Forwards twenty-eight Discrepancy Repts (Drs) Identified During Review Activities of Independent Corrective Action Verification Program.Two Drs That Have Been Determined Invalid,Encl
ML20198N421
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/28/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
9583-100, NUDOCS 9711040220
Download: ML20198N421 (54)


Text

-___

g, n .c s t #- gg kA Sar gant$Lundy u e h

Doc K. Schopfer /

' Vice hesident -

f 312 26S 6078 October 28,1997 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Energy Company .

Millstone Nuclear Power Station, Uni; No. 3 Independent Corrective Action Vedfication Program United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I have enclosed the following twenty-eight (28) discrepancy reports (DRs) identified i during our review activities for the ICAVP. These DRs are being distributed in accordance with the Communications Protocol, PI-MP3-01. j DR No. DR-MP3-0143 DR No. DR-MP3-0421 f

DR No. DR-MP3-0217 DR No. DR-MP3-0445 DR No. DR-MP3-0232 DR No. DR-MP3-0463 DR No. DR-MP3-0250 DR No. DR-MP3-0466 DR No. DR-MP3-0304 DR No. DR-MP3-0467 DR No, DR-MP3-0351 DR No. DR-MP3-0468 b9 l

DR No. DR-MP3-0355 DR No. DR-MP3-0485 DR No. DR-MP3-0357 DR No. DR-MP3-0486 i DR No. DR-MP3-0365 DR No. DR-MP3-0543 DR No. DR-MP3-0367 DR No. DR-MP3-0544 DR No. DR-MP3 0368 DR No. DR-MP3-0545 l

- DR No. DR-MP3-0369 DR No. DR-MP3-0547 (

' DR No. DR-MP3-0372 DR No. DR-MP3-0555 DR No. DR-MP3-0375 - DR No. DR-MP3-0556 I have abo enclosed the following two (2) DRs that have been determined invalid. No action is required from Northeast Utilities for these two DRs. The basis for their invalid determination is included on the document.

C /4 i.p o n DR No. DR-MP3-0323 DR No. DR-MP3-0520 9711040220 97102g

[lglg glggggi...

DR ADOCK 05000423 PDR 55 East Monroe Street

  • Ctucago IL 60603 5780 (JSA
  • 312-269-2000

'~

*M United States Nuclear Regulatory Commission- October 311997 Document Control Desk Project No,9583100 Page 2

- Please direct any questions to me at (312) 269-6078. ,

Yours very truly,

. c y ~

D. K. chopfer Vice President and ICAVP M(anager DKS:spr Enclosures Copies:

E. Imbro (1/l) Deputy Director, ICAVP Oversight T. Concannon (1/1) Nuclear Energy Advisory Council J. Fougere (1/l) NU '

m%evpbwe97w1031a de i

4 Northeast Utilities ICAVP DR No. DR MP3 0143 Ministone unit 3 Discrepancy Report Review occup: system DR VAUD EW: $@ W Potentiel operet'ity issue DiecipNne: Mecherncel Design O Y=

D6screpancy Type: Lloonsing Ducuraent System @ rte,ess: RSs gg NRC Sign 6ecence level: 4 Date Faxed to NU:

Date Published: 11/2S7 D6ecrePancy: Inconsistency between FSAR Section 6.2.2.2 & Spec 2361.900-921 regarding thermalinsulation DeecripHon: FSAR Section 6.2.2.2 states that encapsulated insulation inside containment has inner and outer stainless steel Jackets with minimum thicknesses of 0.010 and 0.018 inches, respectively.

However, General Thermal Insulation Specification 2361,900-921 Revision 2 states that the Jacketing minimum thickness is 0.010 inches, not addressin0 whether the jacket is the inner or outer layer, Review Valid invol6d Needed Date initiator: Feingoed, D. J. 8 O O o/17/S7 VT Leed: Neri, Anthony A g O O 1o/17/97 VT Mgr: Schopfer, Don K G O O to/20S7 IRC Chmn: S6ngh, Anand K @ Q C to/3oS7 Date:

INVAUD:

Date:

RESOLUTION:

~

Previously identified by NU7 O Yes (#) No Non Descrepent Condstion O Yee @ No Resiew

^#*

  • leistor: Femgced, D. J.

VT Lead: Nort, Anthony A VT Mgt: Schopfer Don K IRC Chmn: Singh, Anand K Date:

sL Comments:

Printed 10/31S7 9.32:36 AM Pege 1 of 1

e 4

Northeast Utilities ICAVP DR No. DR MP3-0217 Milistone Unit 3 Discrepancy Report Review Group: System DR VAUD E M :S @ W Potential Operetn64ty issue

  • W: Ia c Dwign EM:---- y Type: Drowing O Ya System 9tocess: RSS g

NRC SigniReance level: 4 Date faxed to NU:

Date Published: 11/2/97 D6ecropency: Drawing Discrepancy . LSK 2711 A,B,J,K Dactl P*6on: Condition for Pump P1D on LSK 27118 should be changed from

  • Bus 34D Bus Diff, Lockout Relay Reset" to
  • Bus 34D Bus Diff. Lockout Relay Operated
  • to be consistent with the Condition Pumps P1 A, P1B and P1C. Bus Diff. Lockout Relay ,

s prated is one of the Conditions required to trip the pump, Revww Veild Invetid Needed Date initiator: Pinetes, H. G O O $0/17'S7 VT Leed: Nort, Anthony A @ ] { 1o/17/97 VT Mgr: Schopfer, Don K O O D ior23/97 ioraa,7 IRC Chmn: 86ngh, Anand K G O O Date:

INVAUD:

Date:

RESOUJTION' Previously klenteRed by NU7 Q Yes (S) No Non Descrepent Condson Q Yes @ No Review inilleter: Pinoise, H.

VT Lead: Nort, Atthony A VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand K D.i.:

SL Commerde:

Printed 10"31/97 9 36.29 AM ege 1 of 1

4-Northeast Utilities ICAVP DR No. DR MP3 0232 willstone unn 3 Discrepancy Report Rev6.w oroup: system DR VAuD Review Element: system Design Diecaps6ae: Ia c Denn0" Discrepency Type: Drewin0 O Yes g

systemProceae: sWP NRC signincence level: 4 Date faxed to NU:

Date Published: 11/297 D6ecrepency: Drawing Discrepancy LSK 9108,J D**ctipuon: Logic Diagram LSK 910J, Rev 12 shows that Resultant '86E Motor Protection Lockout Relay Reset

  • requires Local / Remote Selector SMich at tho switchgear to be in
  • Local" and Start /Stop Switch at MB1 to be in "Stop". Local / Remote Gwitch should be ,

in "Reniote" to be consistent with remote control "Stop" signal from M81. This is shown on Elementary Diagrams ESK 5CJ, Rev.17 and ESK 38, Rev 16.

Logic Diagram LSK 910J also shows that " Service Water Pump Auto Trip /Overcurrent" annunciation requires Local / Remote Selector Switch at the switchgear to be in " Local" and Start /Stop Switch at MB1 to be in "After Start". Local / Remote Switch should be in ' Remote" to be consistent with remote control "After Start" signal from MB1, This is shown on Elementary Diagrams ESK SCJ, Rev.17 and ESK-38, Rev 16.

Escutcheons for the switchgear Local / Remote Selector Switch and M81 Start /Stop Switch are missing from Logic Diagrams LSK 9108, Rev 12 and LSK 9-10J.

Review Valid Invalid Needed Date inittetor: Ptneles, H.

O O O o'17S7 VT Leed: Nort, Anthony A G O O tor 27sr VT Mgr: Schopfer, Don K G O O or28<97 IRC Chmn: Singh, Anand K g Q Q IorJoS7 Date:

INVAL10:

Date:

RESOLUTION

  • Prov6ously Hentined by NU7 O Yes (80 No Non Discrepent Condition O Yes i9i No y Review

"** 'd

  • initiator: Paneles, H.

VT Lead: Nort, Anthony A VT Mgr: Schopfer. Don K 1RC Chmn: Sin 0h, Anand K Det.:

sL comnwnte:

Printed 1W3147 9 41:33 AM Page 1 or 1 1

4 Northeast Utilities ICAVP DR No. DR MP3-4260 millstone unit 3 - - Discrepancy Report Review Group: Conngurseon DR VAUD Review Element: Syetem instatehon

)

Diecipline: EW Dm%n Diecrepency Type: Im W O Y= l SystwrWProceae: SWP

@ No NRC Signinconce level: 3 Date faxed to NU:

Date Published.11/2S7 D6ecrepency: Cable Tray Cover not in Accordance with Drawing Dacription: Cable Tray Cover drawing 12179-EE 34TC, Rev.1 Indicates that tray 3TK864N is covered for its full length. The tray does not have a top cover between supports D102A-11 and D102A 13.

Tray covers are normaly installed to provide separation or mechanical protection and the lack of this cover could lead to the en slidation of design basis analysis or physical damage to cables.

Review Vand invenid N.eded Date loitiator: Server, T. L Q Q Q 10/2&97 VT Lead: Nort, Anthony A G O O 10/2ss7 VT Mgr: Schopfer, Don K G O O 10'30S7 IRC Chmn: Singh, Anand K Q Q 10/30/97 Date:

INVAUo:

Date:

RESOLUTION.

Previously identified by NU7 Q Yes @ No Non Discrepent Condition O Yes @ No Review initletor: Server, T. L VT Leed: Nort, Anthony A O -

VT Mgr: Schopfer, Don K IRc Chmn: Singh, Anand K Date:

SL Comments:

Printed 10J147 9 43 40 AM Page 1 of 1

Northeast Utilities ICAVP DR No, DR MP3 0304 l Millstone Unit 3 Discrepancy Report Review Group: System DRVAUD Revww System Desen *

,,,,,,,,, ,,,,,,,,y ,,,,,

Diecipline: Mechanical Donen Diacrepancy Type: Component Date O va gg

~

Systemerocese: RSS NRC Signirecence level: 4 Date faked to NU:

Date Pubushed: 11297 D'icropency: Containment recirculation pump design pH is inconsistent with FSAR Section 6.5.2.1..

Ducription: FSAR Section 6.5.2.1 identifies the containment recirculation fluid to have a pH of 7.0 to 10.5. However, the containment recirculation pump design specification 2214.802 044 through Revision 1 shows the pump to be designed for a pumped fluid pH renge of 5.0 to 7.5.

According to specification 2214.802 044, the quench spraf pump wetted pads are made of Type 304 stainless steel. These materlats are suitable for the design ph range of 7.0 to 10.5.

Review Valid invalid Needed Date initiator: Feingold, D. J. 8 O O $o/53S7 VT Leed: Nort, Anthony A 8 0 iotiss7 VT Mgr: Schopfer, Don K O O O tor 20,7 IRC Chmn: Singh, Anand K g Q Q 1o/30/97 Date:

INVAUD:

Date:

RESOLUTION:

Previously identitled by NU7 () Yes t#1 No Non Discrepent Condd6on C) Yee ih No Rev6ew Acceptable Not Acceptable Needed Date MW: M VT Leed: Neri, Anthony A VT Mgt: Schopfer, Don K IRC C'unn: Singh, Anand K Date:

SL Commente:

Printed 1o/31/97 9 44.50 AM Page 1 of 1

P Northeast Utilities ICAVP DR No. DR-MP3-0351 Millstone Unit 3 Discrepancy Report R.vi or ,: Conng on DR vAuD Review Element: System Design g ..

Diecipl6ne: Electricei Design

- D6ecrepency Type: Instenshon ernplementaten O Ya systemProcess: Os3 gg NRC Significence level: 4 Date Faxed to NU; Dete Eublished: 11f2./97 D*cr*pency: Walkdown discrepancies D**ctlption: The following discrepant conditions were identified during the field walkdowns:

1. Drawing EE 6EL Rev. 2 and the Cable and Raceway Program (TSO2) indicate conduit number 3CK949ND9 runs between 3 HTS-JB982P and 3 HTS-JB980S. The conduit is tagged 3CK949NB9 in the field.
2. The ground wire running with the flexible conduit connecting to 3QSS-FIT 22 is not connected at the non instrument end.

