Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G849 + (ML20203G849)
- ML20203G850 + (ML20203G850)
- ML20203G851 + (ML20203G851)
- ML20203G853 + (ML20203G853)
- ML20203G854 + (ML20203G854)
- ML20203G855 + (ML20203G855)
- ML20203G858 + (ML20203G858)
- ML20203G859 + (ML20203G859)
- ML20203G862 + (ML20203G862)
- ML20203G863 + (ML20203G863)
- ML20203G864 + (ML20203G864)
- ML20203G867 + (ML20203G867)
- ML20203G869 + (ML20203G869)
- 05000354/LER-1986-031, :on 860629,reactor Scram Occurred as Result of Upscale Trip on intermediate-range Monitor D.Caused by Personnel Error.Operator Counseled + (ML20203G873)
- ML20203G876 + (ML20203G876)
- ML20203G877 + (ML20203G877)
- ML20203G879 + (ML20203G879)
- 05000482/LER-1986-016, :on 860327,control Room Ventilation Isolation, Containment Purge Isolation & Fuel Bldg Isolation Signals Occurred.Caused by 15-volt Power Supply Malfunction.Root Cause Under Investigation + (ML20203G880)
- ML20203G882 + (ML20203G882)
- LIC-98-0024, Forwards Nuclear Matl Transaction Rept (Doe/Nrc Form 741) as Required by 10CFR74.15(a) + (ML20203G883)
- ML20203G884 + (ML20203G884)
- ST-HL-AE-1691, Revised Final Deficiency Rept Re Potential Failure of Nonseismic Component Cooling Water Tank Level & Flow Switches During Earthquake.Initially Reported on 850207. Surge Tank Level Switches Provided for Protection + (ML20203G890)
- ML20203G891 + (ML20203G891)
- PNO-III-94-090, on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 931225 + (ML20203G892)
- ML20203G894 + (ML20203G894)
- ML20203G896 + (ML20203G896)
- ML20203G901 + (ML20203G901)
- ML20203G902 + (ML20203G902)
- ML20203G904 + (ML20203G904)
- ML20203G908 + (ML20203G908)
- TXX-4767, Interim Deficiency Rept CP-86-16 Re Possible Detrimental Fire Effects on Instrument Tubing.Initially Reported on 860321.Efforts Underway to Specify Complete Program of Corrective Action.Next Rept Will Be Submitted by 860606 + (ML20203G909)
- ML20203G911 + (ML20203G911)
- ML20203G912 + (ML20203G912)
- ML20203G913 + (ML20203G913)
- PNO-III-94-086, on 941103,near End of Operability Test for 2B Emergency Diesel Generator Master Rod in Diesel Failed Resulting in Significant Internal Damage to 1L & 1R Cylinders + (ML20203G914)
- ML20203G916 + (ML20203G916)
- ML20203G917 + (ML20203G917)
- IR 05000382/1997024 + (ML20203G918)
- ML20203G920 + (ML20203G920)
- ML20203G921 + (ML20203G921)
- PNO-III-94-039, on 940517,two Persons,Russian Visitor & Interpreter Were Killed in Traffic Accident Near Charlevoix,Mi.Cause of Accident Under Investigation + (ML20203G923)
- ML20203G925 + (ML20203G925)
- ML20203G929 + (ML20203G929)
- ML20203G931 + (ML20203G931)
- ML20203G934 + (ML20203G934)
- ML20203G941 + (ML20203G941)
- ML20203G942 + (ML20203G942)
- ML20203G944 + (ML20203G944)
- ML20203G945 + (ML20203G945)
- PNO-III-94-013, on 940308,contract Worker Was Injured When He Fell Into Blowdown Demineralizer Vault.Worker Was Transported in Ambulance to Area Hosp in Serious Condition + (ML20203G946)
- ML20203G947 + (ML20203G947)