Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P225 + (ML20198P225)
- 05000302/LER-1997-032, :on 970406,discovered Inadequate Electrical Isolation on Safety Related Power Supply.Caused by Design Error.Isolation Device Will Be Installed or Solenoid Valve Will Be Replaced W/Sr Solenoid Prior to Mode 4 + (ML20198P226)
- ML20198P227 + (ML20198P227)
- 05000423/LER-1986-033, :on 860429,low Level Waste Tank Discharged W/Radiation Monitor Sample Pump Deenergized,Rendering Liquid Effluent Monitoring Instrumentation Inoperable.Caused by Operator Error + (ML20198P229)
- ML20198P234 + (ML20198P234)
- 0CAN019804, Monthly Operating Repts for Dec 1997 for ANO Units 1 & 2 + (ML20198P235)
- ML20198P236 + (ML20198P236)
- IR 05000302/1997018 + (ML20198P238)
- ML20198P241 + (ML20198P241)
- ML20198P243 + (ML20198P243)
- ML20198P244 + (ML20198P244)
- ML20198P246 + (ML20198P246)
- ML20198P250 + (ML20198P250)
- ML20198P251 + (ML20198P251)
- ML20198P252 + (ML20198P252)
- ML20198P254 + (ML20198P254)
- ML20198P255 + (ML20198P255)
- ML20198P256 + (ML20198P256)
- ML20198P257 + (ML20198P257)
- ML20198P258 + (ML20198P258)
- ML20198P261 + (ML20198P261)
- BSEP-97-0458, Application for Amends to Licenses DPR-71 & DPR-62,revising Description of Control Rod Assemblies,Per Description Contained in NUREG-1433,Rev 1 + (ML20198P262)
- ML20198P263 + (ML20198P263)
- ML20198P268 + (ML20198P268)
- ML20198P269 + (ML20198P269)
- ML20198P271 + (ML20198P271)
- ML20198P276 + (ML20198P276)
- ML20198P278 + (ML20198P278)
- ML20198P280 + (ML20198P280)
- ML20198P282 + (ML20198P282)
- ML20198P284 + (ML20198P284)
- ML20198P287 + (ML20198P287)
- ML20198P290 + (ML20198P290)
- ML20198P292 + (ML20198P292)
- B16819, Responds to Requests Made by NRC at 970923 Restart Assessment Panel Meeting Re Current Level of Readiness at Millstone Station for Various Restart Insp at Each Unit. Commitments Listed + (ML20198P293)
- ML20198P294 + (ML20198P294)
- RC-98-0229, Fifteenth Annual 10CFR50.59 Rept for VC Summer Nuclear Station, for Period Ending 970806.With + (ML20198P299)
- ML20198P300 + (ML20198P300)
- ML20198P303 + (ML20198P303)
- RC-97-0225, Responds to Violations Noted in Insp Rept 50-395/97-11. Corrective Actions:Decided to Enter TS 3.0.3 & Reduced Power While Calibr Performed to Return OT Delta T & OP Delta T lead-lag Time Constant Settings within TS Values + (ML20198P306)
- RC-97-0226, Submits Special Rept Spr 970001 Re Completion of ISI of SG Tubes Plugged or Repaired in Generator.No Tubes Plugged During Insp Interval + (ML20198P309)
- ML20198P311 + (ML20198P311)
- U-602848, Retracts Commitment Made in Util Re W 4160-volt Circuit Breakers at Plant.Initial Determination That Breakers Were in Intermediate Postion & Thus Failed to Open Incorrect + (ML20198P312)
- ML20198P314 + (ML20198P314)
- ML20198P315 + (ML20198P315)
- ML20198P317 + (ML20198P317)
- ML20198P318 + (ML20198P318)
- ML20198P322 + (ML20198P322)
- ML20198P324 + (ML20198P324)
- ML20198P325 + (ML20198P325)
- ML20198P326 + (ML20198P326)