Grounds for flexible conduits are required to be connected per ElectricalInstallation specification E 350.

The following material condition was noted;this is not a configuration issue:

1. The conduit connection fittings to boxes 3 HTS-JB979S and JB924S are very rusty.
2. The instruments (RTDs/TEs) of the heat tracing system are not tagged contrary to requirements of ElectricalInstallation 3pecification E 350.

Review Valid inveiid Needed Date inatiator: server, T. L.

O O O 'o/28'87 VT Lead: Nerl. Anthony A O Q 10'27/97 Q

VT Mgr: schopfer, Don K B O O 10/30/S7 1RC Chmn: singh, Anand K Q Q Q 10/3097 Date:

INVAUD:

Date:

RESOLUTION:

Previously identifled by NU7 O Yes @ No Non Diecropent Condition Q Yes @ No Review Acceptable Not Acceptable Neoced Date VT Leed: Nort, Anthony A vT u nr: senopfer. Don K IRC Chmn: singh. Anand K @ ] @

g Date:

SL Commente:

Pttnied 10/31/97 9 47.48 AM Page 1 of 1

1 Northeast Utilities ICAVP DR No. DR MP3-0355

. Miiistone unit 3 - Discrepancy Report Review oroup: conn euronon DnyAuD Potential Operebety leeue D6eciphne: Electrical Deegn O Yes Descrepency Type: Int *eneman implementaten SystemProcess: sWP gg NRC significance level: 3 Date faked to NU:

Date Published: 11/2/97 Duropency: Cable Routing is Not Consistent With TS02 Deecription: Conduit 3CK768PB-4' runs between MCC 3EHS*MCC184 and the tray system above the MCC providing transition of cabling to the supplied components. There are three "K" service level 480 V power cables in this condult. These cables exit sis conduit with at least one of the caules entering a tray marked in the field as 3TC768P - a 120V control ("C" service level) cable tray.

This marking appears to be consistent with the tray arrangement drawings. The TSO2 routings for all three of these cables show that these cables are all routed into 3TK768P - a 480V power cable tray. The routing of higher energy cables (480V) in lower energy trays is generally not done, The Cable / Raceway Control Program Users Manuals indicates that "C" cables may be routed in "K" trays on a limited basis, but does not allow 'K" cables in

'C' trays.

The routing of power cables in control trays could adversely affect all control circuits with cables routed in the tray in the event of the power cable / circuit malfunction. Such a condition has the potential to render several components of multiple systems within the train inoperable.

Review Veild invalid Needed Date inatiator: server, T. L G O O $ 0*S7 VT Leed: Nort, Anthony A G O O 1oceS7 VT Mgr: schopfer, Don K Q O O 'o'30S7 IRC Chmn: singh, Anand K Q Q Q 10/3G97 Dele:

INVAUD:

Date:

RESOLUTION

  • Prev 60usly identified by NU? O Yes (9) No Non Discrepent Condition U Yes @ No Review Acceptable Not Acceptable Needed Dme m,, g VT Lead: Non, Anthony A VT Mgr: Schopfer, Don K IRC Clunn: singh, Anand K Date:

SL Convuonts Pnnted lon1/97 9:48:29 AM Page 1 of 1

1 Northeast Utilities ICAVP DR No. DR MP3 0357 l Millstone Unit 3 Discrepancy Report Review oroup: Conneuroman DR VAuo r"

E Design P*'*""* "#I'**"*

D6screpancy Type: Instenehon implementehon SystemProcese: SWo g

NRC signinconce level: 4 Date faxed to NU:

Date Published: 11/2/97 Discrepancy: Installation not consistent with design drwwing/ specification Descript6on:

1. Drawing EE 53A, Rev.19, indicates that conduit 3CC880NB6 is 1 inch diameter. The Cable and Raceway Program (TSO2) and the Conduit Support Logs indicate the conduit is 1 inch diameter The conduit was installed in the fieH as % inch.
2. The Cable ano Raceway Program (TSO2) lists conduit 3CC880PD vith *from ties' of both tray 3TC880P and tray 3TC881P. The installed conduit is clearly associated tray section 3TCS81P which in tum is connected to tray 3TC880P.
3. The ground wires running with the raceway terminating flexible conduits for valve SWP*MOV24C are not ennnected at both ends as required by ElectricalInstallation Specification E-350,
4. The ground wire running with the raceway terminating flexible conduit for SWP TE127C is not securely conn 3cted at both ends as required by Electrical Installation Specification E 350.

The following material condition was noted; this is not a configuration isse.

1. Conduit 3CC881PH connects to the motor space heater terminal box 3SWP'TBPID2 via a flexible section of conduit.

This flexible conduit was observed to not be property connected exposing the cabling.

Review Valid invand Needed Date inatiator: Server, T. L O O O o/28/97 VT Leed: Nort, Anthony A G O O tor 27/97 VT Mgr: schopfer, Don K Q O O 1000/S7 IRC Chmn: Singh, Anand K G O O 'fvdo'S7 Date:

INVAUD, Date:

RESOLUTION Previously identiRed by NU7 O Yes @ No Non Discrepent Condition U Yes @ No Rev6ew Initiator: (none)

VT Leed: Noti. Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Printed 10/31/97 9 51-02 AM Page 1 of 2

i

.c Northeast Utilities ICAVP DR No. DR44P34357 Millstone Unit 3 Discrepancy Report m...... , , , _ _ , '

O O O ,

Dele:

SL Comments:

E Printed 10/314T 9,5126 AM Pg 2 of 2

Northeast Utilities ICAVP DR No. DR MP3-0366 Misistone unit 3 Discrepancy Report Review Oroup: Syelem DR VALID Potential Operetssty laeue Discipl6ne: I & C Dw6'"

Discrepency Type: Drew 6ng O vee systantProceu: HVX @ No NRC Signincance level: 4 Date faxed to NU-Date Putsehed' 11/2S7 D6ecrepency: Drawing Discrepancy LSK-22 7C Ductlption: Logic Diagram 22 7C, Rev 9 shows that dampers 3HVP* MOD 20A, MOD 23A, MOD 26A and MOD 20C are controlled automatically if either of the vent supply fans, 3HVP*FNI A or FNIC, is running. Fans are 50% capacity fans per FSAR Section 9.4.6.2. Dampers are controlled automatically if both vent supply fans are ruPaing per FSAR Section 9.4.6.5.

Logic Diagram shows that da'npers are driven to a position opposite their failure positions J both vent supply fans are not running. Dampers are driven to e position opposite their failure positions if either vent supply fan is not running per P&lD EM-1500 i5. This would prevent the temperature controller from modulating the inlet, outlet and recirculating air dampers that would be required when only one supply fan is operating.

The Condition " Dampers Driven to Position Opposite Failure Position

  • has no Source inputs.

Review valid involid Needed Date initiator: Pinetes, H.

O O O 10'15S7 VT Lead: Nort, Areony A B O O $o27S7 VT Mgr: Schopfer Don K O O O ior2ss7 IRC Chmn: Singh, Anand K O O O io'3c87 Date:

INVALID:

Date:

RESOLUTION Previously idenuned by NU7 O Yes @ No Non Diecropont Condtuon O Yes t 4.) e Review g Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgr: Scnopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Commente:

P'intad 1O'3147 9 s3 42 AM page 1 of 1 4

Northeast Utilities ICAVP DR No. DR-MP3-0367 Millstone unk 3 Discrepancy Report

- Review Group: System DR VAUD EM S$ W Potendel Operability issue Discipline: Doctrical Des *"

Discrepancy Type: Cornpanent Data Om SystemProcess: OSS ($) No NRC Signincance level: 4 Date faxed to NU:

Date Published: 11r197 D6screpancy: Design input Discrepancies involving Motor Operated Valves 3QSS*MOV34A and 3QSS*MOV348 Descrippon: A. Motor Operator Replacements for Valves 3QSS*MOV34A and 3QSS*MOV34B Motor operated valves 3QSS*MOV34A and 3QSS*MOV34B were changed from the original purchase specification from 0.13 to 0.33 horsepower. Neither Specification 2382.200-184 Add.1 nor Production Maintenance Management System (PMMS) have been revised to reflect the changes in horsepower, motor torque, full load current, and locked rotor current to valves 3QSS*MOV34A and 3QSS*MOV348. These documents should be revised. The affected voltage and thermal overload sizing Calculation 89 094120E3 (Rev. O, CCN 4) has evaluated both horsepower values, therefore the results of the calculation are not affected.

B. Reliance Motor Curves for Valves 3QSS*MOV34A and 3QSS*MOV34B 1, Fullload current can be obtained from the Reliance motor curve sheet (included in the motor operated valve calculations) in three places: the table, the header, and the curve itself. The values from these three places are usually different. In most cases, the motor operated valve Calculation 89-094120E3 (Rev.

O, CCN 4) states that the full load current is obtained from a walkdown reading of the nameplate, therefore the full load current data shown in the Reliance motor curve sheet is not used. However, for valves 3QSS*MOV34A and 3QSS*MOV348, the thermal overioad heater analysis section of the calculation states that the full load current value was obtained from the Reliance motor curve sheet, but no indication is made to whether the table, the header, or the curve itself was used to obtain this value. The different fullload current values are:

Reliance Motor Curve - curve = 0.73 amperes Reliance Motor Curve - header = 1.0 amperes Reliance Motor Curve table = 0.7 amperes Value used in the thermal overioad relay sizing section of the calculation = 0.73 amperes.

The use of 0.7 amperes has no affect on the calculation. The use of 1.0 amperes reduces the actuation time of the thermal overload relay but the results of the calculation are not changed, Printed 10/31197 to 01:10 AM page 1 of 3

Northeast Utilities ICAVP DR No. DR-MP3 0347

- ministone unit 3 Discrepancy Report namely that the thermal overload relay aduates prior to reaching the motor's capability but after the valve actuator motor duty cycle.

Calculation 89-094-1RE3 uses different full load current values (0.73 or 1.0 amperes) in 'he AC Motor Evaluation Checklist, Limitorque EEQ Walkdow,' Check!!st, motor overioad test record, and molded case circuit breaker test record sheets, in add!'lon, the full load current values are different between the calculation, vendor Drawings 2382.200-164 -043 (Rev. C) and '

2362.200-164-043A (Rev. B) (0.95 amperes) and Plant Design Data System (PDDS) (1.0 amperes). These documents should be revised to reflect the actual full load current.

2. For motor operated valves 3QSS*MOV34A and 3OSS*MOV348, the Reliance motor curve in Calculation 89-094-120E3 (Rev. O, CCN 4) indicates a locked rotor current value of 5.5 in the header of the curve but a locked rotor current value of 5.25 in the table of the curve. The calculation doesn't address which value is u ed or why it is used. In addition, Calculation 89-094120E3 does not match the values shown in vendor Drawings 2362.200164-043 (Rev. C) and 2362.200-164-043A (Rev. B)

(5.0 amperes) and PDDS (5.8 amperes). The adual value of the locked rotor current should be used in these documents.

Calculation 89-094-120E3 used the value of 5.5 amperes in the thermal overload relay sizing and in the overload sections of the calculation. This provides more conservative results than using 5.25 amperes.

C. Motor Ampacities of Valves 3QSS*MOV34A and 3QSS*MOV348 For motor operated valves 30SS*MOV34A and 3OSS*MOV348, Production Maintenance Management System (PMMS) has three ampacity categories and values for two ampacity attributes:

AFL = 0.39 ALR = 2.6 Amps = 0.13 Comparing the values in PMMS with other documents, "AFL" and "ALR" represent full load and locked rotor current, respectively, it appears that " Amps" represents the old horsepower of 0.13. " Amps" should be revised to reflect the actual motor attribute and value.

