- ML20203G271 + (ML20203G271)
- ML20203G272 + (ML20203G272)
- ML20203G273 + (ML20203G273)
- ML20203G274 + (ML20203G274)
- ML20203G277 + (ML20203G277)
- ML20203G278 + (ML20203G278)
- ML20203G280 + (ML20203G280)
- PNO-III-92-043, on 920827,while Unit 2 Reducing Power to 800 Mw,Turbine Tripped Due to Thrust Bearing Wear Detector Signal.Several Equipment Problems Occurred Following Scram. Operators Successfully Established Steam Flow to Condenser + (ML20203G281)
- ML20203G282 + (ML20203G282)
- ML20203G287 + (ML20203G287)
- PNO-III-93-051, on 930901,licensee Shut Unit 2 Down to Repair body-to-bonnet Leak in Feedwater Check Valve Which Makes Up Part of Containment Isolation Boundary.Leak Was Reduced to Weep by Tightening Bonnet Studs + (ML20203G290)
- ML20203G291 + (ML20203G291)
- ML20203G294 + (ML20203G294)
- ML20203G295 + (ML20203G295)
- BSEP-98-0044, Forwards Index of Supporting Documentation Being Provided to NRC Re Maint Rule Baseline Team Insp Scheduled for 980316- 20 + (ML20203G300)
- ML20203G301 + (ML20203G301)
- PNO-III-92-035, on 920622,augmented Inspection Team Will Begin Special Inspection to Review Circumstances Surrounding Movement of Fuel Element While Reactor Critical at Low Power.Incident Occurred 920608 + (ML20203G303)
- ML20203G304 + (ML20203G304)
- ML20203G305 + (ML20203G305)
- ML20203G306 + (ML20203G306)
- ML20203G311 + (ML20203G311)
- ML20203G312 + (ML20203G312)
- ML20203G314 + (ML20203G314)
- ML20203G316 + (ML20203G316)
- ML20203G318 + (ML20203G318)
- ML20203G320 + (ML20203G320)
- ML20203G323 + (ML20203G323)
- ML20203G324 + (ML20203G324)
- ML20203G325 + (ML20203G325)
- ML20203G329 + (ML20203G329)
- ML20203G332 + (ML20203G332)
- PNO-II-93-075, on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side + (ML20203G333)
- ML20203G336 + (ML20203G336)
- PNO-III-93-050, on 930901,power Supply to Plant Security Sys Failed,Causing Smoke to Fill Battery & Inverter Room. Power Was Restored to Security Sys from Alternate Power Source + (ML20203G337)
- ML20203G338 + (ML20203G338)
- PNO-III-93-018, on 930326,licensee Reported That Licensed Senior Reactor Operator Tested Positive for Alcohol During Routine Medical Exam.Individual Not Performing NRC-licensed Duties at Time of Incident,At Site Only for Medical Exam + (ML20203G342)
- ML20203G344 + (ML20203G344)
- ML20203G346 + (ML20203G346)
- ML20203G348 + (ML20203G348)
- ML20203G349 + (ML20203G349)
- IA-97-449, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20203G351)
- ML20203G351 + (ML20203G351)
- ML20203G354 + (ML20203G354)
- ML20203G357 + (ML20203G357)
- PNO-III-93-020A, on 930403,Region III Completed Review of Licensee Response to P-32 Contamination Incident Which Resulted in off-site Contamination.Findings Indicate on Morning of 930321,individual Contaminated Hands + (ML20203G358)
- 05000461/LER-1998-002, :on 980123,loss of Svc & Instrument Air Occurred Due to Trip of Operating Air Compressor.Caused by Inadequate Design in Control of Cooling Water Supply to Compressors Lube Oil Coolers.Will Modify Components + (ML20203G360)
- PNO-III-93-026, on 930420,Region III Was Informed by Idns That Investigation Re Possible Theft & Dumping of Spent Mo-99/Tc-99m Generators in Two Southern Illinois Counties Was Underway + (ML20203G362)
- ML20203G363 + (ML20203G363)
- PNO-III-93-046, on 930715,INDS Received Call from Licensee Re Event Which Occurred Earlier That Morning at Oil Refinery of Apparent Overexposure to Radiographer Extremity + (ML20203G364)
- ML20203G365 + (ML20203G365)
- IR 05000354/1997007 + (ML20203G367)