ML20203K960

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 86-002, Static O-Ring (Sor) Differential Pressure Switches. No Sor Model 102 or 103 Differential Pressure Switches Installed or Planned for Installation
ML20203K960
Person / Time
Site: Ginna 
Issue date: 07/28/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-86-002, IEB-86-2, NUDOCS 8608220285
Download: ML20203K960 (1)


Text

.

v R

\\ y}

w..

,,.a ROCHESTER GAS AND Et:CTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGEH W H ODE' R 11 T tC,

E' W Fw'>DutrtON auta ter s 5

-2703 July 28, 1986 Dr. Thomas E. Murley, Regional Administrator U.S.

Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

IE Bulletin 86-02 Static "O" Ring Differential Pressure Switches R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Murley:

Pursuant to your request stipulated in IE Bulletin 86-02, Static "O" Ring Differential Pressure Switches, an investigation was conducted on the extent to which SOR model 102 or 103 differential pressure switches are installed (or planned) as electrical equipment important to safety.

The results of this investigation revealed that this model switch is not installed in the plant.

In addition, there are no future modification or procurement plans to install any of the above mentioned switches in the plant.

Subsequent actions required of licensees that have SOR model 102 or 103 differential pressure switches are therefore not applicable to our facility.

Vr truly yours,

$DR060n,,SbS$ 'f}'

P D' Ro W.

Kober Subscribed and sworn to me on this _28t day of uly 1986.%

j$

yg MONROE COUNTY e hA 2/i//-

C..nm.on Empm Nov. 30, t9M V /

xc: USNRC, Document Control Desk 7

r Washington, DC 20555 O

. -