ML20203L015
| ML20203L015 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/11/1986 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8608220316 | |
| Download: ML20203L015 (3) | |
Text
_
l AUG 111986 4
Docket No. 50-289 I
MEMORANDUM FOR: Harry Kister, Chief i
Projects Branch No. 1 FROM:
Allen R. Blough, Chief
?
Reactor Projects Section 1A j
SUBJECT:
TMI-1 STATUS REPORT FOR THE PERIOD AUGUST 1 - 8, 1986 1
1 Enclosed is the TMI-1 weekly status report from the NRC Resident Office at TMI-1 for the subject period.
The NRC staff continued to monitor routine plant operations at full power.
i r
TMI-1 status reports are intended to provide NRC management and the public with highlights from an NRC regulatory perspective of TMI-1 activities for the pre-I vious week.
Subsequent inspection reports will address many of these topics in more detail.
I Original Signed By:
1 Allen R. Blough, Chief Reactor Projects Section IA i
Branch 1, DRP i
Enclosure:
As stated i
i
%e2(({1fS fj{'
c j
R 0FFICIAL RECORD COPY TMIl WEEKLY STATUS REPORT -
f 11/29/80JCIE23/
s%
Harry Kister 2
cc w/ enclosure:
F. Miraglia, NRR W. Travers, NRR J. Thoma, NRR J. Partlow, IE R. Freudenberger, RI T. Gerusky, BRP/ DER, Commonwealth of Pennsylvania R. Benko, Governor's Office of Policy, Commonwealth of Pennsylvania TMI Alert Susquehanna Valley Alliance Friends & Family of TMI H. Hucker A. Herman C. Wolfe J. Johnsrud P. Smith Public Document Room Local Public Document Room bec w/ enclosure:
K. Abraha..i, RI P. Lohaus, RI R. Starostecki, RI H. Kister, R*
R. Conte, RI (20 cys)
W. Baunack, RI R. Freudenberger Region I Docket Room (w/ concurrences) h Q:
RI:DRP RI DRP P
>(.cConte Blough ster 8/i /86 8/[//86 8/ ///86 t
0FFICIAL RECORD COPY TMIl WEEKLY STATUS REPORT -
11/29/80
s O
ENCLOSURE TMI-1 STATUS REPORT FOR THE PERIOD AUGUST 1 - 8, 1986 1.
Plant Status As of 8:00 a.m. on August 8, 1986, TMI-1 was operating at 100 percent power and at normal reactor coolant temperature (579 F) and pressure (2155 psig).
2.
Facility Operations Summary At the start of the period, the plant was operating at 100 percent power and continued to operate at 100 percent during the reporting period. No significant operational problems were identified during the report period.
During this period, the following significant surveillances were completed:
Channel C reactor protection system calibration / check and the quarterly surveillance test on make-up pumps IA, IB, and IC.
3.
NRC Staff Activities During the Period During this report period work week, the NRC staff on site consisted of three resident inspectors and three region-based inspectors. The region-based inspectors were performing routine reviews of the licensee's radia-tion protection and maintenance programs.
The NRC staff at TMI-1 was comprised of the following personnel during the period:
R. Blough, Chief, Reactor Projects Section IA C. Hix, Secretary A. Finkel, Reactor Engineer D. Johnson, Resident Inspector J. Rogers, Resident Inspector T. Tuccinardi, Radiation Specialist A. Weadock, Radiation Specialist F. Young, Resident Inspector 0FFICIAL RECORD COPY TMIl WEEKLY STATUS REPORT -
11/29/80