Forwards Insp Repts 50-254/98-20 & 50-265/98-20 on 981014- 1201.No Violations Noted
ML20198N405
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/28/1998
From: Reynolds S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kinglsey O
COMMONWEALTH EDISON CO.
Shared Package
ML20198N409 List:
References
50-254-98-20, NUDOCS 9901060120
Download: ML20198N405 (3)


See also: IR 05000254/1998020

Text

'

.

, , .

December 28, 1998

Mr. Olivcr D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATYN: Regulatory Services

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

QUAD CITIES INSPECTION REPORT 50-254/98020(DRP);

50-265/98020(DRP)

Dear Mr. Kingsley:

This refers to the inspection conducted October 14 through December 1,1998, at the

Quad Cities Nuclear Power Station. The purpose of the inspection was to determine whether

activities authorized by the license were conducted safely and in accordance with NRC

requirements. The NRC conducted routine resident inspections in this period. Based on the

inspectors' findings, overall performance at the Quad Cities station was safe. At the conclusion

of the inspection, the findings were discussed with those members of your staff identified in the

enclosed report.

While of low safety significance, some problems with operator control of system configuration

occurred. Examples included two fuel bundles placed in the wrong spent fuel pool cell, a

standby gas treatment switch in the wrong position, and a diesel generator valve not in the

proper configuration. Operators also approved work on a primary containment valve without

realizing the work made the valve inoperable. Although your identification and corrective

actions for the specific events were good, the events indicated areas where operator attention

should be better focused.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

J6fih A. Grobe for

Steven A. Reynolds, Deputy Director

Division of Reactor Safety

Docket Nos.: 50-254; 50-265

License Nos.: DPR-29; DPR-30

Enclosure:

Inspection Report 50-254/98020(DRP);

50-265/98020(DRP)

See Attached Distribution

See Previous Concurrences

DOCUMENT NAME: G:\\ QUAD \\QUA98020.DRP

To receive a copy of this document, Indicate in the box *C" = Copy without attachrnent/ enclosure *E' = Copy with attechment/ enclosure

'N' = No copy

OFFICE

Rill

l

Rlli

l

Rlil

_g

l

NAME

Lerch:co

Ring

Reynoldk P

,

DATE

12/ /98

12/ /98

12rf908

OFFICIAL RECORD COPY '

9901060120 981228

l

PDR

ADOCK 05000254

G

PDR

'

.

.

,

.

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:-

QUAD CITIES INSPECTION REPORT 50-254/98020(DRP);

50-265/98020(DRP)

Dear Mr. Kingsley:

This refers to the inspection conducted Octo'oer 14 through December 1,1998, at the

Quad Cities Nuclear Power Station. The purpose of the inspection was to determine whether

activities authorized by the license were conducted safely and in accordance with NRC

requirements. The NRC conducted routine resident inspections in this period. Based on the

inspectors' findings, overall performance at the Quad Cities station was safe. At the conclusion

of the inspection, the findings were discussed with those members of your staff identified in the

enclosed report.

Sor.1e problems with operator control of system configuration occurred, including two fuel

bundles placed in the wrong spent fuel pool cell, a standby gas treatment switch in the wrong

position, and a diesel generator valve not in the proper configuration. Operators also approved

work on a primary containment valve without realizing the work made the valve inoperable.

Although your identification and corrective actions for the specific events were good, the events

indicated areas where operator attention should be better focused.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Steven A. Reynolds, Deputy Director

Division of Reactor Safety

Docket Nos.: 50-254; 50-265

License Nos.: DPR-29; DPR-30

Enclosure:

Inspection Report 50-254/98020(DRP);

50-265/98020(DRP)

See Attached Distribution

DOCUMENT NAME: G:\\ QUAD \\QUA98020.DRP -

, Te reconve a copy of thle document. Indicate in the boa *C" = Copy without ettechment/ enclosure *E' = Copy with attachment / enclosure

w = ne .o,y

OFFICE

Rlli

l6 Rlli

lf5

Rlli

l

l

NAME

Lerch:coMfn

Rin M L

Roynolds

DATE

12A1/98

12/0/98

12/ /98

OFFICIAL RECORD COPY

~Q

y .

-

..

.

_

_ . _ _ . _ . _ _ . . . _ . . _ . _ - _ _ _ . _ _ . _ . .

_ . . . _ . . . _ - - _ _ . _ . . _ - . . _ . _ . _ _ . _

_._-

,.

,o

,

l

O. Kingsley ,

2-

. cc w/ encl:

D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Regulatory Services Manager

D. Greene, Licensing Director

DCD - Licensing

J. Dimmette, Jr., Site Vice President

W. Pearce, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

1

R. Hubbard '

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

W. Leech, Manager of Nuclear

MidAmerican Enere c Company

Distribution:

. SAR (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enci

C. Pederson, Rill w/enct

B. Clayton, Rlll w/enci

SRI Quad Cities w/enci

DRP w/enci

TSS w/enci

DRS (2) w/enci

Rlll PRR w/enci

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

[//

0B0054

m

ww

y