Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199H420 + (ML20199H420)
- 05000424/LER-1997-010-01, :on 971019,manual RT During CR Drop Time Testing Was Noted.Caused by Failed Detector/Encoder Card in Dpri B Data Cabinet.Crs Were Withdrawn,Selecting Data a Only W/No Valid Rod Deviations Indicated + (ML20199H423)
- ML20199H424 + (ML20199H424)
- ML20199H425 + (ML20199H425)
- ML20199H426 + (ML20199H426)
- ML20199H428 + (ML20199H428)
- ML20199H429 + (ML20199H429)
- ML20199H430 + (ML20199H430)
- 05000313/LER-1997-004-04, :on 971021,two Remotely Operated Reactor Bldg Isolation Valves Were Not Tested as Required.Caused by Misinterpretation of TS Surveillance requirements.SV-1440 & SV-1443 Were Successfully Stroke Tested + (ML20199H432)
- ML20199H433 + (ML20199H433)
- ML20199H434 + (ML20199H434)
- A97067, Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite Svc + (ML20199H436)
- ML20199H439 + (ML20199H439)
- ML20199H440 + (ML20199H440)
- ML20199H442 + (ML20199H442)
- 05000313/LER-1997-005-04, :on 971022,surveillance Testing Did Not Verify That Valve Would Close Upon Receiving Es Signal.Caused by Deficiency in Development of Original Tp.Testing W/Special Work Plan Verified CV-3643 Was Operable + (ML20199H443)
- ML20199H445 + (ML20199H445)
- IR 05000482/1997020 + (ML20199H446)
- ML20199H448 + (ML20199H448)
- ML20199H450 + (ML20199H450)
- ML20199H451 + (ML20199H451)
- ML20199H452 + (ML20199H452)
- ML20199H453 + (ML20199H453)
- ML20199H456 + (ML20199H456)
- A97071, Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRC + (ML20199H457)
- ML20199H459 + (ML20199H459)
- ML20199H460 + (ML20199H460)
- ML20199H462 + (ML20199H462)
- ML20199H464 + (ML20199H464)
- ML20199H466 + (ML20199H466)
- ML20199H467 + (ML20199H467)
- ML20199H469 + (ML20199H469)
- ML20199H471 + (ML20199H471)
- IR 05000458/1998002 + (ML20199H473)
- NOC-AE-000402, Forwards 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports + (ML20199H474)
- ML20199H476 + (ML20199H476)
- ML20199H478 + (ML20199H478)
- IR 05000482/1998020 + (ML20199H481)
- ML20199H483 + (ML20199H483)
- ML20199H486 + (ML20199H486)
- ML20199H490 + (ML20199H490)
- ML20199H493 + (ML20199H493)
- IR 05000361/1997023 + (ML20199H494)
- ML20199H496 + (ML20199H496)
- ML20199H498 + (ML20199H498)
- ML20199H500 + (ML20199H500)
- ML20199H503 + (ML20199H503)
- ML20199H504 + (ML20199H504)
- ML20199H505 + (ML20199H505)
- ML20199H506 + (ML20199H506)
- ML20199H516 + (ML20199H516)