D. Stroke Time for Valves SQSS*MOV34A and 3QSS*MOV34B Motor operated valves 3QSS*MOV34A and 3QSS*MOV34B have stroke times which are not consistent between Calculation Main 97 Dau ~ 9 and nithmr nnarmentinn ov9 onrL1 A1 AMA 1 nr

'~ ~~ ~

PrWed 10/31/9710:01:15 AM Page 2 of 3

Northeast Utilities ICAVP DR No. DR MP3 0347 MinstDne Unit 3 Discrepancy Report Calculation 89-094120E3 (Rev. O, CCN 4). Celculation 89-094 120E3 is used to size the motor thermal overloads and confirm adequate voltage exists at the motor's terminals. The stroke time in Calculation NM-027 is 40 seconds for these valves. The stroke time in Calculation 89-094-120E3 is 30 seconds and the stroke time in Specification 2362.200-164 Add.1 is 30 seconds (maximum). The 40 second stroke time does not affect the results of the calculation (i.e., the thermal overload relay will not actuate within 5e duty cycle of the valve actuator motor).

In the thermal overload analysis section of Calculation 89-094-120E3, it references Calculation NM-027 as the input source for stroke time. Calculation 89-094-120E3 references Revision 1 of Calculation NM-027, but the latest revision of NM-027 is Revision 2. The latest revision of NM-027 should be referenced.

Review veed invahd Needed Date initiator: Kondell, D. J.

Q Q Q 1o/1597 VT Lead: Neri, Anthony A B O O iG27s7 VT Mgr: Schopfer, Don K g Q Q 10G&97 IRC Chmn: S$ Anand K S O O 10'30S7 Date:

WVAUD:

i Date:

nesOLUTION

Provlously identified by NU7 O Yes @ No Non D6screpent Condition C) Yes @) No Rev6ew g ^= ; ' Not Acceptable Needed Date VT Lead: Nat. Antfxmy A O O VT Mgr: Schopfer, Don K IPC Chmn: Segh, Anand K Date:

st Comments:

l l

1 i

~

Prtnted 1G"11/9710.01:18 AM Page 3 of 3

Northeast Utilities ICAVP DR No. DR MP3-0368 Minstone unit 3 Discrepancy Report Review Group: System DR VAUD Review Elemoed: System Design g Diecipline: Electncel Design Discrepency Type: componert Date Om gg

~

SystemProcess: Rss NRc Sigaditcence level: 4 Date faxed to NU:

Date Putdished: 11/2/97 D6ecrepancy: Motor Curve Discrepancies of RSS Motor Operated Valves Deectlpuon' 1. For motor operated valves 3RSS*MOV23A,3RSS*MOV238, 3RSS*MOV23C, and 3RSS*MOV23D, the Reliance motor curve in the Calculation 89-094-120E3 (Rev,0, CCN 4) shows a locked rotor current value cf 3.5 amperes in the header of the curve and 3.15 amperes in the table of the curve. The value of 3.15 amperes is used in the calculations. The locked rotor current shown in Calculation 89-094-120E3 does not match the values shown in vendor Drawings 2362.200-164-043 (Rev. C) and 2362.200164-043A (Rev. B) (5.0 amperes), Specification 2362.200-164 Add.1 (2.6 amperes), and PDDS (2.6 amperes).

These documents should be revised to reflect the actual motor data.

2. For each motor operated valve, the header on the Reliance motor curve iefers to the insulation as "B" which does not agree with the purchase specifications which require an insulation rating of radiation resistant Class H.
3. In Calculation 89-094-120E3 (Rev,0, CCN 4), the locked rotor current for valves 3RSS*MOV20A,3RSS*MOV208, 3RSS*MOV20C, and 3RSS*MOV200 t sries between 5.25 amperes as shown in the table on the nellance motor curve M2734 (dated 7/25/77) and 5.5 amperes which is shonm on the undervoltage analysis, thermal overload heater analysis, AC motor evaluation checklist, and thermal overload relay checklist of the calculation. However, Calculation 89-094-120E3 only uses the 5.5 ampere value throughout its analyses (i.e., is consistent). This value results in a more conservative but acceptable voltage drop than when using 5.25 amperes. The use of either value meets the requirement that the thermal overload relay actuate before reaching the motor capability.
4. In Calculation 89-094-120E3 (Rev. O, CCN 4) for valves 3RSS*MOV20A, 3RSS*MOV208, 3RSS*MOV200, and 3RSS*MOV200, the Reliance motor curve shows a horsepower rating of 33 and the Limitorque EEQ Walkdown Checklist, motor overioad test record, and molded case circuit breaker test record sheets of Calculation 89-094-120E3 show a horsepower of 0.125 which does not match the value of 0.33 horsepower used in the undervoltage and thermal overioad heates analysis of the calculation. These documents should be revised to reflect the actual motor horsepower.
5. Fullload current can be obtained from tne Reliance motor curve sheet (included in the motor operated valve calculations)

In three places: the table, the header, and the curve itself. The Printed 1001/97 9 Moo AM Page 1 of 3

Northeast Utilities ICAVP DR No. DR MP3-0368 i Millstone unit 3 Discrepancy Report values from these three places are usually different. In most cases, the motor operated valve calculation states that the full load current is obtained from a walkdown reading of the nameplate, therefore the full load current data shown in the Reliance motor curve sheet is not used. However, for valves 3RSS*MOV38A, 3RSS*MOV388, 3RSS*MV8838A, and 3RSS*MV88388 the calculations state that the full load current value was obtained from the Reliance motor curve sheet, but no indication is made to whether tha table, the header, or the curve itself was used to obtain this value. The different full load current values are shown below for these valves:

Valves 3RSS*MOV38A and 3RSS*MOV388:

Reliance Motor Curve - curve = 2.1 amperes Reliance Motor Curve header = 2.3 amperes Reliance Motor Curve - table = 2.1 amperes Value used in Calculation 89-094117E3 (Rev. O, CCN 2) = 2.1 amperes (if 2.3 amperes is used in the calculation, the thermal overload relay actuation time decreases but it still meets the requirement to actuate after the 40 second valve actuator motor duty time but before the motor capacity which is 793 seconds.)

Valves 3RSS*MV8838A and 3RSS*MV8838B:

Reliance Motor Curve - curve = 4.5 amperes Reliance Motor Curve header = 5.2 amperes Reliance Motor curve table = 4.7 amperes Value used in Calculation 89-094112E3 (Rev. O, CCN 2) = 4.5 amperes (if 4.7 or 5.2 amperes is used in the calculation, the results are unchanged.)

The valves listed below show differences between the Reliance motor curve header, table, and curve full load current values, but the full load current value used in Calculations 89-094-332E3 (Rev. O, CCN 2) and Calculation 89-094-120E3 (Rev. O, CCN 4) was obtained from the nameplate (i.e., the Reliance motor curve full load current data was i.ot used in the calculations).

Valves 3RSS*MV8837A and 3RSS*MV8837B:

Reliance Motor Curve - curve = 4.5 amperes Reliance Motor Curve h6ader = 5.2 amperes Reliance Motor Curve - table = 4.7 amperes Value used in Calculation 89-094-332E3 = 4.5 amperes (if 4.7 or 5.2 smperes is used in the calculation, the results are unchanged.)

Valves 3RSS*MOV20A,3RSS*MOV208,3RSS*MOV200, &

3RSS*MOV200:

Reliance Motor Curve - curve = 0.75 amperes Reliance Motor Curve - header = 0.75 amperes Reliance Motor Curve - table = 0.7 amperes Value used in Calculation 89-094-120E3 = 0.75 amperes (If 0.7 amperes is used in the calculation, the results are

,,rwhnnnad \~

~ '

Pnneed 1o/31/97 955 o4 AM Page 2 of 3

A 4

Northeast Utilities ICAVP DR No. DR-MP3 0364 Ministon._ unit 3 Discrepancy Report Valves 3RSS*MOV23A,3RSS*MOV238,3RSS*MOV23C, and -

3RSS*MOV23D:

Reliance Motor Curve . curve = 0.6 amperes Reliance Motor Curve - header = 0.6 amperes Reliance Motor Curve table = 0.55 amperes Value used in Calculation 89-094-120E3 = 0.39 amperes (if 0.6 or 0.55 amperes is used in the calculation, the therma; overioad relay actuation time decreases but it still meets the requirement to actuate after the 60 second valve actuator motor duty time but before the motor capacity which is over 1800 seconds.)

For valves 3RSS*MOV20A, 3RSS*MOV208, 3RSS*MOV20C, and 3RSS*MOV200, Calculation 89-094120E3 (Rev. O, CCN 4) uses different full load current values (0.39 and 39) in the thermal overload heater analysis, AC Motor Evaluation Checklist, Limitorque EEQ Walkdown Checklist, motor overload test record, and molded case circuit breaker test record sheets than shown on the Reliance motor curve. In additlen, the full load current values are different between the calculation , vendor Drawings 2362.200164-043 (Rev. C) and 2362.200-164-043A (Rev, B) (0.95 amperes) and PMM3 (0.39 amperes), These documents should be revised to reflect the actual motor data.

Review Valid invalid Needed Dele Iniliator: Kandet, D. J.

O O O 'o'2 7/S7 VT Lead: Nerl, Anthony ^ 8 0 0 15275'7 VT Mgt: Schopfer. Don K Q Q Q 10/2&97 IRC Chmn: Singh, Anand K Q Q Q 10/3@97 Date:

INVAL10:

Date:

RESOLUTION:

Previously identif6ed by NU7 Q Yes @ No Non Discrepent Condition O Yes @TNo Rev6ew Ace =fd aMa Not Acceptable Needed Date VT Leed: Nort, Anthony A VT Mgr: Schapter, Don K IRC Civnn: Singh, Anand K g

Date:

st Conwnente:

Printed 10/31/97 9 55.07 AM Page 3 or 3

Northeast Utilities ICAVP DR No. DR-MP3-0369 Ministone unit 3 Discrepancy Report Review Group: System DR VALID Potentiel Opetnisty issue Diecipline: Eleeteel Dm%n Diecrepancy Type: Componert Date O vee

@ No SystemProcess: RSS NRC Spacence led 4 Date faxed to NU:

Date Putdished: 11/2/97 -

DiacropeWY: Design Document Discepancies Resulting from RSS Valve Operator Replacements Ducription: Motor operated valves 3RSS*MOV20A,3RSS*MOV208, 3RSS*MOV20C, and 3RSS*MOV200 were changed from the horsepower of 0.125 shown in the original purchase Specification 2362.200-164 Add.1 to 0.33 horsepower. Not all of the design documents reflect the latest changes.

The AC Motor Evaluation Checklist, Limitorque EEC Walkdown Checklist, motor overload test record, and molded case circuit breaker test record sheets (pages 9 through 24 in Attachment 3) of Calculation 89-094-120E3 (Rev. O CCN 4) have not been revised to reflect the changes in horsepower, motor torque, full load current, and locked rotor current to valves 3RSS*MOV20A, 3RSS*MOV208,3RSS*MOV20C, and 3RSS*MOV200, even though these valves were replaced in 1985. The latest change notice (CCN #4) still reflects these pages as valid (i.e., they are not noted as being void nor is there a statement that they will be replaced in the future). Both PDDS and PMMS refer to the replacement valves as being provided by Specification 2362.200-164 Add.1 (same as the originally purchased valves), but this specification still references the horsepower, full load current, locked rotor current, and torque of the originally purchased valves even though the vendor drawings reflect the horsepower of the replacement valves (0.33 HP). PDDS has not been revised to reflect the change in the valves' horsepower, full load current, and locked rotor current. The vendor drawings reference the old torque value (2 ft-Ibs) and different full load and locked rotor currents than the calculation or PMMS.

