Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F441 + (ML20199F441)
- ML20199F442 + (ML20199F442)
- ML20199F444 + (ML20199F444)
- IR 05000285/1985029 + (ML20199F445)
- W3P86-2153, Advises That No Generic Tech Spec Will Be Developed for Auxiliary Pressurizer Spray.No Safety Significance Exists & Spray Does Not Meet NRC Criteria for Sys Required for Inclusion in Tech Specs + (ML20199F446)
- 3F0198-41, Forwards Vols 1-4,Rev 24 to FSAR for Crystal River Unit 3. Rev Provided as Complete Reissue of FSAR & Pages Marked as Rev 24,dtd 980126.Summary of Changes Made in Fsar,Rev 24 Provided in Attachment A.Rept Will Be Provided by 980213 + (ML20199F447)
- IR 05000354/1986026 + (ML20199F450)
- ML20199F451 + (ML20199F451)
- ML20199F452 + (ML20199F452)
- ML20199F453 + (ML20199F453)
- ML20199F455 + (ML20199F455)
- ML20199F456 + (ML20199F456)
- ML20199F457 + (ML20199F457)
- ML20199F459 + (ML20199F459)
- ML20199F460 + (ML20199F460)
- U-600614, Forwards NFPA Code Conformance Evaluation Rept for Clinton Power Station + (ML20199F463)
- ML20199F464 + (ML20199F464)
- IR 05000346/1997015 + (ML20199F466)
- ML20199F468 + (ML20199F468)
- ML20199F470 + (ML20199F470)
- 05000255/LER-1986-018, :on 860519,automatic Reactor Trip Occurred Due to High Pressurizer Pressure.Caused by Power Supply Failure in Turbine electro-hydraulic Control Sys Due to Ac Line Noise.Wiring Rerouted.Power Supply Shielded + (ML20199F471)
- ML20199F472 + (ML20199F472)
- ML20199F473 + (ML20199F473)
- ML20199F476 + (ML20199F476)
- ML20199F477 + (ML20199F477)
- ML20199F478 + (ML20199F478)
- ML20199F479 + (ML20199F479)
- ML20199F480 + (ML20199F480)
- ML20199F481 + (ML20199F481)
- ML20199F482 + (ML20199F482)
- ML20199F483 + (ML20199F483)
- 05000286/LER-1986-003-01, :on 860519,high Water Level in Steam Generator 34 Resulted in Turbine & Reactor Trips.Caused by Check Valve BFD-1-32 Failure to Reverse Flow Due to Loose Pivot Pins. Disk Pivot Pins Anchored Properly + (ML20199F485)
- ML20199F486 + (ML20199F486)
- ML20199F488 + (ML20199F488)
- ML20199F489 + (ML20199F489)
- ML20199F490 + (ML20199F490)
- ML20199F491 + (ML20199F491)
- ML20199F492 + (ML20199F492)
- IR 05000266/1997021 + (ML20199F493)
- ML20199F494 + (ML20199F494)
- ML20199F495 + (ML20199F495)
- ML20199F496 + (ML20199F496)
- ML20199F497 + (ML20199F497)
- ML20199F498 + (ML20199F498)
- IR 07100101/2012018 + (ML20199F500)
- ML20199F502 + (ML20199F502)
- ML20199F503 + (ML20199F503)
- ML20199F504 + (ML20199F504)
- ML20199F506 + (ML20199F506)
- ML20199F508 + (ML20199F508)
- BECO-86-055, Station,Environ Radiation Monitoring Program Rept 18,1985 + (ML20199F509)