Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198N379 + (ML20198N379)
- TXX-4818, Informs That Full Participation Emergency Preparedness Exercise Scheduled for Nov 1986 Postponed Due to Inability to Achieve Schedule for Operation of Unit 1 by mid-1987 + (ML20198N380)
- ML20198N381 + (ML20198N381)
- B16813, Submits 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps. Commitment Made by Util,Encl + (ML20198N382)
- ML20198N383 + (ML20198N383)
- ML20198N384 + (ML20198N384)
- ML20198N385 + (ML20198N385)
- ML20198N386 + (ML20198N386)
- ML20198N387 + (ML20198N387)
- ML20198N390 + (ML20198N390)
- ML20198N392 + (ML20198N392)
- ML20198N393 + (ML20198N393)
- ML20198N394 + (ML20198N394)
- ML20198N397 + (ML20198N397)
- ML20198N398 + (ML20198N398)
- ML20198N400 + (ML20198N400)
- ML20198N403 + (ML20198N403)
- ML20198N404 + (ML20198N404)
- ML20198N405 + (ML20198N405)
- 05000295/LER-1994-005-01, Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl + (ML20198N406)
- HL-5503, Discusses Plans to Submit Methodology Document Which Delineates Scoping & Screening Process & License Renewal Application for Plant.Relief from Part 170 Review Fees Associated W/Hatch Specific Submittals,Requested + (ML20198N407)
- ML20198N411 + (ML20198N411)
- SVP-97-244, Requests Exemption from Requirements of 10CFR70.14(a), Criticality Accident Requirements, Because Plant Design Bases for Fuel Storage,Handling & Use Preclude Accidental Criticality Event + (ML20198N412)
- ML20198N416 + (ML20198N416)
- ML20198N418 + (ML20198N418)
- ML20198N421 + (ML20198N421)
- ML20198N423 + (ML20198N423)
- 3F0198-11, Provides Confirmation by Util of Actions Completed Re LAR 220 for Unit 3,as Previously Discussed in Ltr + (ML20198N425)
- 3F1097-08, Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl + (ML20198N426)
- ML20198N427 + (ML20198N427)
- 05000295/LER-1994-005-03, :on 940403,Unit 1 Main Reactor Trip & Subsequent Start of 1A Afp Following Generator Fire & Isophase Bus Duct Fault,Occurred.Caused by Main Generator Phase C Bushing Failure.Internal Insp Was Performed + (ML20198N428)
- IR 05000254/1998020 + (ML20198N429)
- ML20198N431 + (ML20198N431)
- ML20198N433 + (ML20198N433)
- ML20198N436 + (ML20198N436)
- ML20198N439 + (ML20198N439)
- IR 07100117/2012017 + (ML20198N440)
- ML20198N441 + (ML20198N441)
- ML20198N442 + (ML20198N442)
- ML20198N444 + (ML20198N444)
- ML20198N446 + (ML20198N446)
- ML20198N447 + (ML20198N447)
- 05000354/LER-1997-016-01, :on 970716,filtration,recirculation & Ventilation Sys TS Surveillance Compliance Occurred.Caused by Failure of Procedure Revs to Recognize Need to Justify Exception.Procedures Revised.With + (ML20198N449)
- IR 05000327/1997015 + (ML20198N452)
- ML20198N453 + (ML20198N453)
- ML20198N461 + (ML20198N461)
- ML20198N462 + (ML20198N462)
- U-602912, Forwards Check for $450,000 to Replace Original Check Sent on 970709 for Payment of Civil Penalty,Nov & Proposed Imposition of Penalties.Util Has Stopped Payment on Original Check + (ML20198N463)
- ML20198N465 + (ML20198N465)
- 3F0198-29, Informs That Util in Conjunction W/Framatome Technologies Inc,Completed Confirmation Which Includes Consideration of SG Tube Plugging Levels Specific for CR-3.Util Verified That LOCA Analyses of Record Does Not Require Manual Actuation + (ML20198N469)
- ML20198N470 + (ML20198N470)