ML20203G916

From kanterella
Jump to navigation Jump to search
FOIA Request for Info Re Insp Conducted During 850826-29 of Util Policies,Procedures & Implementation of Comanche Peak Site Ombudsman & Safeteam Programs
ML20203G916
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/03/1986
From: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-86-132 NUDOCS 8604290387
Download: ML20203G916 (2)


Text

.

GOVERNMENT ACCOUNTABluTY PROJECT i'

1555 Connecncut Awnue, N.W Suite 202 Washington. D.C. 20036 (202)232 8550 March 3, 1986 FREEDOM OF INFORMATION ACT REQUEST Director FREEDOM Of INFORMA110N Office of Administration ACT REQUEST I

Nuclear Regulatory Commission S y j./ 4, /d 2 Washington, D.C.

20555 h8-7 Yb To Whom It May Concern:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

552, the Government Accountability Project (GAP) requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, egreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, computer runoffe, any other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with an inspection conducted during the period August 26-29, 1985, regarding TUEC's policies, procedures and implementation of the Comancho Peak site Ombudsman and SAFETEAM programs.

This information should include Inspection Report 85-12 and 85-08 and any and all records generated in connection with a November 5, 1985 discussion of the inspection findings.

This request includes all agency records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8, 1980) whether they currently exist in the NRC official, " working", investigative or other files, or at any other location, including private residences.

If any records as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are dentroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).

B604290387 8'60303 PDR FOIA GRADE 86-132 PDR

GAP requests that fees be waived, because " finding the information can be considered as primarily benefitting the general public," 5 U.S.C. 552 (a) (4) (a).

GAP is a non-profit, non-partisan public interest organization concerned with honest

~

and open government.

Through public outreach, the Project promotes whistleblowers as agents of goverament accountability.

Through its Environmental Whistleblower Clinic, GAP offers assis-tance to local public interest and citizens groups seeking to ensure the health and safety of their communities.

The Environ-mental Whistleblower Clinic is currently assisting several citizens groups, local governments and intervenors in Texas concerning the construction of the Comanche Peak nuclear power plant.

We are requesting the above information as part of an ongoing monitoring project on the adequacy of Region IV and the NRC's efforts to protect public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld.

The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld.

This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).

We look forward to your response to this request within ten working days.

3 Sincerely, Y

lU C*c.A. r Billie Pirner Garde Director, Environmental Whistleblower Clinic *

.