Calculation NL-038 (Rev. 2, CCN 6) references the old motor (0.13 horsepower and 3.15 locked rotor amperes). These documents should be revised to reflect the latest motor data.

Review Vand Invend Needed Date Initiator: Kendell. D. J. O O O '0SS7 VT l.osd: Nort. Anthony A G O O 0/27/S7 VT Mgt: Schopfer, Don K G O O 1ot2as7 IRC Chmn: segh. Anand K G O O o/30/S7 Date.

INVALID:

Date:

RESOLUTION.

Previously identified by NU7 Q Yee @ No Non D;6,.i--- ;; condition O Yes (9) No

'~

PrnN 10/31/97 9 56.35 AM Pege 1 of 2

Northeast UtilMies ICAVP DR No. DR MP3 0349 M6Istons unn 3 Discrepancy Report n l

% <n,,,3 A=+em e .m - - o j n w:w.A% 4 O O O n meri sonope.r.oon x 0 0 O IRC Chmn: Singh, Anand K O O l Date:

D 0 0 I St Comments: l l

i i

F r

Pnnled 10/31/97 9.56.41 AM P W2

- - . . = , . . . - _ , _ . - - - . _ . . - - _ . _ - _ _ _ _ . . -- .a._.,..- - - _ . . . . . _ .-- - , . . . . _ . - . . . . - - _

Northeast Utilities ICAVP DR No. DR MP3 8372 Millstone unit 3 Discrepancy Report Review oroup: system DRVAuD

"'*"""""8""* F Potenuel operoldmy leave Diecipen: Eintncel Da$n Dietropency Type: Component Date O Ya 4g

~

ayeiswprocese: Rsa Nac sientaconeeimi: 4 Date faxed to Nu:

Date Puheished: 11/2S7

~

Deseropeney: Stroke Time Discrepancies for RSS Motor Operated Valves Dacropeen: Motor operated valves 3RSS*MV8837A,3RSS*MV88378, 3RSS*MV8838A, and 3RSS*MV88388 have stroke times which are not consistent between Calculation NM-027 Rev. 2 /

purchase Specification 2280.050-878 (Rev.1) and motor operated valve Calculations 89-094-332E3 (Rev. O. CCN 2) / 89-094112E3 (Rev. O, CCN 2). Calculation NS027 Rev. 2 and Specification 2280.050-876 have stroke times of 10 seconds but Calculations89-094 332E3 and 89-094112E3 have stroke times which have been revised in CCN 2 to 12 seconds. Since these calculations conside' lon0er stroke times than Calculation NM-027, their results tre conservative.

Calculation NM-027 Is the 90veming calculation for stroke times because the thermal overload setting Calculations 89-094112E3 and 89-094 332E3 reference NM-027 as their input source for stroke time. The stroke times for 3RSS*MV8837A, 3RSS*MV88378,3RSS*MV8838A, and 3RSS*MV8838B are shown in Calculations 89-094112E3 and 89 094 332E3 as 10 seconds in the installed condition and 12 seconds for the proposed valve replacement. Althou9h the 12 second stroke time is shown in Calculations $9-094112E3 and 89-094 332E3 as a.1 input from Calculation NM-027 Rev.1, a review of NM-027 Rev. 2 ' hows that the stroke time is still 10 seconds. Therefore, Calculations 89-094112E3 and 89-094 332E3 do not agree v.ith the value of stroke time used in Calculation NM-027 nor do they reference the latest revision (Rev. 2) of Calculation Nhn 027.

Review Valid invol6d Needed Dele initiator: Kondell D. J. @ Q Q 10/1697 VT Lead: Nort. Anthony A O O O $$7757 VT Mor: Schop:ar. Don K Q Q Q 10777 t C chmn: Singh, Anand K Q O O 1ocaS7 Date:

INVAllD:

- Ode:

RESOLUTION:

Previounty ident6aed by Nu? O Yee (G) No Ncc Descrepent Condnion O Yee [h~o Review g Acceptelee Not ^ = , __ Needed Date VT Leed: Nwl. Anthony A O O O VT Mgr: schopfer. Den K b inc chran: sineh. Anand K O O O Printed 1o01/97 o Sa 16 AM Pope 1 of 2

- ~. . _ -. .- _ - _ _ - . _ . = . _ - - . - - . - _ - .. - - . --

1 Northeast UtilRies ICAVP DR No. DR44P3 0372 umstone unM 3 Discrepancy Report  ;

O O O '

' Date:

SL Comments:

e l

f Printed 1001/97 9.58.22 AM Pag)2 of 2

, . .._. - - -,_ -. _. ,, - __ ..=.

Northeast Utilities ICAVP DR No. DR MP3 0375 umstone Unit 3 Discrepancy Report Revtow Group: system DR VAUD w tieninae syeeem %

"'" *""** E'"'* * " *" O Ya D6=repency Type: component De 4 g, systemfrocese: $WP NRC s', 7 m level: 4 Date faxed to NU:

Date Published: 11/2/J7 Discrepency: Design Document Discrepancies Resulting from SWP Va've ,

Operator Replacements Dacripe6en: Motor operator valve 3SWP'MOV115A was changed from the original purchase Specification 2282.400 568 Add. 3 from 0.13 to 0121, horsepower. Not all of the design documents reflect the  !

latest changes.

The AC Motor Evaluation Checklist, LimHorque EEQ Wolkdown Checklist, motor overioed test record, and molded case circuit breaker test record (pages 25 through 28 in Attachment 3) of Calculation 89-094122E3 (Rev. O, CCN 4) have not been revised to reflect the changes in horsepower, full load current, and locked rotor current from 0.13 HP,0.45 amperes, and 3.15 amperes, respectively, to 0.125 HP,0.6 arnperes, and 3.5 amperes for valve 3SWP*MOV115A. Both Plant Design Data System (PDDS) and Production Management Maintenance System (PMMS) refer to the replacemer. valve as behg provided by Specification 2282.400 568 Add. 3 (Rev.1) (same as the originally purchased valves), but this specification and the vendor Drawing 2282.400 568 968 still reference the -

horsepower, full lead current, and locked rotor current of the originally purchased valves. Neither PDDS nor PMMS have been revised to reflect the change in the valves' horsepower, full load current, and locked rotor current. Calculation NL-038 (Rev.

2, CCN 6) still shows the old horsepower and locked rotor current and the fuse list SP EE 346 (Rev.1) still shows the old

, horsepower. These documents should be revised to reflect the j latest motor data.

Rev6ew Vehd inval6d Nooded Date inpistor: Kendel,D.J.

O O O $ 07/87 YT Lead: Nort, Anthony A Q Q Q 107t/97 VT Mgt: schapter, Don K o2in7 G O O BRC chmn: Singh. Anand K G O O ' S'30'87 Dele:

INVAUD:

i _

Date:

REsOLimoN:

Pronously identined by Nu? Q Yes 4. No Non Discrepent conottkm O Yes @ No Rev6ew Acceptable Not Acceptable Needed Date Innistor. (none) .

VT Lead: Nort. Anthony A '

_; Prtnted 1011/97 to 03.oS AM Page 1 of 2

. .ew

%% dst Utilities ICAVP DR No. DR44P3 0375 ,

umston Unit 3 Discrepancy Report VT Mgr Schopfer, Don K O g MC Chmn: SWqph AreWK O O Oste:

SL Comments:

Prtnied 10'31/97_10 03.11 AM P92W2

e  !

o 3 Northeast Uuuties ICAVP DR No. DR MP3 0421 l umotone unit a Discrepancy Report neview oreup: syneem onVAun i noview elemose: system Design

""*""'"'*""*"'D"*" O Ya ,

Osseroponey Type: caicusseen systenWPreer s: sWp g g,  !

Nnc sientacenselevel:4 Date faxed to NU:

f Date puheished: 11/2 s7 Deserepeney incorrect fluid properties were used/ interpolated in various

- calculations. ,

Dooeripeten: Several calculations that wem reviewed were found to be using -!

incorred fluid properties. These discrepencies are as follows:

Calculation 94 ENG 1036-M3 rev. 0, Page 19: The density for water O 95'F is 62.05 lbm/cu. ft not 62.2 as stated.- Pages 22, 23,32 and 33: The dynamic viscosity determined for both shell ,

and tube side paremeters varied from the given reference for the temperatures noted. The tube side properties for sea water were not consistent with the reference for the given temperatures.

Also the density determined on pages 32 and 33 for the shell side were incorted for the given temperatures. l Calculation 94-ENG 1037 M3 rev. O, Page 14: The density used for water 9130'F is not corred from the noted references in the calculation. Page 16: The dynamic viscosities noted for the shell and tube side parameters do not coincide with values interpolated from the references.

Calculation 94-ENG.1038-M3 rev. O, Page 14: The density used for water g 130'F is not correct from the noted references in the calculation. Page 16: The dynanilo viscosities noted for the shell and tube side parameters do not coincide with values interpolated from the references.

Calculation 91 BOP 783-ES re v. 2, Page 18: The tube side fluid properties do not coincide with those interpolated from the references.

  • Calculation 91 BOP.789-ES rev. 2, Pages 19 and 20: The tube and shell side fluid properties do not coincice with those interpolated from the references at the given temperatures.

Review Volui invalid Needed Date initieten Dionne.B.J- 0 0 O 10/1057

. VT Lead: Neri. Armony A O O O **7 viuen re,oen x 0 0 O tor 20e7 IRC Chmn: singh, Anand K : -O O O $0'3057 Date:

INVAUD:

Date:

REs3LUTloN:

l pwvleuelyidentines e by NU? . Q Yee - @ No Non Dioerspent Condit,on U Yes @ No 1- preens torstm 100:57 AM pese 1 or 2 h~w

,- 3-- e,-

,- yw r +y-y-,-~w.-.-.rm,,,m.awwh m- w -y , e - m m, w v- y m .v,--U 4,,, - -  % . -+ w , , . . - -- .4 - --.-s -- -. .----

ICAVP DR No. DR44P34421 Northeast Utilities Millstone unit 3 Discrepancy Report R

Acceptable Not A-:-: ;t"- Needed Date VT Lead: Nat, Armony A O O O VT Mgr Schopfer, Don K IRC Chmn: Singh, Anarul K Date:

SL Comments:

Prtnted 10"J1/9710 04 04 AM - Page 2 of 2

Northeast Utilities ICAVP DR No. DR MP3 0448 Millstone Unit 3 Discrepancy Report Review Group: System DR VALID Review Element: System Dosagn Potentkl OperatiMy keue Diecipline: I & C Deelen Diecropency Type: Drewing O va system 9rocess: RSS gg NRC significance level: 4 Date faxed to NU:

Date Put:46ehed 11/297 Diecrepency: Discrepancy Between FSAR and P&lD Deee v ion: Section 6.3.5.2 of the FSAR states that racirculation pump discharge pressure indication is provided at the discharge of each pump and in the control room, P&lD EM.112C 16 shows a pressure indicator in the control room for each pump dlJcharge pressure; there is no local pressure indicator shown on the P&lD. Electricalloop schematics 3RSS-025A, Rev 2; -0258 Rev 2; -0250, Rev 2; 025D, Rev 2 agree with the P&lD and show no local pressure indicator, Review Valid invalid Needed Date initiator: Pineles H. G O O 10 S 87 VT Lead: Neri, #sthony A B D O $0'16S7 VT Mgr: Schopfer, Don K G O O Sow'7 1RC Chmn: Singh, Anand K O O O ' S*'7 Date: .

