Text
_ - _ - - _ - _ _ _ _ _ - _ _ _ - _ _ - _ _ - _ _
1
Sn na
UNITED STATES
g
NUCLEAR RE!ULATORY COMMISSION
f
REGION lil
n
0
801 WARRENVILLE ROAD
E
f
LISLE. ILLINOIS 60532-4351
\\oo..++
January 23, 1998
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West lli
1400 Opus Place, suite 500
Downers Grove,IL 60515
SUBJECT:
NOTICE OF VIOLATION AND NRC INSPECTION REPORT
NO. 50-373/97020(DRP); 50-374/97020(DRP)
Dear Mr. Kingsley:
On December 18,1997, the NRC completed an inspection at your LaSalle County facility. The
enclosed report presents the results of that inspection.
During this six-week inspection period, your overall performance was generally acceptable. We
noted a continued positive focus of plant staff on identifying surveillance test problems.
However, your staff failed to follow procedures in several instances.
(
Based on the results of this inspection, the NRC has determined that violations of NRC
requirements occurred. The first violation consisted of two examples of failure to follow
procedures involving the control of operability evaluations and the preparation of a work package
for an emergency diesel generator. The second violation concemed a failure to take adequate
corrective actions to preclude recurrence of loose test valves on emergency diesel generator
cylinders. The third violation involved a failure to follow procedure by not posting a contaminated
area. The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are dmribed in detail in the enclosed inspection report.
The violation examples involving your staff's failures to follow procedures stem from human
performance wcaknesses, primarily a lack of questioning attitude and thoroughness in
performing work. Considerable effort has been expended by your staff to address human
performance at LaSalle County Station. Although the significance of personnel errors has
docreased over the past several months, the problems in this area indicate the importance of
your continued focus on human performance improvement initiatives.
You are required to respond to this letter, and should follow the instructions specified in the
/
enclosed Notice when preparir,g your response. The NRC will use your response, in part, to
/
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
040028
jlliIl M!ll!IIl!lll
,.
9802040022 980123
ADOCK 05000373
G
~
,: 9 0 c F
q
g[f-g:y
_ _ _ _ _ _ _ _ _ _ .
.
_ -
-
..
. _ _ _ .
-
. _ _ _ . _ . .
-
.
_-
-
'.
.
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
C,Um 9. d'
f
(
b 1
. Geffrey E. GrMt Director
Division of Reactor Projects
,
Docket Nos: " 373; 50-374
License Nos: o *F-11; NPF-18
Enclosures:
1.
2.
Inspection Report
No. 50-373/97020(DRP);
50-374/97020(DRP)
cc w/ enc s:
M. Wallace, Nuclear Services
Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
,
I. Johnson, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
'
T. O'Connor, Station Manager
P. Bames, Regulatory Assurance
Supervisor
Richard Hubbard
Nathan Schloss, Economist
1
Office of the Attomey General
State Liaison Officer
Chairman, Illinois Commerce
'
Commission
_- -_ -_____ __ _
.
. - -
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter, its
. enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
./s Geoffrey E. Grant
Geoffrey E. Grant, Director -
..
.
Division of Reactor Projects -
Docket Nos: 50 373;50 374
Enclosures:
1.-
m
2.
Inspection Report
No. 50-373/97020(DRP);
50-374/97020(DRP)
cc w/encis:
M. Wallace, Nuclear Services
l
Senior Vice President
'
G.- Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
I. Johnson, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager -
P. Bames, Regulatory Assurance -
Supervisor
Richard Hubbard -
Nathan Schloss, Economist
Office of the Attomey General
State Liaison Officer
Chairman, Illinois Commerce Commission
Distribution:
Docket File w/encls
DRP w/encls -
Rill Enf. Coord. w/encis -
PUBLIC IE-01 w/encls
TSS w/encls
SRI LaSalle w/encls
A. Beach w/encls -
DRS (2) w/encls
Project Mgr., NRR w/encls
- Deputy RA w/encis
Rlli PRR w/encls
RAC1 (E-Mail)
CAA1 (E-Mail)
DOCDESK (E Mal,,
- DOCUMENT NAME: G:\\LASA\\LAS97020.DRP
v.
i. . . , ., as. m
h s
w, in. n.. c - c ,
n.
hi i r
c , ein .ei mi
n - m. ..,,
,_ OFFICE
Rill D .
6-
Rlli
NAME
O
o
Grant b'
DATE
01hu/98
01469
OFFICIAL RECORD CODY
, .
.
.
.
..
.