ML20199H434
Text
0, GAR 13 E5
~
MEMORANDUM FOR:
V. S. Noonan, Director Comanche Peak Project FROM:
L. C. Shao, Group Leader, Civil / Mechanical Groups Comanche Peak Technical Review Team
SUBJECT:
CASE'S REQUEST FOR ADMISSIONS The Civil / Structural staff has reviewed the subject CASE's request with emphasis in assuring correctness and consistency with respect to the stated positions in SSER No. 8.
Our specific recommendations for admissions 14 through 17 are provided in the enclosure.
If you have questions regarding the above, please contact D. Jeng of TRT at 443-7974.
s W
L. C. Shao, Group Leader Civil / Mechanical Groups Comanche Peak Technical Review Team
Enclosure:
As stated cc:
C. Haughney R. C. Tang J. Scinto G. Mizuno S. Treby D. Jeng T. Langowski DISTRIBUTION:
R. Minogue D. Ross e607030311 e60623 G$DE ott A-le PDR F eh f
~
T. Langowski D.
g L.JShab
( g["-
~
3/O / 85 3/Itj85 3/ /85 g
9 22-9
\\
j 7
I BAk 131985 Enclosure Civil / Structural Staff's Respone to CASE's Specific Admission Request Item 14. Admit with the following clarification:
Gibbs & Hill engineering was informed of the omission by Brown & Root Nonconformance Report C-669, which is referenced in the Brown & Root internal deficiency report CP-77-6.
A portion of the omitted reinforcing steel was placed in the next concrete lift above the 819-foot 1/2-inch level.
See SSER No. 6, page K-52, item e.(1) and page K-55.
Item 15. Admit as clarified in SSER No. 11 on page K-77.
Item 16. Admit as clarified in SSER No. 11 on page K-77.
Item 17. Admit as clarified in SSER No. 14 on pages K-84 and 85.