INVALID:

Date:

REs0LUTION:

Previously ident6 fled t>y NUf Q Yes @ No Non D6ecceper.t Condition O Yes @ No Review

^ = -

  • Not Acceptable Needed Date VT Lead: Neri, Arthony A O O O VT Mgr: Schopbr, Don K IRC C.Nvvi: Singh, Anand K O O O note:

st Comments:

Prtnled 10'31/971004 do AM Pope 1 c' 1

- _ - _ - . . _ ~

o Northout Utilities ICAVP DR No. DR MP3 0443 Mistetone unit > Discrepancy Report Review oroup: system on yAuo 3

Potential Operetnimy issue M .a DedricW Desen O vee D6ecrepency Type: Cormonard Date

@) No systowProcese: oss NRC SW"?-ce level: 4 Date Faxed to NU:

Date published: 11/247 D6 crepency: Design input Discrepancies involving 4KV Motors De*cr6 P 44an: 1, in Calculation NL 033 Page 17 (Rev. 3, Rev.1), the brake horsepower M for motor 30SS*P3A is 380. Specification 2214.602-040 Aud. 8 (" Centrifugal Pump Data Sheet") uses 386 as the brake horsepower. Using the data from the Installation, Operation and Maintenance Manual OIM-009-007A, Performance Curve 721,7C4 and the test log in Attachment B of Calculation NL 033, the brake horsepower is 386 [(4000 gpm

  • 291 ft ' 1.0 SG) / (3960
  • 0.760)]. (The pump curve in Calculation NL 033 Attachment B is in increments too small to accurately determine the brake horsepower.) The value of 380 used in Calculation NL 033, and subsequently by Calculation SP.

MS-EE 342 (Rev.1), leads to less-conservative results than if the vendor supplied value of 386 was used. The effed of using 386 BHP instead of 380 BHP does not affect the results of Calculation NL 033 as it increases slightly the steady state KW load by 5 KW to 5147 KW, which is within the emergency diesel generator's rating of $221 KW, Calculation NL 033 should be iev;4ed to reflect a BHP of St.6 for 3QSS*P3A.

2. In the OPAL database Calculation 6P M3-EE 342 (Rev.1),

Section 3.5 (Load Data Table), the BHP used for the QSS and RSS pump motors is the rated or normal BHP (380 and 450, respectively) but the BHP for the SWP pump motors is the maximum BHP (561). In Calculation SP M3 EE 342, Section 4.9 (Motor Data Log), the BHP used for the QSS and RSS pump motors is the maximum BHP (470 and 458, respectively) but the BHP used for the SWP pump motors is the rated or normal BHP (555). The calculation should be revised to be consistent in its use of BHP for the 4KV QSS, RSS, and SWP motors.

Use of the maximum BHP will provide more conservative results than using the rated BHP. Maximum BHP is not required for loading studies at this time because: 1. Calculation SP M3-EE.

342 is not set up for emergency diesel generator loading (which might require the maximum BHP if it does not model all QSS, all RSS or all SWP pumps as 'on"); 2. Calculation NL 038 (Rev. 2, CCN 8), which is used to determhu, voltage levels at electrical gipment, models all 4KV QSS, RSS, and SWP pumps on at b same time (i.e., the model does not require the maximum BHP for a "run out' operating condition), therefore, use of rated BHP is appropriate, Review vand inve86d Needed Date initiator: Kennes.D.J. O O O 'ortSS7 vitoes: N-i Areony ^ O O O N S7 VT Mer: Schopfw, Don K O O O 1:n657 PrNed 10/31S7 to06-21 AM Pope 1 or 2

Northeast Utilities ICAVP DR No. DR MP34463 Millstone Unit 3 Discrepancy Report WIC Chmn: SWgph, Atwas K Q 10/3097 Q Q l

Date:

WWAUO:

Date:

fttSOLUTION:

Previously hientmed by NUF Q Yee te) No Non D6ectopant Conetton O Yee it) No lleview Ae++ h Not ?-:-: " '

Needed Date initiator (none)

VT Lass: Nat, Anthory A O O O VTby: Schopfw, Don K O O O MC Chmn: S6ngh, Anand K Date:

SL Comments:

l l

i i

Petited 10314710 06.26 AM Pope 2 of 2

DR No, DR4P34444 Northeast Utitulen ICAVP l naastorm unu 3 Discrepancy Report l moview etemp: synom DRyAun ,

neview samment: syneem Design

,g Diecipane: Eiseertosf Desi'"

Ow '

Disorgency type: cemenws One g g, r syseenveresseer swe M Signiseenee twel: 4 Date faxed to NU:

Date Puedshes: 11/b97 7- . -r. Vendor and NU Database Discrepancies for SWP Non.

Reversing Motors

^

t . A. NU Database Discrepancies 1, Production Maintenanos Mana0ement System (PMMS) shows two entries for horsepower for motor 3SWP*P18: 600 =

  • and 885. Specification 2441.003-000 (Rev. 2), One Line >

Diagram EE 1N (Rev. 9), and the Plant Design Data system (PDDS) show 600 horsepower, as well as the calculations. The reference in PMMS to 885 HP should be deleted.

2. For motors 3SWP* STRIA,38WP*STRIB,3SWP*STR10, and SSWP*STR10 Production Management Maintenance System (PMMS) shows three current entries for two current attributas:

38WP*STRI A/L: ALR = 2.15, AFL = 10, Amps = 1.3 38WP' STRIA: no values Olven 38WP*STR18: AFL = 10, Amps = 1.3 38WP*STR1C: AFL = 10, Amps = 1.3 38WP*STR1D: AFL = 10, Amps = 2.15 Specification 2332.515 063 Add. 4 and Vendor Drawing 2332.515-063 005B indicate that the full load current (assumed to be *AFL' In PMMS) is 2.15 amperes and the locked rotor current (assumed to be 'ALR* In PMMS) is 10 amperes. These dont match PMMS values above, in addition, the specification and vendor drawing also show the horsepower to be 1.3 (as does Plant Design Data System (PDDS)), but PMMS shows either a value of 1.4 horsepower (for 3SWP*STRI A/L and 38WP*STR10) or nothing (as in the case for SSWP'STRI A, t 38WP*STR18, and 3SWP*STRIC). PMMS should be revised to refied the actual motor attributes and values.

3. For motors 3SWP* STRIA,3SWP*STRIB,3SWP*STRIC, and 3SWP*STR10, the insulation is shown in Plant Design Data

- System (PDDS) as Class H but is shown in the motor data sheet of Specification 2332.515-063 Add 4 as Class B.

. B. Vendor Drawings

~

Petnand 10'3147 to06:01 AM Page 1 or 3 -

wg--w-,,ec- w- -, w-g w---w--g-vyyc- w-vm--- yvprWg

ICAVP DR No. DR MP3 0444 Northeast Utilities Mitiste,ne Unit 3 Discrepancy Report

1. For motors 3SWP*P3A and 3SWP*P3B, vendor Drawings 2332.502 042-018A and 2332.502-042 019A ref$r to the i insulation class as 'H* which disagrees with the Class B rating shown in Specification 2214.432-042 Add.1 (Rev.1) and Plant Design Data System (PDDS). (Note that PDDS references 2214.432-042 as the P.O. even though the veredor drawing number has the base number *2332.502* which is associated wMh the Service Water Pump P.O.)
2. Motors 3SWP*P2A and 3SWP*P2B are included in purchase Specification 2214.432-042 Add.1 (Rev.1). The motor data sheet (Page 217 of the specification) has data which is different than either Vendor DrawinD 2332.502 042 019A or Vendor Drawing 2332.502 042-012A. The data which is different is:

Specification 2214.432-042 fullload current = 13.6 amperes; locked rotor current = 81.3 amperes; frame = 215T; speed =

1745 RPM; insulation = B Vendor Drawing 2332.502 042 019A fullload current = 13 amperes; locked rotor current = 78 amperes; frame = 254T; speed = 1760 RPM; insulation = H ,

Vendor Drawing 2332.502 042-012A fullload current = 13.5 amperes; 'ocl** eotor current = maximum of 6 times full icvf current; frame !15; speed = 1745 RPM; Insulation = 8 The two vendor drawinos are identified with the same Westinghouse S.O.#, Mark #, and Customer Order W.

The data for currents and insulation class in Plant Design Data System (PDDS) and Production Management Maintenance System (PMMS) match the specification, but the data for speed matches Vendor Drawing 2332.502 042 019A (PDDS and PMMS do not have data for the frame).

Neither vendor drawing is identified as " superseded *.

These documents should be revised to reflect the actual motor data.

Review vead invead Needed Date hinator: Kendeu.D.J. O O O io/17/87 VT Lead: Nerl. Anthony A Q Q Q 1o/27/97 VT Mgt: Schopfer. Don K Q 10/2&S7

_Q Q MC Chmn: Singh. Anand K Q Q Q 10:30r97 Date:

wwAuo:

Dele:

ResottmON: '

. ..c . _ --, identened by Nur U yes (e) No Non Descrepent Condition U Yes @ No Printed 10"J1/9710 06'o7 AM Pege 2 or 3

ICAVP DR No. DR44P3 0444 Northeast Utilities M6sistone Unit 3 Discrepancy Report R

Acceptahne Not Acceptabis Needed Date Init6ators (nons)

W Lead: Nwl,Am W A O O O .

t W Mgr: Schop8et, Don K O O O IRC Chmn: Singh, Anand K b

Date:

SL Comments:

l Printed 1G1147100609 AM p ,

4 T~

ICAVP DR No. DR MP34447 Northeast utstles umetone Unit 3 Discrepancy Report nev6ew ocoup: syenem on vAuo ne*w Element sresem Design , op,,,,,,,,,,,,

06scipline: Electrical Design O vos Diectopency Type: Component Date

@ No systemProcess: SWP NnC signercance level: 3 Date faxed to NU:

Date Published: 11/2/97 06screpency: Calculation Discrepancies involving SWP Non-Reversing Motors tascripa6en: 1. Calculation SP M3-EE 342 (Rev.1) assumes that. *where B.H.P., efficiency, power factor and rated voltage values are not available from the project documentation' (Appendix B. Page B2), brake horsepower (BHP) is equal to the nameplate horsepower, efficiency is 0.92, and the power factor is 0.88 for 460V motors. However, for the following 460V motors, the project documentation is available for this data but was not used

> in the calculation:

Motors 3SWP*P3A and 3SWP*P3D have an efficiency of 0.84 and a power factor of 0.88 as shown in Plant Design Data System (PDDS) and a BHP of 7 as shown in Specification 2214.432-042 Add.1 (Rev.1) and PDDS.

Motors 3SWP*P2A and 3SWP*P2B have an efficiency of 0.84 and a power factor of 0.80 (per Vendor Drawing 2332.502-042 012A) or 0.82 (per Specification 2214.432-042 Add.1 (Rev.1)

Page 217 and PDDS). These motors have a BHP of either 7.55 (per Specification 2214.432 042 Add.1 (Rev,1) Page 217) or 7 (per PDDS).

Motors 3SWP*STRI A,3SWP*STRIB,3SWP*STR1C, and 3SWP*STR1D have an efficiency of 0.79 and a power factor of 0.77 as shown in Specification 2332.515-063 Add 4.

Since the actual brake norsepower of 3SWP*P2A,3SWP*P28, 3SWP*P3A, and 3SWP*P3B is less than thet assumed in the calculation, the results of Calcu!ation SP M3 EE 342 are conservative. The data listed above for SSWP*STR1 A, 3SWP*STRIB,3SWP*STR10, and 3SWP*STR1D have no effect on the results of the calculation.

Since the actual motor data is available, either Calculation SP-M3-EE 342 should be revised to reflect this data or the statement in Appendix B Page B2 of Calculation SP M3-EE 342 should be revised.

2. There is a discrepancy in the minimum required voltage for 3SWP*TV35A and 3SWP*TV358. Calculation 209E (Rev. O, CCN 2) Page 8 states that the minimum required voltage is 97 volts (this value is discussed in the telephone memora., "um attached to Calculation 209E as Page 79). Specification 2472.110-185 Add.1 (Rev. 4) Page 1 12 requires that the motors operate with a minimum required voltage of 85% of rated Printed tof31/9710.07.00 AM Page 1 of 3

O Northeast Utilities ICAVP DR No. DR-MP3 0447 Millstone Unit 3 Discrepancy Report l value, which equates to 102 volts. This is the value that is used  !

