Forwards Request for Addl Info Re Submitting License Amend Request for Approval to Implement voltage-based SG Tube Repair Criteria at Beaver Valley Power Station,Unit 2
ML20199F483
Person / Time
Site: Beaver Valley
Issue date: 11/13/1997
From: Brinkman D
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
References
TAC-M95793, NUDOCS 9711240228
Download: ML20199F483 (4)


Text

_... _. _.

-November 13, 1997h,

l y

Mr; J.'E. Cross

~ President-Generation Group, i

Duquesne Light Company 1

~

Post.0ffice Box 4 4

Shippingport PA !!077.

l

SUBJECT:

- REQUEST FOR ADDITIONAL INFORMATION'(RAI)'REGARDING REVIEW 0F BEAVER

- VALLEY POWER STATION,- UNIT N0. 2 (BVPS-2) PROPOSED LICENSE: AMENDMENT'-

TO IMPLEMENT VOLTAGE-BASED STEAM GENERATOR TUBE, REPAIR CRITERIA--

(TAC N0. M95793)

Dear Mr. Cross:

.l By letter dated June 18 1996, Duquesne Light Company (DLC) submitted a t

~

-license amendment request for approval to im>1ement. voltage-based steam generator tube repair criteria at BVPS-2. Tie NRC staff is reviewing this-

request but has determined that additional information is required to complete our review. The required additional information is identified in the enclosed RAI. DLC is requested to provide the additional information within 30 days of receipt of this le'.ter, so that the NRC staff may complete its review within a timely. manner.

Should you have any questions on this matter, plat e contact me at (301).415-1409.

Sincerely,

/S/

Donald S. Brinkman, Senior Project Manager e

Project Directorate I-2 Division of Reactor Projects I/II-E Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

RAI cc w/ enc 1: See next-page iL

-d [ i R

g 3ph 5 dg kjl%~"d@ *(Sp* Qty DISTRIBUTLON

~

' Docket Fi'e.

M0'Brien k

PUBLIC' OGC-PDI-2 Reading-ACRS-l I

-B3oger

~PEselgroth, RI

. JStol z -

SCoffin DBrinkman E0bec-Mathet OFFICE PDI-2/PMA f/

PDivi/L1 PQTV/D NAME DBrinkmInd M0YrYeb JSto b DATE

/ / //1/97 -

M/d/97 l / '1297-0FFICIAL RECORD COPY DOCUMENT NAME:

BV95793.RAI=

munquji.i!

>qavJV 97!'240228 971113 PTA ADOCK-05000412 P

PM

4 p Ceay J-t UNITED STATES j-NUCLEAR REGULATORY COMMISSION

%,[,,,/j WASHINGTON, D.C. 30006 4001 November 13, 1997 Mr. J. E. Cross President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW OF BEAVER VALLEY POWER STATION, UNIT NO. 2 (BVPS-2) PROPOSED LICENSE AMENDMENT TO IMPLEMENT VOLTAGE-BASED STEAM GENERATOR TUBE REPAIR CRITERIA (TAC NO. M95793)

Dear Mr. Cross:

By letter dated C.ine 18, 1996, Duquesne Light Company (DLC) submitted a license ansendment request for approval to implement voltage-based steam generator tube repair criteria at BVPS-2. The NRC staff is reviewing this request but has determined that additional information is required to complete our review.

The required additional information is identified in the enclosed RAI. DLC is requested to provide the additional information within 30 days of receipt of this letter, so that the NRC staff may complete its review within a timely manner.

Should you have any questions on this matter, please contact me at (301) 415-1409.

Sincerely, Y

Donald S. Brinkman, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

RAI cc w/ enc 1:

See next page

l-J. E. Cross Beaver Valley Power Station Duquesne Light Company.

Units 1 & 2 cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.

Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17120 Department (BV-A)

Duquesne Light Company Mayor of the Borrough of Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Snippingport, PA 15077 Shippingport, PA 15077 Comissioner Roy M. Smith Regional Administrator, Region I Vest Virginia Department of Labor U.S. Nuclear Regulatory Comission Building 3 Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WVA 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Comission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN:

S. C. Jain, Vice President Ohio EPA-DERR Nuclear Services (BV-A)

ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Eners Comittee

~

Sierra Club 433 Orlando Avenue State College, PA 16803 Duquesne Light Company Beaver Valley Power Station PO Box 4 Shippingport, PA 15077 ATTN:

R. L. Grand, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)

s RE0 VEST FOR ADDITIONAL INFORMATION REGABDJE VOLTAGE-BASED STEAM GENERATOR TUBE REPAIR CRITERIA B.EAVER VALLEY POWER STATION. UNIT NO. 2 DOCKET NO. 50-412 1.

The NRC staff cannot complete its review of your submittal without a l

review of the methodology DLC plans to use in the implementation of the L

voltage-based rr. pair criteria. Describe the methodology or, as an alternative, confirn DLCs plan to use the probabilistic methodology as described in WCAP-14277, Revision 1 which has already been approved by the NRC staff, i

2.

In a letter dated October 15, 1996, NE! proposed revised criteria for asst tsing new probe variability. The revised criteria is based on a review of the data used originally to support the position that only the primary frequency was required for tests on new probes to verify that they wet the voltage variability specification of +/- 10%.

NEI reccmmended that new probes be tested at both the primary and n:ix frequencies. Confirm DLC's plan to follow the NEl recommendation set forth in the October 15, 1996 letter.

If not, provide the basis for DLC's conclusion that the original probe variability criteria is adequate.