Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000269/1985039 + (ML20203C539)
- ML20203C540 + (ML20203C540)
- ML20203C541 + (ML20203C541)
- ML20203C546 + (ML20203C546)
- ML20203C547 + (ML20203C547)
- ML20203C548 + (ML20203C548)
- ML20203C550 + (ML20203C550)
- ML20203C551 + (ML20203C551)
- U-602881, Monthly Operating Rept for Nov 1997 for Clinton Power Station,Unit 1 + (ML20203C554)
- ML20203C555 + (ML20203C555)
- ML20203C556 + (ML20203C556)
- ML20203C560 + (ML20203C560)
- PNO-III-91-033, on 970724,State of Mi Was Removed from Membership in Midwest Low-Level Radwaste Compact at Special Meeting in Detroit.Compact Commission Designated Ohio as New Host State W/Minnesota as Alternate Location + (ML20203C561)
- ML20203C562 + (ML20203C562)
- ML20203C563 + (ML20203C563)
- ML20203C566 + (ML20203C566)
- ML20203C572 + (ML20203C572)
- ML20203C573 + (ML20203C573)
- PNO-V-86-042, on 860712,reactor Tripped from 100% Power on Low Steam Generator RCS Flow Channels a & B,Causing Turbine Generator Trip,Sys Voltage Fluctuation & Loss of Power.Cause Unknown.Plant Restored to Safe Shutdown Status + (ML20203C576)
- ML20203C577 + (ML20203C577)
- ML20203C578 + (ML20203C578)
- ML20203C583 + (ML20203C583)
- ML20203C584 + (ML20203C584)
- HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC + (ML20203C585)
- ML20203C590 + (ML20203C590)
- ML20203C592 + (ML20203C592)
- IR 05000213/1986005 + (ML20203C624)
- ML20203C700 + (ML20203C700)
- ML20203C701 + (ML20203C701)
- ML20203C696 + (ML20203C696)
- ML20203C693 + (ML20203C693)
- ML20203C689 + (ML20203C689)
- ML20203C679 + (ML20203C679)
- PNO-V-86-016, on 860407,State of Wa Informed Region That One Drum in 860403 Radwaste Shipment from Facility Had Hole in Side.Util Barred from Use of Burial Site.Burial Permit 2280 Suspended Effective on 860404 + (ML20203C671)
- 05000353/LER-1997-010, Forwards LER 97-010-00,which Describes Condition Prohibited by TS in That Reflex Wire Specimen from Unit 2 Was Not Examined to Determine RPV Fluence IAW TS Surveillance Requirement 4.4.6.1.4 + (ML20203C668)
- ML20203C661 + (ML20203C661)
- ML20203C657 + (ML20203C657)
- ML20203C656 + (ML20203C656)
- ML20203C654 + (ML20203C654)
- PNO-I-91-074, on 911030,radioactive Matl Spill Involved Tritium H-3.Licensee Continues to Perform Bioassays (Urinalysis) of Potentially Exposed Individuals.Currently Evaluating Results of bioassays.H-3 Intake Was Minimal + (ML20203C652)
- ML20203C649 + (ML20203C649)
- ML20203C647 + (ML20203C647)
- PNO-V-91-031, on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed + (ML20203C634)
- ML20203C637 + (ML20203C637)
- ML20203C631 + (ML20203C631)
- PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter + (ML20203C622)
- PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core + (ML20203C614)
- ML20203C620 + (ML20203C620)
- ML20203C611 + (ML20203C611)
- ML20203C609 + (ML20203C609)
- ML20203C607 + (ML20203C607)