In Calculation 210E (Rev. O, CCN 1) Page 86. These calculations should be revised to refied the minimum rated voltage. Since these sduators were procured from the same ,

i vendor and specification, their ameptance criteria should be identical.

The minimum calculated voNage for motor 3SWP*TV358 is i 104.8 volts as shown in Calculation 209E Page 6. The vohage used for MCC 3EHS*MCC182 (which feeds 3SWP*TV358) is shown as 430 volts (Page 8 of the calculation), but Degraded Voltage Calculation NL-042 (Rev. 2 CCN 5) now shows this MCC to have a voltage of 424.8 volts. Using the NL 042 MCC voltage results in a motor terminal voNage of g9.6 volts, which satisfies the minimum voltage requirement of 97 volts shown on Page 6. l l

The minimum calculated voMage for motor 3SWP*TV35A is l 102.5 volts as shown in Calculation 210E Page 86. The voltage l used for MCC 3EHS*MCC1 A2 (which feeds 3SWP*TV35A) is shown as 434 volts (Page 6 of the calculation), but Calculation NL-042 now shows this MCC to haw a voltage of 427.9 voHs. I Using the NL 042 MCC voMage results in a motor terminal l voMage of 96.4 volts, which does not satisfy the minimum l voltage requirement of 102 volts shown on Page 86 of l Calculation 210E nor does it satisfy the minimum voltage I requirement of 97 volts shown on Page 6 of Calculation 209E.

Note that Calculations 209E and 210E state that the calculation of record that determines the MCC bus voltages is NL-038. It appeam that Calculations 209E and 210E should be revised to use Calculation NL-042, which provides lower minimum voltages and is more conservative than Calculation NL-038, and not NL-038 for determining the MCC bus voltages.

3. For motors 3SWP*P1 A,3SWP*P18,3SWP*P1C, and 3SWP*P10, Calculation GM-60-03.405CA (Rev.1) shows an acceleration time of 6 seconds for a minimum starting voltage of 70% of rated voltage. This does not agree with the 5 second acceleration time shown in Specification 244t003-009 (Rev. 2)

Page 2 8 (the 6 second acceleration leads tu more conservative results in Calculation GM-60 03.405CA).

4. Calculation NL-033 Rev. 3 Page 17 shows two entries in the

" Safety Related Pump Table

  • for 3SWP*P1 A/C. The first entry (the one with BHP = 591 and kW = 469) should read 3FWA*P1 A. This has no effect on the resul4 of the calculation for the service water pumps because only the data from the second entry was used in tha calculations.

Review valid invand Needed Date inetisten Kendas.D.J. O O O tor 27/97 VT Lead: Nort, Anthony A G O O to/27/e7 PNnted 1o/31/9710.07:06 AGI' "' ' ~ ~ ~ ' ~ ~ Page 2'or 3

Northeast Utilities ICAVP DR No. DR44P34447 Minstone unN 3 Discrepancy Report VT Mgr Schopfw, Don K O O O ia2aS7 MC Chmm: Singh, Anand K Q 10PJQ97 Date:

WNAUD:

Date:

Rit0LUTION:

Previously identWied by NUP C) Yes T No Non D6eerspent Conetton C) Yes ($1No Rev6ew a -

y _a... y .- m m VT Lwl: Neri, Anthony A O O O VT Mort Schopfer, Don K MC Chmn: Singh, Anand K O

O -

Date:

EL Comments:

i l

(

l l

l l

Printed 10'31/971007:09 AM Page 3 of 3

e ICAVP DR No. DR MP34468 Nwtheast Utilnies Millstone Unit 3 Discrepancy Report Review Group: System DR VALID I

Potential Opereldtery leeue Olseiptine: Electnoel Deegn O vee EP r ; my Type: Component Oste gg aystewProcese. .:ss NRC sign'.ncence level: 4 Date faxed to NU:

Dale Putdished: 11/297 D6ecrepency: Calculation D!screpancleo involving RSS Non-Reversing Motors Descripason: 1. For motors 3RSS*P1 A,3RSS*P18,3R3S*P10, and 3RSS*P10, the locked rotor current in Calculation GM 03.409CA (Rev.1) is based on KVA Code Letter *F*, This code letter disagrees with the KVA Code Letter *D'shown on Page 5-14 of Specification 2214.802-044 (Rev.1), however since the calculation's value is greater than the specification's, the results of Calculation GM-60-03.409CA are still valid.

2. For motors 3RSS*P1 A,3RSS*P18,3RSS*P1C, and 3RSS*P1D the vendor motor curve 2214.802 044 023A shows an acceleration of 3.2 seconds for 70% of rated voltage. This agrees with Specification 2214.802-044 (Rev.1). Calculation GM-60-03.409CA (Rev.1) shows an acceleration of 3.2 seconds for 80% of rated voltage, therefore the acceleration is at a different voltage. The documentation should be revised to reflect the voltage associated with a 3.2 second acceleration (if 80% is the appropriate minimal voltage, then the
  • minimum acceptable voltage" of 70% of nameplate voltage listed in Calculation NL-038 Page 13 needs to be revised). Either voltage ,

is technica!!y acceptable as the minimum voltage because the minimum voltage at 3RSS* PI A,3RSS*P18,3RSS*P10, or 3RSS*P1D is 3382 volts (reference Calculation NL-038, Rev. 2 CCN 6, Mode 7 Run 609) which is 85% of rated voltage.

3. Cfculation SP M3-EE 342 (Rev.1) states as an assumption that, 'where B.H.P., efficiency, power factor and rated voltage values are not available from the project documentation" (Appendix B, Page B2), brake horsepower (BHP) is equal to the nameplate horsepower, efficiency is 0.92, and the power factor is 0.88 for 460V motors. However, for the 460V motors 3RSS-P2A and 3R9S-P28, the project documentation is available for this data but was not used in the calculation. The data for these motors is 7.3 BHP normal / g.15 BHP maximum, a power factor of 0.87, and an efficiency of 0.84 (reference Specification 2225.202 050 Add. 6 Page 2-47 and PDDS), Since the actual brake horsepower is less than that assumed in the calculation, the results of Calculation SP M3-EE 342 are conservative.

However, since the actual brake horsepower is known, either it should be used or the statement from SP M3 EE 342 should be revised.

Review Valid invalid Needed Date initiator: Kondel.D.J. Q Q Q 10/1697 VT Leed: Nort, Anthony A Q Q Q 1o/27/97 VT Mgr: Schopfer. Don K Q Q Q 10/26/97 Printed 1o'314710:07.32 AM Pope 1 of 2 Mw, e , * -e

ICAVP DR No. DR MP3 0444 Northeast Utilities Milletone unit 3 Discrepancy Report IPtC Chmn: Singh. Anand K O O O '0'30'7 Date:

IWALID:

Dele:

RESOLUTION:

Previeve6y identened try NUT Q Yes '

s) No Non D6ecrepwd Condition Q Yes @ No Review A~$ h Not Acceptable Needed Date VTLead: Nort, Ardhony A vr me n see.r.oonK g O g IftC Chmn: Singh Anand K Dais:

O b O SL Commente:

Printed 10/31/9710 07,39 AM Page 2 of 2

=- we y- -

W q- w y- == -g- v .py-- .m ----s -w wm ,.em- .e- w-ww -~ -

  • T-- g e v 3-.ame a -- .- e.-

1 O

Northeast Utilities ICAVP DR No. Dit MP34445 Mienstone Unit 3 Discrepancy Report Review oroup: conf 9urmen onvAuo Review Element: sys6em insteasten j 06.c6ps6ne: omwice D *'"

O vee l' Diecrepency Type: Instensten implementaten gy g system 9tocess: sWP NRC sWacame levd 4 Date FAXedio NU:

Date Pubilehed: 11/297

~

Diecrepeacy: Installation not in accordance with design documents Deecript6en: The following configuration deviations from riesign documents were noted during system walkdowns:

1. Conduit support CB 532 is used to support a 4' Fire Protection i pipe by the attachment of 1/2' ATR to the bottom member.

General Note 16 on DWG BE 52AP 7 says ' Piping -SHALL NOT BE SUPPORTED ' by conduit supports.

2. The field installed support shown on Conduit Support Log CB-532 Rev. SA, does not match drawing. The attachment ')f the vertical legs is not consistent with the standard detail Cyawing BE 52RA, Rev.4.'
3. Installed conduit support CB 788 is not consistent with Conduit Support Log CB 788, Rev. 5. Item 'AU'is not installed on the tube steel member. This support is s'.andard detail type WW as shown on Detail drawing BE 52 WW Rev. 3. The standard detail does not show items BQ or HB identified on the CSL as attemates to the *HC' and 'AU'shown on BE.52 WW detail,
4. The Cable and Raceway Progism (TSO2) lists conduit 3CC661NO2 as aluminum. Conduit Support Log CB 2817, Rev.

6, and field observation indicate steel was installed.

5. The Cable and Raceway Program (TSO2) lists conduit 3 CL410PK as aluminum. Conduit Suppert Log CB-1000 Rev 6 and field observation Indicate steel was installed.
6. The Cable and Raceway Program (TSO2) lists conduit 3CX956PBY as aluminum. The Conduit Support Log indicates steel. Field observation confirmed steelwas installed.,
7. The Cable and Raceway Program (TSO2) lists conduit 3CC956PD as aluminum. Conduit Support Leg CB-6577 Rev 1 A indicates steel. Steel confirmed installed.
8. The Cable and Raceway Program (TSO2) lists all 4 conduit on support CB=6468 as aluminum. Conduit Support Log CB4466 Rev 3 indicates these conduits are to be steel. Steel confirmed installed. Further, the span between supports on the 3/4' conduit attached to support CB-6468 exceed allowable for type of support.
9. The Cable and Raceway Program (TSO2) lists conduit 3CX956PBS as aluminum. Conduit Support Log CB-6273 Rev 6A indicates the conduit is steel. Steel con'irmed installed. The Printed 10'31/97 to De 27 AM Prse 1 or 4

l i

l

' DR No, DR MP34446 Northeast Utilities ICAVP milistone Unit 3 Discrepancy Report CSL shows conduits 3CC442PD7 and 3CC956PC1 as Steel. The i Cable and Raceway Program USO2) list each as aluminum. _

Aluminum confirmed installed.

10. Installed suppurt CB4216 Installed as described on Conduit Support Log CB4216 Rev 3, does not match details of the standard support type WV as specified in Standard Detail drawing BE 52 WV Rev . 5.
11. The Cable and Raceway Pro 0 ram (TSO2) is not consistent with Conduit Support Log CB4182 Rev.1 and field conditions; cunduit 3CX9500J ls steel, not aluminum; conduit 3CX9500A is 1 1/2'steei, not 2' aluminum. Further The conduit span lengths to adjacent supports exceed allowable as established on standard drawing BE 52CA.
12. The Cable and Raceway Program (TSO2) lists conduit 3CX9500Je as aluminum. Conduit Support Log CB4154 Rev 2D shows steel. Steel confirmed instailed in the field TSO2 lists 3CC956NH7 as aluminum. The CSL shows steel.

Aluminum confirmed installed.

