Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/98-22 & 50-362/98-22.Implementation of Corrective Actions Will Be Reviewed During Future Insp
ML20203G925
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/12/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
50-361-98-22, 50-362-98-22, NUDOCS 9902220106
Download: ML20203G925 (5)


See also: IR 05000361/1998022

Text

    1. '%

UNITED STATE 3

,

p

j

NUCLEAR RECULATORY COMMISSION

i

,

5

f

REGloN IV

l

[

611 RYAN PLAZA DRIVE, SUITE 400

I

ARUNGToN, texas 76011-8064

y,p

February 12, 1999

l

' Harold B. Ray, Executive Vice President

Southern California Edison Co.

San Onofre Nuclear Generating Station

i

P.O. Box 128

i

San Clemente, California 92674-0128

SUBJECT:

NRC INSPECTION REPORT 50-361/98-22; 50-362/98-22 AND NOTICE OF

VIOLATION

Dear Mr. Ray:

Thank you for your letter of January 26,1999, which clarified details related to corrective

actions taken by you in response to two violations discussed in the report. We will review the

implementation of your corrective actions during a future inspection to determine that full

compliance has been achieved and will be maintained.

Sin erely,

Gail M. Good, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-361

50-362

License Nos.: NPF-10

NPF-15

cc:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

\\

,1

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000

l

Orange, California 92868-4720

9902220106 990212

PDR

ADOCK 05000361

0

PDR

._

_.

_

_

. _ - _

_

_

_

_ . .

__

_

,

-

,

.e

Southern California Edison Co.

-2-

,

,

l

Sherwin Harris, Resource Project Manager

Public Utilities Department

i

Cityof Riverside

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

Stephen A. Woods, Senior Health Physicist

Division of Drinking Water and

Environmental Management

Nuclear Emergency Response Program

Califomia Department of Health Services

P.O. Box 942732, M/S 396

Sacramento, California 94334-7320

Mr. Michael R. Olson

Sr. Energy Administrator

San Diego Gas & Electric Company

P. O. Box 1831

San Diego, California 92112-4150

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento, California 94234

Mayor

City of San Clemente

100 Avenida Presidio

,

San Clemente, California 92672

'

l

Mr. Truman Bums \\Mr. Robert Kinosian

Califomia Public Utilities Commission

505 Van Ness, Rm. 4102

{

San Francisco, California 94102

'

i

,

..

1

.

.

Southern California Edison Co.

-3-

DISTRIBUTION w/coov of licensee's letter dated January 26.19991

DCD (IE06)

Regional Administrator

SONG Resident inspector

DRP Director

DRS-PSB

!

DRS Director

Branch Chief (DRP/E)

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

MIS System

RIV File

l

i

.

DOCUMENT NAME: R:\\_SO23\\SO822AK.LTR

To receive copy of document, Indicete lh %x: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

!

RIV:PSB

E

C:DRS\\PSB

M

[

  • LTRicketson:nh

GMGood (-r% k<

02/ /99

0247/99

'

  • Previously concurred.

OFFICIAL RECORD COPY

!

l

I

l

--

-

__

.

Southern California Edison Co.

-3-

DISTRIBUTION w/coov of licensee's letter dated January 26.1999:

i

DCD (IE06)

Regional Administrator

SONG Resident inspector

DRP Director

I

DRS-PSB

DRS Director

Branch Chief (DRP/E)

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

MIS System

RIV File

i

DOCUMENT NAME: R:\\_SO23\\SO822AK.LTR

j

To receive copy of document, Indicate in tm *C" = Copy without enclosures *E" = Copy with enclosures 'N" = No copy

'

RIV:PSB

E

AC:DRSTSB)

D:DRS

LTRicketson:nhR# JBNicholks)1 /ATHowell111

02/g/99

02 8/99

[7

02/ /99

'~

OFFICIAL RECORD COPY

l

!

!

/

,

'

. SottittRN CALIFOIMA

A. Edw:rd Scherer ,

,

EDISON

ttC,grr.i,,

.

