ML20199F490

From kanterella
Jump to navigation Jump to search
Revised Pages of Environ Monitoring Rept for 1985
ML20199F490
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/31/1985
From: Elizabeth Wilson
ARKANSAS, STATE OF
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8606240345
Download: ML20199F490 (7)


Text

_ _ _ _ _ _ _ . _ __ -. - __

ARKANSAS NUCLEAR ONE January through December, 1985 a

i f

Sample Pathway or Medium: Surface Water, split Location: Big Piney Creek (Control) l Distance and Direction: 6.1 miles, 290o Frequency: Monthly Type of Analysis: Gamma Isotopic Results (oCi/1)

Sample Date State Licensee Jan 23 Except as noted All samples Feb 25 below, all samples below LLD Mar 20 below LLD Apr 2 May 6 Jun 3 Jul 8 Aug 5 Cs-137: 6.1 + 2.5 Sep 3 Oct 9 Nov 6 Dec 4 Type of Analysis: Tritium Frequency: Quarterly Composite Results (o Ci ,'1,1 Quarter State Licensee Jan - Mar Below LLD All samples Apr - Jun Below LLD below.LLD Jul - Sep Below LLD Oct - Dec Below LLD 8606240345 851231 PDR ADOCK 05000313 R PDR Page 2

ARKANSAS NUCLEAR ONE January through December, 1985 Sample Pathway or Medium: Airborne Particulate, Duplicate Location: Danville (control)

Distance and Direction: 21 miles, 205o Frequency: Monthly composite Type of Analysis: Gamma Isotopic Results (oCi/m3)

Sample Date State Licensee Jan All samples All samples Feb below LLD below LLD Mar Apr May Jun Jul Aug Sep Oct Nov Dec ll I

Page 6

ARKANSAS NUCLEAR ONE January through December, 1985 l

Sample Pathway or Medium: Airborne-Charcoal Cartridge Duplicate sample Location: ANO Weather Station Distance and Direction: 0.65 miles, 90*

Frequency: Weekly Type of Analysis: Radiciodine 1

State Licensee-l Sample Date Results Sample Date Results (DCi/m3) (DCi/m3)

Jan 3 NA Jan 2 All samples 9 9 below LLD 16 NA 16 21 23 29 30 Feb 4 NA Feb 6 11 13 19 20 25 27 Mar 4 NA Mar 6 11 13 19 Except as noted, 20 25 all samples below 27 Apr 2 LLD Apr 3 9 10 15 17 22 24 29 29 May 6 May 5 13 15 20 22 28 29 Jun 3 Jun 5 10 12 17 19 24 26 Jul 1 Jul 3 8 10 17 17 22 24 31 31 Aug 5 Aug 7 -

12 14 19 21 Page 8

.. . _ - . . .~ ... . - .. . _. .. ~ .- ..

. +

ARKANSAS NUCLEAR ONE ,

i January through Decetuber, 1985 L

i Sample Pathway or Medium: Airborno-Charcoal Cartridge Duplicate Location:- Danville Distance and Direction: 21 miles, 205o

Frequency
Weekl y-,

Type of Analysis: Radiciodine ,

l State Licensee /

j Sample Date Results Sample Date Results (DCi/m*) (oCi/m3) ,

4 Jan 3 Jan 2 All samples 9 NA 9 below LLD ,

16 '16 21 23 29 30 Feb 4 NA Feb 6 11 13 19 20 -

25 27 .

Mar 4 Mar 6 ' '

-l 11 NA 13 19 20 25 , 27 Apr 2 Except as noted, Apr 3 i

9 all samples below 10 15 LLD- 17 22 '

24 -

29 29- r May 6 May 5 13 '

15 20 22 28 29 ' ' '

Jun 3 Jun 5 10 12 17 19 '

24 26' ;

  • Jul 1 Jul 3~ - \

8 10 e i 1

17 17-4 22 24 ~

31 31 Aug 5 Aug 7 12 s 14 19 21 i

  • ?

Page 10 '

,- . ,a-c - - , . ~ , , ss , ,w, - ,

.af' ,. . , , , . , -

ARKANSAS NUCLEAR ONE January through December, 1985 (continued)

Sample Pathway or Medium: Airborne-Particulate, duplicate Location: ANO Weather Station Distance and Direction: 0.65 miles, 90 Frequency: Weekly Type of Analysis: Gross Beta State Licensee Sample Date Results Sample Date Results (oCi/m3) (oCi/m')

