were discussed with Mr. E. A. Morgan of your staff. The specifications are provided in the Enclosure.

separate locations. We request that you make these services available at two One location should be as close as practicable to the facility count room and will be used during routine operations. The other location during should besituations.

emergency near your emergency operations facility and would be used We appreciate your cooperation on this matter. If you have any questions, please call William B. Gloersen at 404/331-6279.

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosure:

Specifications for Region II Mobile Laboratory cw nel:

. A. Watson, Vice President Harris Nuclear Project LJVC. Tibbitts, Director of Regulatory Co liance

. Willis, Plant General Manager

. M. Sipp, Manager, Environmental and Radiation Control bec w/ encl: (See page 2) 8608110476 860725 PDR A ADOCK 05000400 'l PDR A

i

. - S. ,

7 w- ,

~

Carolina Power and Light Company- 2

., 'T bec y/ encl'.

E.-Earth, ELO '

@ re, GLD -

$HtC Resident Inspector -

pocumentControloesk .

. State of North Carolina ).

s s

a

\.

s t

1 P.

3

( /

! s i

RII $1 RII{h gI

,] ,,r ..I ;r ersen: kap LMe Fr rTckson 7//f/86 PStoddart 7p/86 DCollins (7/a.it/86eng//29/86; 7/jy/86 e

t j 'A 4

.v-.,--,,- .. m,_v.,c .,,-e---1 , , , , _ _ , , _ , , , , , _ __, __ __ , _ _ , , , , , _ , , _ _ _ , , _ , , j

+

. s i

ENCLOSURE Specification for Region II Mobile Laboratory .

Item Specification Comment 4

1 Vehicle Parking 30 feet long Site should be surfaced and 8 feet wide level. Additional clearance 14 feet tall for ease of parking should be "

considered.

Electrical outlets 3 lines with separate Care should be taken to ensure circuit breakers each that there are no. surges or 120V, 30A within or large fluctuations on these 25 feet of Mobile lines.

3 Lab. Receptacles to be compatible with Hubbell 125 V, 20 amp three prong twist lock plugs.

Telephone outlet One standard telephone i outlet within 25 feet of

Mobile Lab.