List of results
- ML20203K940 + (ML20203K940)
- ML20203K942 + (ML20203K942)
- ML20203K943 + (ML20203K943)
- IR 05000424/1997012 + (ML20203K944)
- PNO-I-86-034, on 860424,plant Shut Down Due to Main Turbine Drain Line Steam Leak from Turbine Control Valve Header. Caused by Failed Weld at Socket Joint.Repairs Being Performed.Commonwealth of PA Notified + (ML20203K945)
- 05000311/LER-1986-004-02, :on 860714,reactor Tripped Due to Loss of Vital Instrument Inverter 2B.Caused by Personnel Inadvertently Repositioning AC Output Deion Switch.Personnel Counseled.W/ + (ML20203K946)
- ML20203K947 + (ML20203K947)
- 05000348/LER-1986-010, :on 860716,penetration Room Filtration Sys Started Automatically Due to Inadvertent Actuation of ESF Equipment.Caused by Inadequate Procedures.Procedures Revised + (ML20203K948)
- ML20203K950 + (ML20203K950)
- ML20203K953 + (ML20203K953)
- ML20203K954 + (ML20203K954)
- 05000255/LER-1986-021, :on 860624,technicians Discovered Power Supply to Containment Floor Water Level Instruments Deenergized, Rendering Instruments Inoperable.Caused by Inadequate Calibr Procedure.Procedure Will Be Revised + (ML20203K955)
- 05000282/LER-1986-004-01, :on 860328,actuation of Transformer Sudden Pressure Relay Resulted in Loss of Offsite Power Source & Automatic Starting of Both Safeguards Diesel Generators. Cause Undetermined.Investigation Continuing + (ML20203K956)
- ML20203K957 + (ML20203K957)
- ML20203K958 + (ML20203K958)
- ML20203K959 + (ML20203K959)
- ML20203K960 + (ML20203K960)
- ML20203K962 + (ML20203K962)
- ML20203K963 + (ML20203K963)
- ML20203K965 + (ML20203K965)
- ML20203K968 + (ML20203K968)
- ML20203K969 + (ML20203K969)
- ML20203K972 + (ML20203K972)
- JAFP-86-0633, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. No Switches Installed in safety-related Sys or Planned for Installation + (ML20203K974)
- ML20203K975 + (ML20203K975)
- ML20203K976 + (ML20203K976)
- IR 05000133/1998001 + (ML20203K978)
- ML20203K979 + (ML20203K979)
- ML20203K981 + (ML20203K981)
- ML20203K982 + (ML20203K982)
- IR 05000282/1986005 + (ML20203K984)
- IR 05000312/1986024 + (ML20203K985)
- ML20203K986 + (ML20203K986)
- IR 05000266/1998004 + (ML20203K988)
- 05000304/LER-1986-006, :on 860122,during Logic Testing,Train B Trip Breaker Opened Instead of Train A.Caused by Miswiring of Reactor Trip Switchgear During Mod.Investigation of Shunt Trip Mod Activities in Progress + (ML20203K989)
- ML20203K990 + (ML20203K990)
- W3P86-2322, NPDES Discharge Monitoring Rept for Jul 1986 + (ML20203K991)
- ML20203K993 + (ML20203K993)
- ML20203K997 + (ML20203K997)
- ML20203K998 + (ML20203K998)
- ML20203L001 + (ML20203L001)
- 05000454/LER-1986-023-03, :on 860718,discovered Installation of Defective Pressurizer Safety Valve as Result of Excessive Seat Leakage on 860717.Caused by Series of Personnel Errors.Secure Storage Cages Constructed + (ML20203L002)
- ML20203L005 + (ML20203L005)
- IR 05000397/1986011 + (ML20203L006)
- ML20203L008 + (ML20203L008)
- ML20203L010 + (ML20203L010)
- W3P86-1952, Submits Justification for Continued Operation Re NRC Concern of Installation of Class 1E Batteries & Racks,Per NRC 860813 Request.Nonconformance Work Authorization Initiated to Reduce Spacings + (ML20203L012)
- ML20203L015 + (ML20203L015)
- ML20203L016 + (ML20203L016)
- 05000364/LER-1986-009-01, :on 860717,unit Shut Down Due to Charging Pump 2B Trip.Caused by Electrical Failure of Motor While Charging Pump 2C Removed from Svc for Repair.Charging Pump Returned to Svc on 860722 + (ML20203L017)