13. The Cable and Raceway Program (TSO2) lists conduit 3CC9500A as aluminum. Conduit support Log CB4142 Rev 4A shcws steel. Steel confirmed installed in the field.
14. The Cable and Raceway Program (TSO2) lists conduits 3CX956NC7 and 3CX956NB5 as aluminum. Conduit Support Log CB4102 Rev, shows steel. Steel confirmed installed in the field.
15. The Cable and Raceway Program (TSO2) lists all 8 conduits as aluminum. Condult Support Log CB 516 Rev 50 shows all 8 as steel. Only conduit 3CX519A1 is aluminum, other 7 are steel as verified by field observation.
16. The Cable and Raceway Program USO2) lists conduit 3CC956PF as aluminum. Conduit Support Log CB-3915 Rev i shows this conduit as steel. Steel confirmed installed.
17. The Cable and Raceway Program (TSO2) lists conduit 3CK9500A2 as aluminum. Conduit Support Log CB-3842 Rev l 1shows steel. Steel confirmed installed in the field.
18. Conduits 3CC4380C,3CL961NL1 and 3CL961NM1 do not l attach to member 'F' as indicated by Conduit Support Log CB.

l 1210 Rev 7A. Conduit 3CH40908 attaches to member 'A*, but is not Indicated on CSL Conduit 3CL4110J is not in the Cable l and Raceway Program (TSO2).

19. Several PS204 and PS202 members are attached to the l South Vertical Leg of support C 201 106. The design drawing for this support (EE 34KA Rev 3) nor any of the open change l documents listsd for this drawing can be confirmed to direct l these installations.

j Prtnied 10'31/97 t o 06.32 AM Page 2 cf 4

O Northeast Utilities ICAVP DR No. DR-MP34445 i

Millstone unit 3 Discrepancy R6rport

20. Cable Ladders were installed on the East leg of support C227 158 (Reference drawing EE 34KDRev. 4). A review of the design documents did not identify the approval documents for ,

these additions.

21. Several PS204 horizontal members are installed on each verticalleg of support C274 273 (Reference 34KD Rev. 4). No .

design documents could be found to authorize these additions.

22. Change Cr'ntrol Document T E 08011 added four horizontal -

shelves to support C302BC')5 (reference drawing EE 34KN Rev.

3) but incorrectly lists their size as E36. The correct member designation is E39 based on field measurement.
23. A PS204 and a PS202 member have been added to support C302 B-055 without identification on any design documents; referersce drawing EE 34 KN Rev. 3.
24. The floor connection of the north vertical leg of support C345-040 is not an imbedded plate as called out on drawings EE 34KS Rev. 2 and EE 34JB Rev. 6. It is a concrete expansion bolt plate.
25. The East verticalleg of support C359-011 as shown on drawing EE 34KV Rev. 3, has eight cable ladder members installed. No design documents can be verified to authortze theses members.
26. Raceways 3TK407P and 3TK406P are listed in The Cable and Raceway Program (TSO2) as being supported by support C072B-001. The tray support location drawing, EE 34DN Rev.

11, does not show this support.

27. Conduit 3CX4010F (/dia.) is attached to the bottom member of support C119177. No design documents cotJd be located to document this attachment of condult.
28. F E 17180 addresses the Installation of two 4 inch conduits to support C022B-352. Conduits were not found on this support in field walkdown.

Review Valid invalid Needed Date Inalaton sevw T.L 0 0 O $o/57/S7 vit.ned: Nwt. Anthor.y A Q Q Q 1o/27/97 VT Mer: Schoprw. Don K 1o/28,97 Q Q Q IRC Chmn: Sineh, Anand K O O O ISSS7 Date:

! INvAuo:

l o ,,,:

Resolution:

Previously identmed by NU7 O Yes @ No Non Discrepent Condition O Yes @ No Printed 1oo1/97 to o634 AM Page 3 or 4 L

m. . . . ~

,.,,,.-e. .- -- , . , , , , , - - - , , ,--. -,_, - , , ,

Northeast Utmtles ICAVP DR No. DR MP3 0445 ,

Mmetone unn s Discrepancy Report  !

Review A""- Not Acceptable Needed Date m;g VT Lead: f6v1, Aremny A O O VT Mgr Scampfer, Don K O O mc chmn: sv. Anana K O , 8 O _ O Date:

SL Comments:

Prtreed 1011/97 to 06 36 AM p ,,,4 ,, 4

0 Northeast Utilities ICAVP DR No. DR MP3-0488 umstone unit 3 Discrepancy Report ReviewOroup ConAgurohon DRVAUD 3

PeterWiel Operandoity laeue Diecipline: Doctncel Dee"

Diecrepency Typer Drewwg O Ya (G0 No ayele WProceae: SWP ~

NRo "'Twa level: 4 Dese Faxed to NU:

Dele Published: 11297 D6e*repeary: Upper / Lower Tier Tray Drawing Differences Deecription: 1 The following differences were noted in the tray support drawings'

1. Drawing EE 34DL Rev 12 shows a support 8' east of Column Line A snd on Column Line $2 is shown as C274A 273. The ,

Cable and Raceway Program (TSO2) lists this support as C274-273.

2. Drawing EE 34DL R6v 12 snows Section View 3 3 as being found on drawing EE 34KD (D-4). The section is not on that drawing
3. The Cable and Raceway Program (TSO2) lists C266-207 as support for tray 3TC4260. Support not located in area of tray per drawing EE 34DL Rev 12. Field walkdown of this support confirmed that support does not support tray 3TC4260.
4. The Cable and Raceway Program (TSO2) does not list supports C3028-55, C303 70 and C345-40 as supporting tray 3TC4510 as is shown on drawing EE 34DL Rev 12.

! 'i, Support CO228 352 as shown on drawing EE 34DN Rev.11 ls listed as CO22 352 in the Cable and Raceway Program (TSO2).

The CO228 352 designation is correct.

Review Val 6d love 46d Needed Date inM6etor: Server. T. L Q Q Q 10/1597 VT Leed: Nort, Anthony A Q Q Q 10/1597 VT Mgr: Schopfer Don K O O O in?SS7 1RC Chmn: Sneh. Anand K O O O 'or)SS7 -

Dele:

INVAUD:

Deler REsOLUTCN:

Previously identined by Nu? O Yes ie) No Nun Diecropont Condstion O Yee 'E) No l

Review m, g Accepteblo Not Acceptable Needed Date VT Leed: Nort, Anthony A O O O VT Mort Schopfer, Don K b 1RC Chmn: Singh. Anand K g

Date:

O I O

.1 ,-

~

Prtreed 1o11/97 to UFb4 AM Page 1 or 2

Norttwast Utilities ICAVP DR No. DR MP34444 umstone unit 3 Discrepancy Report Printed 1041/9710 09.10 AM - Page 2 of 2

Northeast Utilities ICAVP DR No. DR MP3 0643 I

Millstone unk 3 Discrepancy Report Review Oroup: Conhgurecon DR VAUD Potenttel Operab6iety issue D6ecipl6ne: Elew ulDe

  • O Yee Diecrepency Typ Dreeno

@ No System'Procear RSS NRC &lgn6ncence levet: 4 Date faxed to NU:

Date Published: 11/2,97 D6ecrepency: Vendor Drawing Data Error Deectlpt6on: Vendor drawing 2362.200-164-043. Rev. O erroneously shows the horse power, full load and lock rotor current for the 2 ft Ib operator to be the same as the 5 ft lb operator. The 2 ft Ib operators are used on valves 3RSS*MOV23A through D. Thlt drawing also indicates the motor speed to be 1800 rpm; nameplate indicates 1700 rpm.

Rev6ew Vol6d lovel6d Needed Dele io/5SS7 inattator server, T. L. O O O O ior27/97 VT Lead: Nort, Anthony A O O VT Mort schopfer, Don K g O O 1o/2&97 IRC Chmn: Singh, Anand K O O O 10'30S7 Dele:

INVAUD:

Date:

RESOLUTION:

Previously identined by NU7 O Yee i#1 No Non Discrepent Condst6on U Yee (#) No Review Acceptable Not Acceptable Needed Date VT Lead: Nort. Anthony A O O VT Mort Schopfer. Don K IRC Chmn: Sin 0h, Anand K D.te SL Corronents:

Pnnled 1001/97 to 00 46 AM Pege 1 of 1 1

i

l 0 l Northeast Utilit;es ICAVP DR No. DR MP3-0544 i Millstone Unit 3 Discrepancy Report Review Group: Confguraten DR VALO Poterdial Operatdiity issue Discip ine: Elodncal Deegn D6ecreperny Type: Drawing Ow g

~

SystenVProcess: RSs NRC Sign 6Acance level: 4 Date faxed to NU:

Date Published: 11/2/97 Diecrepency: Drawing discrepancies

Description:

The following drawing discrepancies are noted:

1. Support mark number #111 is shown as type R203A on drawing EE 34EE Rev. 6. The drawing does not list R203A in table of support types and the Cable and Raceway Program (TSO2) lists R203 for trays supports for trays 3TX 014N, 3TK007N and 3TC 013N, which includes support #111.
2. Drawing 12179-EE 46D, Rev 13, shows put! box '3JB 0161*

located in the containment at elevation 34 feet (drawing coordinates 1-6). This box is actually 3JB*0161. The non safety related box (3J3-0161) is located at elevation .18 feet.

3. Note 2 of Drawing, Indicates that all trays are 30 inches wide unless noted otherwise. Trays 3TC0014N,3TC0015N, and 3TX016N are shown on this drawing and without a commodity type indicating a different tray size displayed for these trays.

TSO2 indicates these trays are 18 inches wide The trays are depicted on the drawing similady to trays that are listed as 30 inches.

Review Val 6d inval6d Needed Date init6ator: Server, T, L

@ Q Q 10/1&S7 VT Lead: Neri, Anthony A O O O in27ss7 VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand K O O O 2S' $S7 Q O O SS'3SS7 Date:

INVALID:

Date:

RESOLUTION:

Prev 6ously identified by Nu? O Yee t9) No Non Discrepent CondAlon O Yes t80 No Review Acceptable Not Acceptable Needed Date VT Lead: Nor), Anthony A VT Mge: Schopfer, Don K IRC Chmn: Singh, Anand K SL Comments:

Printed 1o'31/9710.1o 32 AM Pege 1 of 1 ,

ICAVP DR No. DR-MP3 0548 Northeast Utilities Millstone unn 3 Discrepancy Report I ftr.4ew neoup: confguobon DR VALlo Review Aw. system Design g g D6scipline: EW Desgn O von Diecrepancy Type: Dewing

(#) No SystemProcaea: Rs3 NRC signifncance level: 4 Dele faxed to NU:

Date Published: 11/2/97 D6 crepancy: Conduit Support Differences Ducription: 1. While checking supports CS 7503 and CS 7445,it was noted that the conduit fitting cover for 3CX900PB4 was missing. The fitting's open face is upward. Location is near CS 7445.

2. An unidentified / unscheduled 2' con 6uit, which according to Conduit Support Log 12179-FSK-CS 3348, Rev. 6, is supported by support CS 3348,is not clamped on support CS-3348. The resulting span is over 10' 6* which exceeds the allowable span of 8' 0* per BE 52AN Rev. 5 and AU Rev. 4..
3. Field inspection of support R208A-098 found a section of 3/4 inch Steel conduit that is not clamped to the support, but is resting on conduit supported by R208A-098. This conduit is in need of support in this approximate location to meet span critoria and to take credit for the tray support supporting the conduit, a clamp / attachment is necessary.
4. Conduit Support Log (CSL)12179-FSK-CS-1343, Rev. 7, with no outstanding change documents, lists conduits 3CX900PA, 3CX900WB2, and 3CX900PC2 as supported by this support.

These condults are not included in TSO2 as supporied by this support. TSO2 lists an additional condult,3CX900PC, not shown on the CSL, as supported from this support.

5. Conduit Support Log (CSL)12179-FSK-CS-3058, Rev. 5, with no outstanding change documents, lists conduit 3CX900PA4 as supported by this support. This conduit is not included in TSO2 as supported by this support. TSO2 lists an additional conduit, 3CX900PA, not shown on the CSL as supported from this support.
6. Conduit Support Log (CSL) 12179-FSK-CS-4798, Rev. 2, without outstanding change documents, indicates that conduit 3CX9000B4 is supported from support CS-4798. TSO2 also indicates this conduit is supported by the support. The detail shown on the draw lng is for a field installed junction box and does not include any attachment of condult. Further. the conduit is installed in the field with two supports, CS-7482 and 7483 which are listed in TSO2 and the CSLs correctly.

