AU6 0 71986 Docket No. 70-36 Combustion Engineering, Inc.
ATTN: Mr. H. V. Lichtenberger Vice President Manufacturing Nuclear Power Systems Windsor, CT 06095 Gentlemen:
This refers to the routine safeguards inspection conducted by Mr. T. J. Madeda of this office; Mr. D. A. Huff of the Office of Inspection and Enforcement; Mr. A. Della Ratta, Region I, and Mr. G. Nelson, Region V on July 7-11, 1986 of activities at the Combustion Engineering Hematite Plant, authorized by NRC Special Nuclear Materials License No. SNM-33 and to the discussion of our findings with Mr. J. A. Rode and other members of his staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
In addition, as part of the inventory verification, the selection of 17 samples were submitted to the New Brunswick Laboratory for analysis. An addendum to the enclosed inspection report will be issued following receipt of analytical results from the New Brunswick Laboratory.
The addendum will include an evaluation of the submitted results.
During this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice.
A written response is required.
In addition, several items were discussed with site senior staff managers to improve the effectiveness of the material control and accounting program.
The items are addressed in Paragraph 6 of the Report Details. We request that you notify this office if any of the items discussed will not be implemented.
Areas examined during this inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Consequently, the enclosure to this letter, our report of this inspection, and your response to the violations identified in the enclosure to this letter will not be placed in the NRC Public Document Room.
Therefore, your statement of corrective action regarding the violation identified in the enclosure should be submitted as
)
$[4 a separate enclosure to your transmittal letter.
8608110485 860807 PDR ADOCK 07000036 C
PDR i
ATTACHMENT CONTAIS 10 CFR 2.790(d) INFO
s Combustion Engineering, Inc.
2 AUG 0 71986 The responses directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
.We will gladly discuss any questions you have concerning this inspection.
Sincerely, W.
. Axelson, Chief Nuclear Materials Safety and Safeguards Branch
Enclosures:
1.
Inspection Report No. 70-36/86001(DRSS)
(PART 2.790(d) INFORMATION) cc w/ enclosure:
J. A. Rode, Plant Manager DCS/RSB (RIOS) 6 l
R RII f,III RIII R14I Y33 "TV~ s Ma[ eda /kst P
Creed}'
Fgance A
on ATTACHMENT CONTt'"5
(
10 CFR 2.790(d) lieo
.