4n IJWSO\\ f \\ TI.ll\\ lllOS 4f. * Compm

9

{4 $ @ @ IJ 7/ @

January 26,1999

,

FB - 21999 b

L., 3

-

'

'

U. S. Nuclear Regulatory Commission

REGIONIV

l

Document Control Desk

Washington, D.C. 20555

'

Gentlemen:

.

Subject:

Docket Nos. 50-361 and 50-362

Reply to a Notice of Violation

San Onofre Nuclear Generating Station, Units 2 and 3

Reference: Letter, Mr. Arthur T. Howell (USNRC) to Mr. Harold B. Ray

(SCE), dated January 7,1999

The referenced Inspection Report and Notice of Violation cover letter indicates "... you

are not required to respond to this letter unless the description therein does not

accurately reflect your corrective actions or your position." Southern Califomia Edison

(SCE) has reviewed the Inspection Report and while the report does accurately reflect

SCE's position relative tu the violations themselves, SCE would like to clarify two of the

corrective actions associated with the first violation mentioned in the inspection Report

(Violation 50-361/9822-01).

The first violation occurred during the week of the inspection, and involved the

detachment of a high radiation area sign and rope barrier for a short period of time. As

a part of the corrective actions which were developed prior to the inspector leaving the

site, a standown of appropriate contract workers was to be conducted and an article

discussing the occurrence was to be placed in the site news letter.

Relative to the standown, during discussions with the inspector the impression was

given that all contractors would participate in the standown and that the Maintenance

Manager, Construction Manager, and the Radiation Protection Manager would discuss

the occurrence and the importance of complying with radiation protection work

requirements. The inspection report reflects this and it further states that the standown

was conducted on December 15,1998.

-

P.O.Ib\\l28

San Ckmente. CA 92674-0128

949 368 7501

Fa\\ 949 ib8 7575

- O b I3

W/B*

ipp!

_

_

_

.__

.

.

._

__

'

.

,

.

~

Document Control Desk

-2-

January 26,1999

The standown was implemented as follows:

The SONGS Maintenance Manager, Construction Manager, and the

-

Radiation Protection Manager met with Bechtel Construction Company

(BCC) non-manual field engineers, superintendents, general foremen and

foremen, and conducted " stand-down training" on December 15,1998.

On December 15,1998, standowns of approximately 300 BCC craft, BCC

.

non-manual and nuclear construction non-manual personnel who are

involved in field activities were conducted by the above trained personnel.

The importance of maintaining radiological barriers and complying with radiation

protection work requirements was reiterated in a January 1,1999, Health Physics

Bulletin to RCA Personnel as well as a January 11,1999, site news letter article. As

discussed in the inspection Report, SCE is conducting a review of radiation worker

practices and root cause analysis of associated problems (referred to as an Event

Trend Report (ETR)). The ETR is currently scheduled for completion by the end of

February,1999. Additional corrective actions may be taken if deemed appropriate.

Relative to the news letter article, the information given to the inspector and reflected in

the inspection Report was that the article would appear in the January 4,1999, edition.

The article appeared in the January 11,1999, news letter rather than the January 4,

.

1999 edition.

SCE does not believe that these clarifications change the characterization of the

violations.

If you have any questions, please contact us.

Sincerely,

'&

cc:

E. W. Merschoff, Regional Administrator, NRC Region IV

L. J. Smith, Acting Chief, Branch E Division of Reactor Projects

J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 and 3

J. W. Clifford, NRC Project Manager, San Onofre Units 2 and 3

e

J

l .

Southern California Edison Co.

-3-

DISTRIBUTION w/coov of licensee's letter dated January 26.1999:

DCD (IE06)

Regional Administrator

SONG Resident inspector

DRP Director

DRS-PSB

DRS Director

)

Branch Chief (DRP/E)

l

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

i

MIS System

RIV File

i

i

!

DOCUMENT NAME: R:\\_SO23\\SO822AK.LTR

To receive copy of document, Indicate in box: 'C" = Copy without enclocures *E" = Copy with enclosures *N" = No copy

RIV:PSB

lE

C:DRS\\PSB lN

l

l

l

  • LTRicketson:nh

GMGood (#(f

02/ /99

0247/99

l

'Previously concurred.

OFFICIAL RECORD COPY

,

220020