Review Valid invalid Needed Date initiatort sarver.T.L 0 0 0 10/'SS7 VT Lead: Neri, Anthony A Q Q Q 1 0'27/97 VT Mgr: schopfer, Don K O O O 'n'2SS7 IRC Chmn: Singh, Anand K Q Q Q 10/3097 Printed 10'31/971o.11:11 AM Page 1 of 2

i Northeast Utilities ICAVP DR No. DR MP3 0646 Millstone Unit 3 Discrepancy Report Date:

DNAUD:

Date:

RESOLUTION:

Provtously identined by NU7 U Yes @ No Non Discrepent CondNion U Yes '9) No Review Acceptable Not A - =; ^ 1 Nooded Date VT Lead: Nort, Anthony A VT Mgri Schopter,0w K IRC Chmn: Singh, Anand K Dele:

O J B SL Cormwnts:

Printed 1G"J1/97 to 11:17 AM Page 2 of 2

s*

Northeast Utilities - ICAVP DR No. CR-MP3-0547 Millstone Unit 3 Discrepancy Report Revkw Group. Connpurshon DRVAUD Potential operetnisty issue Discipline: EW

  • D6ecrepency Type: Drewmg O Yes SystemProcess: Rss g

NRC Significance level: 4 Date Faxed to NU:

Date Published: 11/2/97 7 Dkcrepeacy: Tray Support Configuration

i. Deectlpt6ca: 1. Field inspection of support R208A-0W found a horizontal section of PS-201 style strut attached tr. the side vertical member towards a work platform whit.h 15 not shown on the detail drawing EE 34HC Rev. 5. Note: the strut is not attached to work platform. No ooen documents discuss its add; tion.

! 2. Field inspecth i of support R204-105 found a vertical section of PS 200 styb strut attached below the bottom member.

-f Nothing is attached to this added piece. The detail drawing EE-34HC Rev. 5 does not show this member. No open documents discuss its addition.

3. Field inspection of support R150-055 found that the bottom tray shelf member is insimited at a 45 degree angle for proper fit-up to tray. This is not noted on the detail drawing EE 34HA Rev.

6 and is not covered by any listed open document.

4. Drawing EE 34T Rev. 1, indicates that all tray covers for instrument trays shall be flat. This is consistent with the tray detail drawing EF-34MJ Rev.3 and tray cover identification drawing EE 34TQ Rev. 2 which indicates top and bottom covers. The Cable and Raceway Program (TSO2) indicates that at least one of the covers for tray riser 3TX1n4P is vented. Field observation of the tray identified a vented cover on the bottom and flat on the top.

Review Vaid invalid Needed Date inittetor: server, T. L Q O O 10/1S'S7 VT Lead: Nort, Anthony A Q Q Q 10/27/97 VT Mgr: Schopfei. Don K IRC Chmn: Singh, Anand K B O O $o/28/a7

[ Q Q 10/30/97 Date:

INVAWO:

m Date:

RESOLUTION:

Previou4ty identined by Nu7 Q Yes @ No Non Diecrepent CorEktion O Yes @ No Review Acceptable .Not Acceptable Needed Date VTI %d: Neri, Ardhony A VT Mgr: Schopfer. Don K INC Chmn: singh. Anend K Date:

Printed tof31/971o:12-46 AM Page 1 of 2

.o l ,'

Northeast Utilitier- lCAVP DR No. DR-MP3 0647 Millstone Unit 3 Discrepancy Report SL Comments:

C

}

Printed 10011971012:52 AM Py 2 d 2

i l r'

i-1 Noftheast Utilities ICAVP DR No. DR-MP3 0665 Millstone Unit 3 Discrepancy Report Review Group
ConAgurohon DR VALID Potential Operebusy issue 06ecaphne: Electrical Desig" Diecropency Type: Insteheten implementeuon Om SystemProcess: Rss (5) No NRC Significance level: 4 Date faxed to NU:

Date Put'hhed: 11/2/97 Discrepancy: Cable and Reaceway datt not in agreement with installed conditions D**ce$ation: 1. The Cable and Raceway Program (TSO2) Indicates that conduit 3CC9700C8 is 21 feet long. Field ve6;fied conduit is approximately 2 feet long.

2. The Cable and Raceway Program (TSO2) Indicates that conduit OC7570A is 12 feet long; the field installed conduit is approximat, 'y 12 inches long.
3. The Cable and Raceway Program (TSO2) indicates that <

conduit 3CC9700A8 is supported by 8 supports. Field observaticn of the conduit indicates that the conduit is supported ,

by 7 supports.

4. The Cable and Raceway Program (TSO2) Indicates that conduit 3CK7000B3 is supported by 12 supports. Field observation of the conduit Indicates t'1st the conduit is supported ,

by 11 supports.

5. The Cable and Racew1y Program (TSO2) likhcates that conduit 3CC9700C7 is supported by 12 supports. Field observation of the conduit indicates that the conduit is suppoited by 0 supports.
8. The Cable and Raceway Program (TSO2) indicates that conduit 3CC7560G4 is supported by 10 supports. Field observation of the conduit indicates that the cradult is stached to 11 supports.
7. The Cable and Raceway Program (TSO2) indicates that -

conduit 3CC7560G4 is supported by 8 suppo's . F:cid observation of 'he conduit Indicates that the conduit is atti.ched to only 7 supports.

8. The Cable and Raceway Program (TSO2) ini.licates that conduit 9CC764PE3 is supported by 2 supports. Field Gservation of tne conduit indicates that tha conduit is supported ty 3 supports.
9. The Cable and Raceway Program (TSO2) Indicates that conduit 9CC764PB2 is supported by 4 supports. Field observation of the conduit indicates that the conduit is supported by 5 supports.
10. The Cable and Racew1y Program (TSO2) indicates that conduit 3CC763DC4 is supported by 14 supports. Field Printed 10f31/9710:13:16 AM Page 1 of 2

l s+

l .

l Northeact (Milities ICAVP DR No. DR MP3-0666 Millstone Unit 3 Discrepancy Report observation of the conduit indicates that the conduit is supported by 15 supports.

11. The Cable and Raceway Program (TSO2) indicates that conduit 3CH76000 is supported by nine supports. Field observation of the conduit indicates that the conduit is supported by six supports.
12. The Cable and Raceway Program (TSO2) indicates that conduit 3CX97 CPS is supported by 12 supports. Field observation of the conduit indicates that the conduit is supported by 11 supports.
13. The Cable and Raceway Program (T302) Indicates that cor.duit 3CX970PB1 is supported by 12 supports. Field observation of the conduit indicates that the conduit is supported by 13 supports.

Review Vend invahd Needed Date teletor: st w ,T.L VT Lead: Nort, Anttmy A a O O 0/15"S7 VT Mgr: schopfer, Don K O O O ior27/97 Q O O $S = 7 1RC Chmn: singh, Anand K O O O n'3CVS7 Date:

INVALID:

Date:

REs0LUTION Prov6ously identified by NU? O Yes @) No Non Discrepant Condition U Yes @ No Review initiator: (none)

VT Lead: Nort, Anthony A O O G VT Mgr: schopfer, oca K iRC Chmn: singh, Anand K O Date:

st Conwnents:

Printed 10/31S710:13.22 AM Page 2of 2

s*

Northeast Utilities ICAVP DR No. DR-MP3 0556 Millstone Unit 3 Discrepancy Report Review oroup: Conneurshon DR VAuo RwW Element System Dwen Po entlel Opereb4Nty issue D'=ipNae: t- D=ien D6 ecto wicy Type: Instemation implementaten o y, SystemProcess: QS$

gg NRC Significence level: 4 Date faxed to NU:

Date Published: 11/2/97 Discrepency: Inadequate Spacing Ducripthn: The valve operator for 30SS*MOV200 is located within % of an inch of the ESF building building steel. This valve is attached to piping anchored at a Containment penetration, Given the established 4 inch seismic gap between buildings, it appears that a potential seismic interaction condition exists, Review Vend inveNd Neede1 Dele initiator: Server, T. L '

0 0 0 1or$SS7 VT Leed: Neri, Anthony A O O O 0G787 VT Mgr: Schopfer, Don K O O O tocaS7 IRC Chmn: Sir?gh, Anand K O O O 10/30S7 Date:

INVALID:

Date:

RESOLUTION:

Previously idonufled by NU7 U Yes @ No Non Discrepent Condition U Yes @ No Review Acceptable Not Acceptable Needed Date VT Leed: i4ert, Antnony A ,

VT Mgr: Schopfer, Don K . . ,

IRC Chmn: Singh, Anand K Date:

SL Comrrnts:

Printed to/31/9710:14:21 AM Page 1 of 1 l

g*

Northeast Utili+1es ICAVP DR No. DR-MP34323 Millstone Unit 3 Discrepancy Report Review oeoup: conngurstson DR INVAUD I

Potent 6el Operanditty leeue Diecipline: Piping Design Discrepancy Type: DrewW O Ya

@) No SysterWProcese: SWP NRC Signanceni.e level: 4 - Date faxed to NU:

Date Putdiehed: 11/297 Diecrepancy: SV/P Additional Walkdown Discrepancy in the Auxiliary Building Deecription: The following material condition item was found during the walkdown of a pipe support in the Auxiliary Building:

1.The metal cover on the insulation for line 3-SWP 150106-3 near support H003 is loose (Reference isometric drawing CP-319717 Sht 3 ReV 9),

Review Valid invetid Needed Date initletor: Reed, J. W D D D o/30'87 VT Leod: Nort, Anth my A O O O 'n27/'7 VT Mer: schopfer, Don K O O O stC chmn: singh, Anand K O O _O Dele: 10/13/97 l INVAUD: This discrepancy is considered invalid, it identifies a material condition issue in the plant, but not a finding against the design or licensing basis of the plant. This infonnation is provided to NU for their 1.1 formation in correcting this condition.

Date:

RESOLUTION:

Prevleuely idenufled by NU7 Q Yes to) No Non Discrepent Condition U Yes @ No Review Acceptable Not Acceptable Needed Date VT Lead: Nerl, /,nthony A _

VT Mgt: Schopfer, Don K tRC Chmn: Singh, Anand K O O O Date:

SL Commente:

l Pnnled 10/31/9710:15.51 AM Page 1 of 1

Northeast Utilities ICAVP DR No. DR-MP3-0520 Wilstone unit 3 Discrepancy Report -

Review Group: System DR INVAUD Potential Operabilty issue Diec6pline: Mechanical Design D6screpency Type: Ceiculation Om syenemtProcese: SWP

@ No E II 9 "Ih U 4 Date faxed to NU:

Dale Pubhehed' 11G97 Discrepency: Calculation 472P references a sp3cification that does not exist.

Descrisdion: Calculation 472P rev. O," Reactor Plant Component Coolinn Water Temperatutre with Change in Service Water Temperature" references specification 2214.412-336. This specificc00n does not exist. The correct reference is specification 2214.413-446. This discrepancy is typigraphical In nature and does not affect system functionality.

Review veed loveild Needed Date initiator: Dionne, e. J.

[ Q Q 10/2&97 VT Lead: Nort, Anthony A O O O 10/27/97 VT Mgr: Schopfer, Lon K O O O IRC Chmn: Singh, Anand K O O O Date: 10/27/97 INVAUD: This condition represents a typograDhical error which does not affect the calculation conclusions. Typographical errors are outside the scope of the ICAVD.

Date:

RESOLUTION.

Previounty identitled by NU7 V Yes t#) No Non Discrepent condMion Q Yes @) No Review Acceptable Not Accogdeble Needed Date inMor: (none)

VT Leed: Nei, Anthony A O O O VT Mge: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Corrmente: