ML20205A863

From kanterella
Jump to navigation Jump to search
Forwards SER Accepting Proposed Plan for Restart of Peach Bottom Atomic Power Station. Plan Meets Requirement V.C. of 870331 Order Suspending Power Operations & Order to Show Cause
ML20205A863
Person / Time
Site: Peach Bottom  
Issue date: 10/19/1988
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205A868 List:
References
NUDOCS 8810260120
Download: ML20205A863 (2)


Text

__ _

g,

19 OCT G88 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. C. A. McNeill Executive Vice President-Nuclear Correspondence Control Oesk P. O. Box 7520 Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Peach Bottom Atomic Power Station Safety Evaluation Report The enclosed Safety Evaluation Report (SER) documents our acceptance of your proposed "Plan for Restart of Peach Bottom Atomic Power Stction" (PBAPS) received April 8,1988 and the supplemental information listed in Appendix B of the SER.

Accordingly, we conclude that this plan meets Requirement V.C. of the March 31, 1987 Order Suspending Power Operations and Order to Show Cause that the licenste submit a detailed and comprehensive plan end schedule for completion of plan corrective action activities to ensure that the facility will be operated safely and comply with all requirements including station procedures.

We will continue to monitor the effectiveness of the implementation of this plan by conducting additional inspections including an integrated assessment team inspection at the PBAPS before making our recommendation to the Commission concerning authorization to restart the fecility.

Sincerely, ORIGMAL S!GNED BY UNiam W. T. Russell Regional Administrator

Enclosure:

Safaty Evaluation fh U d 0FFICIAL RECORD COPY PEACH BOTTOM SER REPORT - 0001.0.0 881026012o estog, MN gDR ADock o5000277 PDC L

+

+

4 Philadelphia Electric Company 2

cc.w/snel:

John S. Kemper, Sr., Senior Vice President-Nuclear l

J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairs.an, Nuclear Review Board l

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Marager, Fuels Department, Delmarva Power & Light Co.

E John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations

}

W. M. Alden, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)

Local Public Document Room (LPDR) i Nuclear Safety Information Center (NSIC)

~

NRC Resident Inspector Commonwealth of Pennsylvania i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRM (w/o enc))

t Section Chief, DRP 9A0 i

Robert J. Bores, DRSS t

R. Martin, NRR

[

B. Clayton, EDO r

I I

L i

(d f

RI:DRP Q/,lw RI:DR h

0RS NRR g'}3 Gadzal drh1 Linvi ge nger Gallo Bogg 4

3 10//1/88 10//f/88 10p/88 10/h/88 10/d/88 10/l(/88

{

4+

l RI:DRA RI:RA l

Allan Russell 10/ /88 10/,4/38 ll0FFICIALRECORDCOPY PEACH BOTTOM SER REPORT - 0002.0.0 i

10/13/88 I

. -