Sep 10 12.0 1 1.OE-03 Sep 11 12.38 1 1.886E-03 17 19.0 1 1.OE-03 18 22.47 1 2.056E-03 24 17.0 1 1.OE-03 25 12.72 1 1.851E-03 Oct 3 20.7 1 1.3E-03 Oct 2 18.45 t 2.OO2E-03 9 22.0 1 1.5E-03 9 16.05 t 1.985E-03 15 17.5 1 1.3E-03 16 16.29 t 1.586E-03 23 15.6 1 1.1E-03 23 18.30 1 1.981E-03 29 19.6 1 1.4E-03 30 4.677 1 2.934E-03 Nov 6 21.0 1 1.OE-03 Nov 6 23.69 t 2.230E-03 13 25.0 1 2.OE-03 13 19.31 1 2.152E-03 21 18.0 1 1.OE-03 20 13.32 1 2.OO1E-03 26 27.0 1 1.OE-03 27 19.52 1 2.012E-03 Dec 4 21.0 1 1.OE-03 Dec 4 25.83 1 2.246E-03 11 37.0 1 2.OE-03 11 38.85 1 2.672E-03 18_ 31.0 1 2.OE-03 18 30.48 1 2.380E-03 23 34.0 1 1.OE-03 26 No specific report *

  • Licensee annual report for 1985 lists a range of 6 - 44 E-03 pCi/m3 with a mean of 16 E-03 pCi/m*.

NOTE 1: State samples in Jan - Mar not collected due to operator error. On these occasions, the sample collected on the subsequent week was therefore a two week cumulative sample.

NOTE 2: Except for three July samples and samples collected in Sep - Oct, when there were equipment problems creating delays in counting, the typical time lag between collection and counting was 2 to 5 days for the state.

For the Licensee, this time lag varied from approximately 2 weeks to approximately 2 months.

Page 13

.~

ARKANSAS NUCLEAR ONE January through December, 1985 (continued)

Sample Pathway or Medium: Airborne-Particulate, duplicate Location: Danville (control)

Distance and Direction: 21 miles, 205o Frequency: Weekly Type of Analysis: Gross Beta State Licensee Sample Date Results Sample Date Results (DCi /m3 ) (DCi/m3)

Sep 24 17.0 1 1.OE-03 Sep 25 15.26 1 1.940E-03 Oct 3 17.1 1 1.1E-03 Oct 2 19.68 1 2.047E-03 9 23.7 1 1.6E-03 9 17.58 1 2.046E-03 15 16.3 1 1.3E-03 16 16.82 1 1.948E-03 23 16.0 1 1.1E-03 23 15.92 1 1.900E-03 29 17.3 1 1.4E-03 30 17.76 1 2.052E-03 Nov 6 20.0 1 1.OE-03 Nov 6 22.31 1 2.235E-03 13 23.0 1 2.OE-03 13 31.09 1 4.043E-03 21 15.0 1 1.OE-03 20 12.02 1 2.733E-03 26 28.0 1 1.OE-03 27 26.95 1 2.528E-03 Dec 4 19.0 1 1.OE-03 Dec 4 19.40 1 2.099E-03 11 37.0 1 2.OE-03 11 44.53 1 2.510E-03 18 29.0 1 2.OE-03 18 36.16 1 2.539E-03 23 26.0 1 1.OE-03 26 No specific report *

  • Licensee annual report lists a range of 3 - 44 E-03 pCi/m*

with a mean of 16 E-03 pCi/m*.

NOTE 1: State samples in Jan - Mar not collected due to operator error. On these occasions, the sample collected on the subsequent week was therefore a two week cumulative sample.

NOTE 2: Except for three July samples and samples collected in l Sep - Oct, when there were equipment problems creating l delays in counting, the typical time lag between collection and counting was 2 to 5 days for the state.

For the Licensee, this time lag varied from approximately 2 weeks to approximately 2 months.

l l

Page 15

r -

If

.Q S7- 32s l

delame DEPARTMENT OF HEALTH i ($ l 4815 WEST MARKHAM STREET .

LITTLE ROCK. ARKANSAS 72201 TELEPHONE AC 501661-2000 .

]

BILL CUNTON BEN N SALTZMAN. M D.  % -

GOVERNOR DIRECTOR I I I

1 June 9, 1986 1 Li JUN l 61986 R li Robert D. Martin, Regional Administrator  !

J L)

Nuclear Regulatory Commission j 611 Ryan Plaza Drive, Suite 1000 ~-

Arlington, Texas 76011

Dear Mr. Martin,

Enclosed are the revised pages for the environmental monitoring report for cooperative agreement NRC-05-83-667 activities around Arkansas Nuclear One during calendar year 1985 These pages include data from the licensee which was not available for the original re po r t .

Should you have any questions, do not hesitate to contact me.

Sincerly, u

7 E . on, i rector Division of Radiation Control and Emergency Management EFW/TT Enclosures g p '4 0 '

t'>

www,w- i i 4