ML20205A884
| ML20205A884 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/05/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8608110470 | |
| Download: ML20205A884 (1) | |
Text
-
AUG 0 51986 Carolina Power and Light Company 64TTN: Mr. E. E. Utley i
Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT RADIOLOGICAL EMERGENCY PLAN REVIEW, DOCKET NOS. 50-325 AND 50-324 We have completed our review of Revision 21 of the Brunswick Radiological Emergency Plan, dated May 28, 1986.
Our review indicates that these changes to your Brunswick Radiological Emergency Plan continue to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your Plan which may decrease the effectiveness of the Plan. However, if your safety review indicates no decrease in the level of emergency preparedness, then changes can be made without NRC approval.
In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).
Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E,Section V.
Should you have any questions regarding this letter, please contact Mr. Thomas R.
Decker of our staff at 404/331-2600.
Sincerely, 8608110470 860805 PDR ADOCK 05000324 F
PDR David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects cc:(f. W. Howe, Vice President frunswick Nuclear Project if. R. Dietz, Plant General Manager bcc:
C Resident Inspector Document Control Desk State of North Carolina k
L__
[cq(7/
PFredrickson ATabaka TDecker DCollins ellen 7//t/86 7/y/86 7/
86
/^6-sMg sids&
E e L
L.
. _,