See also: IR 05000266/1998004
Text
.
- ..
. -. -
... - . - .
. _ - - - -
- - .
- - - .. . - - . - - -
r-
N
f
i
es
.
.
1-
l
.
February 27, 1998
{
i
!
!
!
,
!
!
--
,
i
Mr. S. A. Patuiski
Site Vloe President
i
j
Point Beach Nuclear Plant
i
Wisconsin Electric f 8ower Compa'1/
!
!
!
6610 Nuclear Road
l
Two Rivers, WI 54241
'
i
. SUBJECT:
_ NRC RADIATION PROTECTION INSPECTION REPORTS 50 266/98004(DRS);
J
50 301/98004(DRS)
!
!
Dear Mr. Patuiski:
.
i
-
" On February 6,1998, the NRC completed an inspection of the rediaton protection program at
l
l
your Point Beach Nuclear Plant. The results of this inspection were discussed on that date with -
'
Mr. Cayla and other members of your stafi. The enclosed report presents the results of that
Inspection.
The purpose of the inspection was to review health physics' preparations for the Unit i rt.;ueling
l
outage, including dose goals, ALARA reviews, work planninn, radiation work permit process,
and contractor health physics technolo0 st quellfications and training, in addition, several open
i
'
j-
!!ams from previous inspections were closed or discussed.
Tne Unit i refueling outage appropriately considered health physics requirements and
' -
radiologicalimpediments associated with the outage. ALARA reviews hce complete and
offectively used historical data and lessons loamed frcm previctis outages. Contractor health
4
t
physics technologist qualifications had been reviecd and training was being provided based
-
- i
on those reviews. Our review of several radiological protection open items indicated that
effective corrective actions had been implemented; therefore, thi iteres will be clossd.
i
i-
i
l
No violations of NRC requirements were identified during the course of this intpection.
{
in accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter and its
'
- onciosures will be placed in the NRC Pub!!c Document Room (PDR).
.
't
.
.
s;J4
.
,
Ilg
.p
M.AD b E .4.66
-
,,.pntF
.
'
'
IRPPMIP.R
'
'
'
~
u.
.
<-
. .
.
1
a
..
.
_
%
'
.
.
S. Patutski
2
Februarv 27, 1998
We will gladly discuss any questions you have conceming this inspection.
_
Slocerely
)
Original Signed by Harold O. Christensen (for)
l
l
John A Grobe, Director
,
Division of Reactor Safety
Docket Nos. 50-266; 50-301
\\
F.nclosure:
Inspection Reports 50-266/08004(DRS); 50-301/9F00 NDRS)
cc w/ encl:
R. R. Grigg, President and
'
Chief Operating Officer, WEPCo
A. J. Cayle Plant Manager
B. D. Burk=, P.E., Director
Bureau of Field Operations
Cheryl L. Parrino, Chairman,
,
Wisconsin Public Service Commission
State Liaison Officer
Distribution
Docket File w/enci
Rill PRR w/enct
Rill Enf. Coordinator w/ encl
PUBLIC IE-01 w/enct
SRI, Pi leach w/ encl
TSS w/enci
LPM, NRR w/ encl
J. L. Caidwell, Rlll w/enct
DOCDESK w/encI
DRP w/enct
A. B. Beach, Rlli w/enct
IEO w/enci
DRS w/enci
,
DOCUMENT NAME: G:DRS\\ pol 98004.DRS
To receive a copy of thee document, Indicate in the bon! *C's Copy stMut aftar,vnentrencensure T e Cocy mm attacfwent' enclosure *N* e No copy
OFFICE
Rlll
6
Rlli
E Rlli
byt,
t/ Rlli
W
)J
NAME
Klambert:Jp $ 5 h GShear
(443
JMcComiich B
JGrobe FW
DATE
02////98
02/l/98
02/d/98
02/2,738
,
OFFICIAL RECORD COPY
'
'
\\
J
__
_ __ _ ______
_