Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P280 + (ML20198P280)
- ML20198P282 + (ML20198P282)
- ML20198P284 + (ML20198P284)
- ML20198P287 + (ML20198P287)
- ML20198P290 + (ML20198P290)
- ML20198P292 + (ML20198P292)
- B16819, Responds to Requests Made by NRC at 970923 Restart Assessment Panel Meeting Re Current Level of Readiness at Millstone Station for Various Restart Insp at Each Unit. Commitments Listed + (ML20198P293)
- ML20198P294 + (ML20198P294)
- RC-98-0229, Fifteenth Annual 10CFR50.59 Rept for VC Summer Nuclear Station, for Period Ending 970806.With + (ML20198P299)
- ML20198P300 + (ML20198P300)
- ML20198P303 + (ML20198P303)
- RC-97-0225, Responds to Violations Noted in Insp Rept 50-395/97-11. Corrective Actions:Decided to Enter TS 3.0.3 & Reduced Power While Calibr Performed to Return OT Delta T & OP Delta T lead-lag Time Constant Settings within TS Values + (ML20198P306)
- RC-97-0226, Submits Special Rept Spr 970001 Re Completion of ISI of SG Tubes Plugged or Repaired in Generator.No Tubes Plugged During Insp Interval + (ML20198P309)
- ML20198P311 + (ML20198P311)
- U-602848, Retracts Commitment Made in Util Re W 4160-volt Circuit Breakers at Plant.Initial Determination That Breakers Were in Intermediate Postion & Thus Failed to Open Incorrect + (ML20198P312)
- ML20198P314 + (ML20198P314)
- ML20198P315 + (ML20198P315)
- ML20198P317 + (ML20198P317)
- ML20198P318 + (ML20198P318)
- ML20198P322 + (ML20198P322)
- ML20198P324 + (ML20198P324)
- ML20198P325 + (ML20198P325)
- ML20198P326 + (ML20198P326)
- 05000237/LER-1986-007-07, :on 860501,two Containment Atmosphere Monitoring Lines Did Not Meet NUREG-0661 Criteria.Caused by Lack of Design Document Control During Mod.Monthly Status Rept Will Be Mailed to Each Ae + (ML20198P327)
- ML20198P329 + (ML20198P329)
- ML20198P331 + (ML20198P331)
- ML20198P332 + (ML20198P332)
- ML20198P334 + (ML20198P334)
- ML20198P336 + (ML20198P336)
- ML20198P337 + (ML20198P337)
- ML20198P338 + (ML20198P338)
- ML20198P342 + (ML20198P342)
- ML20198P343 + (ML20198P343)
- ML20198P345 + (ML20198P345)
- 05000461/LER-1997-024, :on 970830,failure to Comply W/Ts Action Statement to Immediately Restore AC Power Sources Was Determined.Caused by Inadequate Interpretation of TS Action. Licensing Providing Staff Guidance + (ML20198P346)
- ML20198P349 + (ML20198P349)
- ML20198P350 + (ML20198P350)
- ML20198P351 + (ML20198P351)
- ML20198P352 + (ML20198P352)
- ML20198P353 + (ML20198P353)
- ML20198P355 + (ML20198P355)
- ML20198P356 + (ML20198P356)
- NSD-NRC-97-5408, Forwards Responses to Two Comments on Chapter 15 of AP600 Ssar,Dtd 970121.Responses Close OITS-4462,Comment 2 & OITS-4476,Comment 12,from W Perspective + (ML20198P360)
- ML20198P361 + (ML20198P361)
- ML20198P362 + (ML20198P362)
- ML20198P363 + (ML20198P363)
- ML20198P365 + (ML20198P365)
- ML20198P366 + (ML20198P366)
- ML20198P370 + (ML20198P370)
- PY-CEI-NRR-2226, Informs of Completion of Requested Actions Prior to Startup from First Refueling Outage Commencing One Yr After Issuance of GL 96-01, Testing of SR Logic Circuits. Actions,Listed + (ML20198P372)
- IR 07100102/2012013 + (ML20198P373)