Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199E724 + (ML20199E724)
- IR 05000498/1982002 + (ML20199E725)
- ML20199E727 + (ML20199E727)
- ML20199E731 + (ML20199E731)
- ML20199E732 + (ML20199E732)
- ML20199E733 + (ML20199E733)
- ML20199E734 + (ML20199E734)
- BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With + (ML20199E735)
- ML20199E737 + (ML20199E737)
- ML20199E738 + (ML20199E738)
- ML20199E740 + (ML20199E740)
- ML20199E741 + (ML20199E741)
- RBG-23862, Forwards Addendum to Semiannual Radioactive Effluent Release Rept for Oct-Dec 1985,providing Info on Sr-90,Sr-89 & Fe-55 Releases.Erratum to Semiannual Radioactive Effluent Release Rept for Oct-Dec 1985 Also Encl + (ML20199E742)
- ML20199E743 + (ML20199E743)
- ML20199E744 + (ML20199E744)
- ML20199E747 + (ML20199E747)
- ML20199E748 + (ML20199E748)
- NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With + (ML20199E750)
- ML20199E751 + (ML20199E751)
- ML20199E752 + (ML20199E752)
- PY-CEI-NRR-0469, Forwards List of Tech Spec Changes to Accompany Full Power Ol,Representing Minor Editorial Corrections,Clarifications & Enhancements.Justifications & Proposed marked-up Tech Spec Pages Also Encl + (ML20199E755)
- ML20199E756 + (ML20199E756)
- ML20199E758 + (ML20199E758)
- 05000213/LER-1997-019, :on 970808,compensatory Sampling Frequency Exceeded W/Rms Determined Inoperable.Caused by Personnel Error Due to Incorrect Interpretation of Ts.Compensatory Sampling to Be Conducted in Time Frame Required + (ML20199E759)
- ML20199E760 + (ML20199E760)
- ML20199E761 + (ML20199E761)
- IA-97-265, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in Pdr.App B Records Being Withheld in Part (Ref FOIA Exemption 6) + (ML20199E762)
- ML20199E762 + (ML20199E762)
- ML20199E764 + (ML20199E764)
- ML20199E765 + (ML20199E765)
- ML20199E766 + (ML20199E766)
- ML20199E767 + (ML20199E767)
- ML20199E771 + (ML20199E771)
- ML20199E773 + (ML20199E773)
- ML20199E774 + (ML20199E774)
- ML20199E776 + (ML20199E776)
- 05000423/LER-1997-052, :on 971014,deficienies Were Identified in Performance of Surveillances for PORV Instrumentation.Caused by Procedural Deficiency.Reveiw of B Train PORV Circuity Conducted for Similar Conditions + (ML20199E777)
- 05000324/LER-1998-004-03, :on 981216,HPCI Sys Was Rendered Inoperable to Support Scheduled Maint Activity.Caused by Deficiencies in Scheduling & Planning of 2-E41-F079 Valve Work Activity. Personnel Have Been Briefed on Event.With + (ML20199E779)
- ML20199E780 + (ML20199E780)
- ML20199E781 + (ML20199E781)
- ML20199E782 + (ML20199E782)
- ML20199E783 + (ML20199E783)
- ML20199E787 + (ML20199E787)
- ML20199E788 + (ML20199E788)
- ML20199E790 + (ML20199E790)
- ML20199E791 + (ML20199E791)
- ML20199E792 + (ML20199E792)
- ML20199E793 + (ML20199E793)
- ML20199E794 + (ML20199E794)
- ML20199E795 + (ML20199E795)
- ML20199E796 + (ML20199E796)
- ML20199E797 + (ML20199E797)